Loading...
HomeMy WebLinkAbout2009-250 9141 �69 s Z' IRC Work Order #8 CR510 W . of Al Sidewalk Survey aAo9 A �O September 22nd, 2009 Agenda / rte"` a liMi;* Board of County Commissioners Administration - Building A ( South) 1801 27th Street Vero Beach, Florida 32960 Telephone : ( 772) 567- 8000 FAX : 772-778 -9391 Project : WORK ORDER NO . 8 ( Engineering/Surveying ) FOR PROFESSIONAL SERVICES AGREEMENT ANNUAL SURVEYING and MAPPING/GIS SERVICES WITH Kimley- Horn and Associates , Inc . In accordance with Contract No . 0725 2007 - 2009 CR510 Sidewalk Improvements West of Al A. Topographic Survey within IRC Parcel for the Sidewalk Design Project IRC Project No . 0945 This Work Order No . 8 is in accordance with the existing AGREEMENT dated November 6th 2007 between Kimley- Horn and Associates , Inc . ( SURVEYOR ) and Indian River County ( COUNTY) . This Work Order No . 8 amends the agreement as follows : SECTION I — PROJECT LIMITS This Work Order No . 8 is for the SURVEYOR to perform all related field and office surveying and mapping services in connection with the design and planning of the CR510 sidewalk project fronting the IRC owned lands 330 ' long and located approximately 400 ' west of SR AIA . SECTION II as SCOPE OF SERVICES As agreed upon between SURVEYOR and the COUNTY , the SURVEYOR shall provide Professional Land Surveying services to complete all tasks as outlined in this Work Order No . 8 , and per the attached Scope of Services and Cost Outline ( Exhibit A) . ( Cont ) F : APublic Works\FNGINFFR ING DIVISION PROIFCTS\0945 -( R510 Sidewalk Improvementc W of AIA - Design & Survey\Survey\Mark O 'i .ors \WO 8\0725 W08 -sidewalk- 510 Imp W . of AIA Topo Survey 9-22-09 . doc IRC Work Order #8 CR510 W . of Al A Sidewalk Survey September 22nd, 2009 Agenda Page 2 of 3 SECTION 111 — TIME FOR COMPLETION & DELIVERABLES/WORK PRODUCT 1 . Project shall be completed as follows : • 30 calendar days of Notice to Proceed . 2 . Deliverables -The SURVEYOR shall provide the COUNTY : a . As defined in attached proposal and scope of services ( Exhibit A) and related digital AutoCAD and PDF files . b . Work Product and digital versions are to be prepared and submitted so that the COUNTY or other consultants can readily use it for the design and analysis of the area , as defined . It shall contain all information necessary for third - party surveyor to independently recreate and/or utilize the survey work . It is acknowledged all final products become property of the COUNTY and will be available for use by the public at large . c . The SURVEYOR ' S work product shall meet or exceed the minimum standards as defined by Sections II , III and IV . SECTION IV — COMPENSATION The COUNTY agrees to pay , and the SURVEYOR agrees to accept a total lump sum fee of $3 , 680 . 00 for the above described services rendered as identified in Sections I , II , and III of this Work Order No . 8 . All and/or any additional services not described hereon shall be pre - approved by the COUNTY . Approved additional services shall be invoiced at the rates disclosed in the approved fee schedule with the SURVEYOR for the contract year( s ) of November 6 , 2007 through November 5 , 2009 . All invoicing shall include project number ( 0860 ) , Work Order No . ( WO8 ) , Contract No . ( 0725) . Payments shall be in accordance with the original Professional Surveying and Mapping/GIS Services Agreement , contract No : 0725 with the COUNTY and as stated in Section ll , III and IV hereon . Remainder of page left blank intentionally E :APUbIic WorksTNGINEERING DIVISION PROJECTS\0945 -CR510 Sidewalk Improvements W of AIA - Design & Survey\Survey\Work Oders\WO 8\0725 WO8 -sidewalk- 510 Imp W . of Al A Topo Survey 9 -22- 09 . doc IRC Work Order #8 CR510 W . of A 1 A Sidewalk Survey September 22nd, 2009 Agenda Page 3 of 3 The AGREEMENT is hereby amended as specifically set forth herein . All remaining sections of the AGREEMENT shall remain in full force and effect , and are incorporated herein . IN WITNESS WHEREOF the parties hereto have executed these presents this 22nd day of Sept . 