HomeMy WebLinkAbout2005-032 XPage.1 of 2
Board of CountyCommissioners
1810 25th Street 0(3- as
Vero Beach, Florida 32960
Telephone : (772) 567-8000 FAX: (772)-778-9391
Indian River County Project No . 0501
Oslo Road Phase 1 , Right of Way Mapping - US Highway No . 1 to 27th Avenue
WORK ORDER NO . 7 (Engineering)
FOR
PROFESSIONAL SURVEYING SERVICES AGREEMENT
FOR ANNUAL SURVEYING AND MAPPING SERVICES
WITH
KIMLEY-HORN & ASSOCIATES , INC .
In accordance with Contract No . 0390
This Work Order No . 7 is in accordance with the existing AGREEMENT dated September 23 , 2003 ,
and the extension thereof, between Kimley-Horn & Associates, Inc . (SURVEYOR) and Indian River
County (COUNTY) . This Work Order No . 7 amends the agreement as follows :
SECTION I — PROJECT LIMITS
Oslo Road Phase I Right of Way Map — the SURVEY LIMITS shall begin at the FDOT baseline of US
Highway No . 1 and continue westerly on Oslo Road to a point that is 100 ' west of 270' Avenue .
SECTION II — SCOPE OF SERVICES
The scope of services for this Work Order No . 7 is the preparation of a Right-of-Way Survey for that
portion of Oslo Road lying between US Highway No . 1 and 27a' Avenue . The Right-of-Way Survey will
be prepared in accordance with all sections hereon, attached exhibits "A" (Man hours/cost), ` B " (Check
list) and Chapter 177 & Chapter 472 Florida Statutes and Chapter 61G17 (Florida Minimum Technical
Standards) as set forth for these types of surveys and the County Right of Way Map Checklist (attached
hereto as Exhibit "B ") , The Murphy Act Reservation lines as provided by Indian River County will be
graphically depicted on the Right of Way Map . Coordination with capital projects and planning for any
new or proposed right of way acquisitions will occur as part of the 60% County review. Revisions to the
survey due to new or proposed right of way acquisitions will be made one ( 1 ) time, immediately after the
60% County review.
Deliverables for the 60% County submittal will consist of digital and paper copies of the survey.
Deliverables for the final submittal to the County will consist of a digital file and 1 signed/sealed mylar.
SECTION III - TIME FOR COMPLETION/DELIVERABLES
a) The 60% submittal will be delivered to the County for review and comments within 90
calendar days from Notice to Proceed. Final submittal will be delivered to the County within
60 calendar days of receipt of the 60% submittal comments .
b) The SURVEYOR shall prepare its Work Product (Digital and paper versions) so that the
COUNTY, consultants or the public can readily use it for design and analysis of the area defined.
It shall contain all information necessary for a third-party surveyor to independently recreate
and/or utilize the survey work. It is acknowledged that all final products become property of
Indian River County and will be available for use by the public at large .
c) The SURVEYORS work product shall meet or exceed the minimum standards as defined by
Section II and exhibit "A" and "B " attached hereto and made part of this agreement, or the
COUNTY will not approve the SURVEYORS request for payment.
F:\Engineering\Capital Projects\0390-Annual Survey Contracts 2003-2004-2005Wmley Hom\2004-2005\Oslo RW Ph 1 \ircwo7-oslo phase 1
row map 12-01 -04.doc
i
Page 2 of 2
SECTION IV - COMPENSATION
The COUNTY agrees to pay, and the SURVEYOR agrees to accept, a fee for services rendered
according to the " Scope of Services " identified in Section II of this work order, man hours exhibit
"A" and checklist exhibit "B " attached hereto this Work Order No . 7 , a Lump Sum of $43 , 045 . 00 .
All and/or any additional services not described hereon shall be pre -approved by the COUNTY .
Approved additional services shall be invoiced at the rates disclosed in the approved fee schedule
with the SURVEYOR for the contract year of October 1 , 2004 through September 30 , 2005 .
All invoicing and payments shall be accordance to original Professional Surveying Services
Agreement for Annual Surveying and Mapping Services, contract No : 0390 with the COUNTY and as
stated in Section III, IV hereon .
The AGREEMENT is hereby amended as specifically set forth herein . All remaining sections of the
AGREEMENT shall remain in full force and effect, and are incorporated herein .
IN WITNESS WHEREOF the parties hereto have executed these presents this 18th day
ofJanuar.,,,,_y2005 .
KIMLEY-HORN &ASSOCIATES , INC . INDIAN RIVER COUNTY , FLORIDA
BOARD OF COUNTY COMMISSIONERS
BY : BY : (F V S. LS4
THOMAS S . LOWTHER,..ClxirmaA _
Title : yLfi
Approved by the
5 005
t
ATTEST : r
&A ,hirci it
BY : o�
DEPUTY CLVIM�OF COURT
SEPH A BAIRD
YI INIS T
WILLIANf ri , COrl INS , II
COUNTY ATTORNEY
F :\Engineering\Capital Projects\0390-Annual Survey Contracts 2003-2004\Kimley Hom\2004-2005\Oslo RW Ph 1 \ircwo7-oslo phase 1 row map
12-01 -04 .doc
IIIA Kimley- Horn and Associates , Inc .
