HomeMy WebLinkAbout2004-297 Board of County Commissioners
1810 25th Street
Vero Beach, Florida 32960
Telephone : (772) 567-8000
FAX : (772) 778-9391
Indian River County Project No . 0446
Kings Highway Extension (58th Avenue) South , Phase 1
Oslo Road to 17th Street SW
IRC Project No . 0446
WORK ORDER NO . 6
FOR
PROFESSIONAL SURVEYING SERVICES AGREEMENT
FOR ANNUAL SURVEYING AND MAPPING SERVICES
WITH
KIMLEY-HORN & ASSOCIATES , INC .
In accordance with Contract No . 0390
This Work Order No . 6 is in accordance with the existing AGREEMENT dated September 23 , 2003 ,
and the extension thereof, between Kimley-Horn & Associates , Inc . ( SURVEYOR) and Indian River
County (COUNTY) .
This Work Order No . 6 amends the agreement as follows :
SECTION I — PROJECT LIMITS
Kings Highway Extension South (58`h Avenue) , Phase I — the SURVEY LIMITS
shall begin at a point on Kings Highway that is 150 ' north of Oslo Road and 9t" Street S . W. and continue
south on Kings Highway to a point that is 1500 ' south of 17th Street SW. Oslo Road will be surveyed
from a point 150 ' west of Kings Highway to the east end of the bridge over Lateral ` B " Canal . 17th
Street SW will be surveyed 500 ' west of Kings Highway . Centerline profile elevations of the 17 'h Street
SW roadbed lying east of Lateral ` B " Canal will be acquired for a distance of 1200 ' . 13th Street SW will
be surveyed 500 ' east and 500 ' west of Kings Highway .
SECTION II — SCOPE OF SERVICES
The survey will include the establishment of a survey baseline with horizontal control set every 500 ' and
vertical control set every 1000 ' (on the reference points outside the proposed area of construction) ,
location of above ground improvements and trees 6" diameter and greater at breast height, lying within
the right-of-way of Kings Highway, 13th Street SW and 17th Street SW . Surface evidence of underground
utilities will be located. Cross-section elevations will be obtained at 100 ' intervals and visible high and
low areas along Kings Highway from the westerly toe of slope of Lateral ` B " Canal to a point 75 ' west of
the right of way line . The delineation of tree lines and vegetation of concern will be shown within the
additional 75 ' strip . Cross- section elevations of the entire canal right-of-way will be obtained at 500 foot
intervals . Centerline profile elevations of the 17th Street SW roadbed lying east of Lateral ` B " Canal will
be acquired for a distance of 1200 ' . Centerline profile elevations along the driveways and the lowest
floor elevations for those homes lying west of Kings Highway are included . Drainage structures will be
located and rim/invert elevations obtained. If a structure is inaccessible or the drainage pipes are
recessed, an elevation on the bottom of the structure will be determined.
Deliverables will include digital and signed/sealed copies of the Topographic Survey and Horizontal and
Vertical Control Survey .
CAWINNnTemporary Internet Fi1es\0LK6\ircwo6.doc
SECTION III - TIME FOR COMPLETION
An 80% submittal will be delivered to the County for review and comments within 60 calendar days
from Notice to Proceed . Final submittal will be delivered to the County within 30 calendar days of
receipt of the 80 % submittal comments .
SECTION IV - COMPENSATION
The COUNTY agrees to pay, and the SURVEYOR agrees to accept, a fee for services rendered
according to the " Scope of Services " identified in Section III of this Work Order No . 6 , a Lump Sum
of $24 , 910 . 00 .
The AGREEMENT is hereby amended as specifically set forth herein . All remaining sections of the
AGREEMENT shall remain in full force and effect, and are incorporated herein .
IN WITNESS WHEREOF the parties hereto have executed these presents this 23rd day
ofNovembe2004 .
KIMLE *& SSOCIATES , IN INDIAN RIVER COUNTY , FLORIDA
C BOARD OF COUNTY C MMISSIONERS
BY : BY .
fro Arthur R. Neub a S CliaiFri s
Title :
Approved e � cV �lbl^ ' k 4
ATTEST .
Jeffrey •,$ it
rtoI
Clerk of > 1rct � ># F.° r,
BY : PA'FRICIA e1dl . Rf�@ �' `r
DEPUTY CLERK OF U
, RT
T
JOSEPH BAIRD
ijnMIN�ISTk
R
f LLIAM G . COLLINS , II
COUNTY ATTORNEY
CAWINN Temporary Internet Fi1es\0LK6\ircwo6.doc
Kimley- Horn and Associates , Inc .
Kimley- Horn Project : INDIAN RIVER COUNTY KINGS EXTENSION SOUTH PHASE ONE -
and Associates , Inc . FILE NO .
10/28/04
ESTIMATE COST : $24 , 910 . 00 SHEET
PROJECT 3- MAN 2- MAN 2-
SURVEYOR 3- UNIT UNIT GEODE
PSM UNREGISTER 3-MAN 2 - MAN GPS GPS TIC SURVEY CLERIC
Task Description PM PSM ED CREW CREW CREW CREW TECH CAD/TECH AL Task Totals
RESEARCH 3 300 . 00
RECOVER VERTICAL CONTROL 2 190 . 00
ESTABLISH VERTICAL CONTROL(21V 1 10 1 , 050 . 00
RECOVER HORIZONTAL 1 5 10 5 2 , 150 . 00
ESTABLISH HORIZOINTAL CONTROI 2 10 1 10 5 29725 . 00
RECOVER ROW/PROP CORNERS 10 950 . 00
RECOVER SIDE STREET ROW -(4 ) 8 760 . 00
CALC ROW 'S AND SIDE STREETS 3 7 755 . 00
FIELD TOPO 91600 ' @ 1500'/DAY)) 55 51225 . 00
X-SEC LATERAL B CANAL @5001 STA 10 950 . 00
MONUMENT BL @ 1000' STA 5 2 1 10 2 11280 . 00
BASELINE ELEV'S A T 1000' STA 2 10 19150 . 00
DOWNLOAD DATA 10 650 . 00
DRFT TOPO/CONTROL MAP IN CAD 3 60 49200 . 00
0 . 00
swz
REFERENCE SEC COR / PI 'S ( 10 ) 3 10 5 11575 . 00
QC/QA 10 12000 . 00
SUM OF HOURS 30 0 0 0 140 0 0 20 10 84 0 284 . 00
HOURLY RATE $ 100 . 00 $ 110 . 00 $75 . 00 $ 115 . 00 $95 . 00 $ 125 . 00 $0 . 00 $ 115 . 00 $85 . 001 $65 . 001 $40
. 00
TOTALS THIS SHEET 1 $3 , 000 . 00 $0 . 001 $0 . 00 $0 . 00 $ 13 , 300 . 00 $0 . 00 $0 . 00 $29300 . 00 $850 .
001 $5 ,460 . 00 $0 . 00 $24 , 910 . 00