2009 . OWNER Kimley- Horn and Associates , Inc . BOARD OF COUNTY COMMISSIONERS INDIAN RIVER COUNTY, FLORIDA ( ignature) ( ature Wesley S . Davis , Chairman ac=vtla ! ee es (Printed nanw.1nd title Approved by BCC September 22 , 2009 Witnessed by : ATTEST : Jeffrey K . Barton , Clerk of Circuit Court - C � s � -- Depu Clerk (Printed name) Approved as to Form and Legal Sufficiency : William G . Collins II , OUNTY Attorney (Printed name) I M A dql oseph Baird , C UNT dmi ' trator F :\ PtjbhcWorks\ ENGINEERING DIVISION PROJECTS\0945 - CR510 Sidewalk Improvements W of Al A- Design & Survey\Survey\Work 0ders\WO 8\0725 W08 - sidewalk- 510 Imp W . of A1A Topo Survey 9 - 22-09 . doc EXHIBIT "A" IRC CONTRACT 0725 WORK ORDER NO, 8 Kimley -Horn Inc. IRC Project 0945 — CR510 Sidewalk Improvement W. of AlA, Design & Survey PROPOSAL Professional Survey Services Topographic Survey September 4 , 2009 Mr. Michael O ' Brien , PSM Indian River County 1801 27`h Street Vero Beach , Fl 32960 Re : County Road 510- proposed sidewalk - topographic survey services Dear Mr. O ' Brien : Kimley-Horn and Associates , Inc . (" KHA") is pleased to submit this letter agreement (the "Agreement") to Indian River County ("the Client" ) for providing survey and mapping services . Our scope of services , schedule, and fee are below . Scope of Services Task I — Preparation of a Topographic Survey This task will consist of the following : • We will prepare a topographic survey over the northern portion of parcel # 31392600000002000001 . 0 which is currently owned by Indian River County. • The specific limits of the topographic survey are : North limit is the centerline of County Road 510 ; South limit is 130 ' south of the centerline of County Road 510 ; The existing sidewalk within 100 east and west of the parcel will be located . • Cross sections will be taken every 50 ' . • All trees will be located on the parcel from the centerline of County Road 510 to a point 95 ' south of the centerline of County Road 510 . • Existing monitor wells will be located and the stamping shown on the survey. The survey baseline will be cleared and monumented . Benchmarks will be established on the survey baseline . The topographic survey will be prepared for the purpose of the design and construction of a new sidewalk . 1 EXHIBIT "A" IRC CONTRACT 0725 WORK ORDER NO. 8 Kimley -Horn Inc . IRC Project 0945 — CR510 Sidewalk Improvement W . of AlA , Design & Survey PROPOSAL Professional Survey Services Topographic Survey Additional Services Any services not specifically provided for in the above scope will be considered additional services and can be performed at our contract hourly rates . Deliverables Deliverables will consist of a digital file and 10 certified copies of the Topographic Survey . Schedule We will submit the topographic survey described in Task 1 within 30 days from written notice to proceed . KHA will perform the Scope of Services for a lump sum fee of $ 3 , 680 . All pennitting , application , and similar project fees will be paid directly by the Client . Closure In addition to the matters set forth herein , our Agreement shall include and be subject to , and only to , the terms and conditions in the existing AGREEMENT dated November 6 , 2007 , between Kimley-Horn and Associates , Inc . , (SURVEYOR) and Indian River County (COUNTY) under the contract number 0725 . Fees and times stated in this Agreement are valid for sixty (60) days after the date of this letter . We appreciate the opportunity to provide these services to you . Please contact me at 794-4050 if you have any questions . Very truly yours , KIMLEY- HORN AND ASSOCIATES , INC . De COS Good , PE Chris Demeter, PSM Vice President Vice President Kimley - Horn and Associates , Inc . Kimley - Horn Project : Wo 8 MISSING LINK SIDEWALK = TOPOGRAPHIC SURVEY and Associates , Inc . FILE NO . DATE 09/04/09 ESTIMATE COST : $35680 .00 SHEET Three- Project Survey Geodetic man One- man Surveyor Tech/Cadd Processing GIS GIS Admin/ Field Two -man GIS Data Task Description PSM unregistered Tech Tech Specialist Analyst/Tech Clerical Crew field Crew Collection Task Totals RESEARCH VERTICAL/ Hz 2 160 . 00 ESTABLISH HZ CONTROL 2 230 . 00 ESTABLISH VERTICAL CONTROL 2 230 . 00 UPDATE BOUNDARY SURVEY 0 . 00 TOPOGRAPHIC SURVEY-ONSITE obtain elevations 10 11150 . 00 TOPO 100 ' SIDEWALK OVERLAP 3 345 . 00 PROCESS FIELD DATA 2 160 . 00 DRAFT BOUNDARY SURVEY 0 . 00 DRAFT TOPOGRAPHIC SURVEY 1 8 780 . 00 QC ' QA 2 280 . 00 SITE VISIT 0 . 00 LOCATE TREES OF CONCERN 3 345 . 00 0 . 00 SUM OF HOURS 3 0 12 0 0 0 0 0 20 0 31680 . 00 HOURLY RATE $ 140 . 00 $ 110 . 00 $ 80 . 00 $ 100 . 00 $ 115 . 00 $ 80 . 00 $ 50 . 00 $ 135 . 00 $ 115 . 001 $ 80 . 00 TOTALS THIS SHEET $ 420 . 00 $ 0 . 00 $ 960 . 00 $ 0 . 00 $ 0 . 00 $ 0 . 00 $ 0 . 00 $0 . 00 $ 2 , 300 . 00 $ 0 . 00 $31680 . 00 K :Forms\Survey\MISSING-LINK TOPO Man-Hours.xls