HomeMy WebLinkAbout2004-282 CHANGE ORDER `1IGINAL t Oil V�L No . 3 PROJECT Indian River County So. County WTP Wellfield Rehabilitation, Phase II DATE OF ISSUANCE EFFECTIVE DATE OWNER Indian River County Department of Utility Services OWNER ' s Contract No . Bid No . 5102 CDM Project No . 6706-38392 - 151 CONTRACTOR Layne Christensen Company ENGINEER Camp Dresser & McKee Inc . You are directed to make the following changes in the Contract Documents : Description : _ Increase in Contract Price of $37, 534 . 00 Reason for change order: Additional treatment for Well No . 5 and time extension due to hurricanes Attachments : (List documents supporting change) Layne Christensen Letter Dated October 29 2004 CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME Original Contract Price Original Contract Times $__ 558 , 764 . 55 Substantial Completion : _ 120 days (4/ 16/04) Ready for final payment : 150 days ( 5/ 17/04) Days or dates Net changes from previous Change Orders Net change from previous Change Orders No . 1 to No .2 No . 1 to No . 2 $ ( 55 , 373 .46) 117 days Contract Price prior to this Change Order Contract Time prior to this Change Order $ 503 , 391 . 09 Substantial Completion : 237 days ( 8/ 11 /04) Ready for final payment : 267 days 9/ 10/04) Days or dates Net Increase (deer-ease) in this Change Order Net Increase in this Change Order $ 37 , 534 . 00 75 A.. days Contract Price with all approved Change Orders (I�,ontract Time with all approved Change Orders $ 540 ,925 . 09 Substantial Completion : 312 days ( 10/25 /04) Ready f6r4nal payment : 342 days ( 11 /24/04) Days or dates RECOMMENDED - APPROVED : ACCE>j'TE : By By : Ila % �;'' , 4 a00ce Engineer ( thorized Signature) Oxfoer (Authorized Si nature) Contfactor:�A Authorized Signature) Date : I� mzole4 Date : November 9 , 2004 Date : ® / EJCDC No . 1910- 8 ( 1996 Edition) Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America. 6706 -38392\ 10/29/04 00800- 19 VRB ATTACHMENT A ITEM DESCRIPTIONS Indian River County, Florida South County Water Treatment Plant Wellfield Rehabilitation, Phase II CDM Project No . 6706-38392-151 Change Order No . 3 Item No . 1 Description: Mobilization and Video of Well No . 5 Purpose . Additional testing of well due to loss of production. Cost: $6,854 . 00 Time : 5 days 2 Description: Chemical treatment of Well No . 5 Purpose : Chemical acidization of well formation to remove blockage on walls of open hole revealed during video survey performed in Item No . 1 . Cost: $30,680 . 00 Time : 10 days 3 Description: Hurricane Frances Purpose : Hurricane preparation and flooding in wellfield areas delayed project. Cost: $0 . 00 Time : 30 days 4 Description : Hurricane Jeanne Purpose : Hurricane preparation and flooding in wellfield areas delayed project. Cost: $0 . 00 Time : 30 days A-1 mh1820. doc ATTACHMENT B CHANGE ORDER COST & TIME SUMMARY Indian River County, Florida South County Water Treatment Plant Welifield Rehabilitation, Phase II CDM Project No . 6706-38392-151 Change Order No . 3 ITEM COST / CREDIT TIME (Days) 1 $6,854 . 00 5 days 2 $30, 680 . 00 10 days 3 $0 . 00 30 days 4 $0 . 00 30 days Totals $37,534.00 75 days This Change Order includes not only all direct costs of Contractor such as labor, material, job overhead, and profit markup, but also includes any costs for modifications or changes in sequence of work to be performed, delays, rescheduling, disruptions, extended direct overhead or general overhead, acceleration, material or other escalation which includes wages, and other impact costs . B-1 mh1820. doc ATTACHMENT C OCT . 29 . 2004 11 : 52AM LAYNE LAKELAND N0 . 704 P . 1i1 - l ayneem 'Mantic , a Elvis " n of Lam Qmisl+easen Gbmmnv 2740 Mlrne & Mill Road R Lakeland FL, 3= 14006 P Phone ($63) 666-2433 . Fax (863) 665-2196 * E-mall: 10790layietrlstensen.wm October 29, 2004 Quote# 04-7522 Jill Grimaldi CDM 1701 Highway A- 1-A, Suite 301 Vero Beach, Florida 32963 Reference : Acid and Bore Blaster 11 Treatment of Well # 5 Dear Jill , After speaking with Kirk Martin of CDM and yourself the recommendation was made to use a 15% Acid solution in two separate treatments and the Bore Blaster 11 to rehabilitate Well #5. We would also be chlorinating the well at the end of the process. The following is a breakdown of the cost for this scope of work. Item Quantity units Unit Price Total Crew Tirne 10 days $ 1 , 570 $ 15, 700 Acid, 01321 , Chlorine, and neutralizers 1 LS $ 61000 $ 61000 Bore Blaster 3 Tris $ 940 $ 2, 820 Custom Braden Head 1 LS $ 11000 $ 11000 Fuel Surcharge 11 days $ 120 $ 1 , 320 Per Diem 11 days $ 210 $ 2 , 310 Post Treatment Video 1 LS $ 11360 $ 11350 Misc. Cost (valves, gaskets, etc. ) 1 LS $ 160 $ 180 TOTAL 1 6 30,680 The Es malted Total would 40 $ 30,680.00, note that this job would be based on time and Imateriall and billed accordingly, As you can see this job is not a small under taking . There Is 340 feet of open bore, and custom pieces needed based on the well's construction . There is also the concern of environmental Issues that would need to be addressed i . e . , discharge of neutralized treated water on to the ground or if it needs to be taken to a lift station . Please review and contact me with any questions. Sincerely, 7373o E. Petrous Layne Christensen Cc: JW/LCC DG/LCC �G/CDM KM/CDM ATTACHMENT D