Loading...
HomeMy WebLinkAbout2004-129 a RECEIVED t, CHANGE ORDER No . 1 / PROJECT Indian River County So. County WTP Wellfield Rehabilitation , Phase II DATE OF ISSUANCE EFFECTIVE DATE OWNER Indian River County Department of Utilitv Services OWNER' s Contract No , Bid No . 5102 CDM Project No . 6706- 38392 - 151 CONTRACTOR Layne Christensen Company ENGINEER Camp Dresser & McKee Inc You are directed to make the following changes in the Contract Documents : Description : Miscellaneous project scope modifications See Exhibit A Reason for change order: Modification of project scope of work See Exhibit A Attachments : (List documents supporting change). . Exhibit A CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME Original Contract Price Original Contract Times $ 558 , 764 . 55 Substantial Completion : 120 days Ready for final payment : 150 days Days or dates Net changes from previous Change Orders Net change from previous Change Orders No . to No . No . to No . $ 0 . 00 0 days Contract Price prior to this Change Order Contract Time prior to this Change Order $ 5584764 . 55 Substantial Completion : 120 days Ready for final payment : 150 days Das or dates Net Increase (decrease) in this Change Order Net Increase in this Change Order $ 134626 . 54 45 days Contract Price with all approved Change Orders Contract Time with all approved Change Orders $ 572 ,391 . 09 Substantial Completion : 165 days Ready for final payment : 195 days Days or dates RECOMMEN D : APPRQ1 ACCEPTED : By : BY By : Enginee AuAthorized Signature) Cacti # as i rman Conctor ( A horized Signature ) BCS ` Date : �i S o Da$� u Date : 3 -D EJCDC No . 1910- 8 ( 1996 Edition) , Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America . ATTACHMENT A mh1600 Change Order.doc EXHIBIT A ITEM DESCRIPTIONS Indian River County, Florida South County Water Treatment Plant Wellfield Rehabilitation, Phase II CDM Project No . 6706-38392-151 Change Order No . 1 Item No . 1 Description: Chase and Lead Threads on Well No . 3 Column Pipe Purpose : Well No . 3 column pipe utilized to extend Well Nos . 1 and 2 while new Well No . 3 is under construction. Threads on existing column were found to be galled and needed repair . Cost: $1 ,500 . 00 Time . 9 days 2 Description: Upgrade Mechanical Seals/ Discharge Heads Purpose : Seals and discharge heads modified/ upgraded to be compatible with existing discharge head and conditions . Cost: $2,305 . 60 Time . 15 days 3 Description: Extend 24-inch steel surface casing Purpose : Extension required to meet clay formation. Additional 66 feet of casing was required to be set. Cost: $9,644 .38 Time : 3 days 4 Description: Extend 16-inch PVC Production Casing Purpose: Extension to improve well production. The casing was set to a final depth of 396 ft. , 11 ft. deeper than originally estimated . Cost: $1 ,317.58 Time . 3 days ATTACHMENT B A-1 mh1600 .doc 5 Description: Flanged Column Pipe Credit Purpose : Credit for use of flanged column for Well Nos . 5 and 6 in lieu of specified threaded column yielded . Cost: ($1 , 141 . 02) Time : 0 days 6 Description : Telemetry System Delivery Purpose : Approved system delivery delayed in fabrication. Cost: $0 . 00 Time : 15 days A- 2 mnisoo.aoc EXHIBIT B CHANGE ORDER COST & TIME SUMMARY Indian River County, Florida South County Water Treatment Plant Wellfield Rehabilitation, Phase II CDM Project No . 6706-38392-151 Change Order No . 1 ITEM COST / CREDIT TIME (Days) 1 $1 ,500 . 00 9 days 2 $2,305 . 60 15 days 3 $9, 644 . 38 3 days 4 $1 ,317. 58 3 days 5 ($1 , 141 . 02) 0 days 6 $0 . 00 15 days Totals $13, 626. 54 45 days This Change Order includes not only all direct costs of Contractor such as labor, material, job overhead, and profit markup, but also includes any costs for modifications or changes in sequence of work to be performed, delays, rescheduling, disruptions, extended direct overhead or general overhead, acceleration, material or other escalation which includes wages, and other impact costs . ATTACHMENT C mh1600. doc