Kimley- Horn
Project : INDIAN RIVER COUNTY OSLO PHASE 1 I . R. C . Proj No : 0501
and Associates , Inc . FILE NO . 01 /05/05
4110 ` ' ESTIMATE COST: $43 ,045. 00 SHEET
PROJECT 3- MAN 2- MAN 2-
SURVEYOR 3- UNIT UNIT
PSM UNREGISTER 3-MAN 2- MAN GPS GPS GEODETI SURVEY CLERIC
Task Description PM PSM ED CREW CREW CREW CREW C TECH CAD/TECH AL Task Totals
RESEARCH 3 10 950 . 00
RECOVER HORIZONTAL 10 10 5 2 ,525 .00
ESTABLISH HORIZOINTAL CONTROL 10 10 5 29525 . 00
RECOVER ROW/PROP CORNERS 1 /2 mile/da 25 10 5 31950 .00
RECOVER SIDE STREET ROW -(21 ) 21 19995 .00
RECOVER US 1 ROW-BL 5 10 4 19710 .00
RECOVER FEC ROW CURVE 5 10 4 1 ,710 .00
RECOVER OLD DIXIE ROW 8 15 5 21550.00
RECOVER LATERAL J ROW 5 10 4 11710 .00
CALC ROW'S AND SIDE STREETS 20 16 3 ,040.00
MONUMENT BL @ 500' STA 20 2 20 5 21425.00
DOWNLOAD DATA 15 975.00
DRAFT ROW MAP IN CADD 10 80 6 ,200 .00
REVIEW O AND E REPORTS 40 57 7 , 705.00
REFERENCE SEC COR / PI 'S 10 15 10 21075.00
QC/QA 10 11000 .00
SUM OF HOURS 108 0 0 0 146 01 01 30 15 210 0 509 .00
HOURLY RATE $ 100 .001 $ 110 .00 $75 .001 $ 115.001 $95.00 $ 125.00 $0 .00 $ 115 .00 $85.00 $65 .00 $40 .00
TOTALS THIS SHEET $ 10 ,800 .00 $0 .001 $0 .00 $0.00 # #### $0 .00 $0 .001 $3 ,450 .001 $ 1 ,275 .001 $ 13 ,650 .00
$0 .00 $43 ,045 .00
"H I B I T
E 'A
IR CO OSLO PHASE 1 hr ex A Pagel
y
EXHIBIT "B"
INDIAN RIVER COUNTY
RIGHT OF WAY MAP CHECKLIST
All Right-of-way projects shall adhere to Chapter 177 & 472 , F. S . and
Chapter 61G17, F.A . C . as minimum and be certified as such .
1 . Cover sheet/Key sheet.
2 . Survey notes and report sheet (As applicable)
3 . Survey Control sheet (As applicable and or necessary)
4 . Subsequent R/W map sheets .
5 . Supply a Box or area for county acceptance and/or certification .
6 . Title Box of each sheet must contain :
a. County
b . State Road Number
c . Designed, drawn and checked by (use names or initials) & date
d. Scale
e . Field Book References
f. Sheet Numbers to be in numerical order ( 1 , 2 , 3 , 4, etc . ) NOT ( 1 , 1A, 1B ,
2 , etc . )
7 . Any notes necessary to set out the type and/or purpose of the map shall be shown .
8 . Show pertinent dimensions and bearings in the following fashion as the case may
be :
a. Plat — (P)
b . Computed — (C)
c . Field — (F)
d. Deed (D)
9 . Table of Ownerships shall show :
a. Parcel Number
b . Owners Name
c . Recording Data
10 . Show stations and offsets to all Right of Way Breaks .
11 . Show monumented baselines and all references thereto .
12 . Verify that computed distances and bearings are supported by field
measurements .
13 . Verify and monument significant elements of Baseline alignment shown.
(i . e . curves , bearings and P . I. Stations)
14 . Ensure that significant elements of all curves are shown and are correct . Also
show curve data on all sheets where they appear.
15 . Begin and End R/W Project with Stations .
16 . Stationing in field minimum 500 ' beyond beginning and ending of project.
17 . Baseline (equate to intersecting State or County Jobs by Station and job number
when available) as available .
18 . Projects shall be in NAD83/90 State plane coordinate system and bearings
reference shall be shown and must be clearly stated . Values shall be place on key
baseline monumentation.
19 . County/State lines
20 . Section
21 . Township
• 22 . Range
23 . Government Lots, Grants, etc .
24 . Sections and Y4 Sections (lines & corners) . Certified Corner reports of all
Section/ l /4 corners used in the course of survey shall be completed and/or
updated.
25 . City Limits by Name & Symbol ; Name of City, if job entirely within city limits
but does not cross-city limits .
26 . Land and Subdivision Ties (angles and/or, bearings & distances)
27 . Subdivision name and limits
28 . Plat Book and page (County)
29 . Lots and Blocks (key map — blocks only)
30 . Lot and Street dimensions (plat) .
31 . Show all original plat and R/W lines of record, if different from present time, with
dashed lines
32 . Show names of subdivision streets, plat book and page recording — also , show Lot
and Block number and Dimensions, Exceptions, Easements, and Vacated
portions .
33 . When property lines break the Right of Way on curve, show tangent bearings or
chord bearings .
34 . Show any replat of a subdivision — show old subdivision when necessary to clear
up former acquisition or old title references — use system of dashed lines, dotted
figures, etc . , with ties shown and name and plat book reference indicated
35 . Stations and Angle Ties to Existing Side Streets as surveyed and/or calculated
(where applicable)
36 . Show field located P . R. M . /major property corner or parcel ties by station/offset
to baseline/control line .
37 . Current Street Names
38 . Any buildings within 25 feet of proposed R/W line shall be dimensioned to R/W
line . If proposed R/W line is unknown, obtain buildings within +/- 100 ' of
existing R/W. Locations of buildings and large structures can be obtained from
field and/or photographic / planimetric methods, note shall be placed on plan as to
origin .
39 . Show and identify all easements on Detail Maps by width, use and ownership
(where applicable) .
U: \ECD\Manpower\standard I .R. C . Right-of-Way checklist 04 . doc