HomeMy WebLinkAbout2003-132 ORIGINAL Contract #SG323AA L • 3 ' d N . 49 COST SHARE AGREEMENT BETWEEN THE ST. JOHNS RIVER WATER MANAGEMENT DISTRICT / J AND INDIAN RIVER COUNTY PURSUANT TO DISTRICT ' S ALTERNATIVE WATER SUPPLY CONSTRUCTION COST SHARING PROGRAM Contract #SG323AA RECIPIENT . Indian River County 1840 25 `h Street Vero Beach , Florida 32960 RECIPIENT ADMINISTRATOR : Michael C . Hotchkiss , P . E . DISTRICT CONTRIBUTION: $ 125 ,000 RECIPIENT CONTRIBUTION : $4,224,070 AGREEMENT PERIOD : 18 Months from Execution Purpose of Agreement : This cost share agreement is authorized by the St . Johns River Water Management District ("DISTRICT") from funding designated for identification and use of alternative water supplies , including reclaimed water. 1 . Scope of Project: RECIPIENT shall commence work within fifteen ( 15 ) days after approval is received from District ' s Project Manager to begin, prosecute the work diligently, and complete the entire work in accordance with Exhibit "A" (attached) , "Statement of Work," and Exhibit ` B " (attached) "Alternative Water Supply Construction Cost Sharing Application ," and shall be completed within the time frames specified above unless extended in writing by DISTRICT . 2 , Permits : A fifteen ( 15 ) day period has been included in the time allotted for completion to allow for mailing of the AGREEMENT , RECIPIENT submission of proof of all required permits , and any other documentation required by District ' s Project Manager. Any work completed without proper permits shall not be considered in compliance with this AGREEMENT , and shall not constitute as work performed under this AGREEMENT . RECIPIENT acknowledges understanding that any work not properly permitted prior to implementation shall not be approved for invoicing to the DISTRICT , and that RECIPIENT may be fined per appropriate regulatory channels and/or may be required to remove said unauthorized construction . Page 1 of 6 Contract #SG323AA 3 . Legislative Requirements : The Florida Legislature requires recipients of funds granted through this program to meet several specific conditions . The RECIPIENT must provide DISTRICT with written assurance of its continued qualification under these requirements with submittal of invoice or forfeit funding . Details concerning these requirements appear in Subsections 373 . 1961 (2) (b) and (c) , F. S . 4 . Status Report RECIPIENT shall submit a brief final project report summarizing the project to DISTRICT ' s Project Manager, who is the Administrator, or his designee , describing the activities of the project . 5 . Records : RECIPIENT shall maintain its books and records in such a manner that the receipts and expenditures of the cost share funds shall be shown separately from other expenditures in an easily checked form. RECIPIENT shall keep the records of receipts and expenditures of cost share funds , copies of all reports submitted to DISTRICT and copies of all support documentation for at least three (3 ) years after expiration of the Agreement period. In accordance with generally accepted governmental auditing standards , DISTRICT shall have access to and the right to examine any directly pertinent books , documents , papers , and records involving transactions related to this Agreement. 6 . Liability and Insurance : Each party to the agreement is responsible for all personal injury and property damage attributable to the negligent acts or omissions of that party and the officers , employees and agents thereof The parties further agree that nothing contained herein shall be construed or interpreted as denying to any party any remedy or defense available to such parties under the laws of the State of Florida, nor as a waiver of sovereign immunity of the State of Florida beyond the waiver provided for in Section 768 . 28 , Fla. Stat. Each party shall acquire and maintain throughout the term of this agreement such liability and automobile insurance as required by their current rules and regulations . 7 . Payment of Funds : Approved funds shall be paid to RECIPIENT by DISTRICT in one ( 1 ) payment following completion of project. Payment shall be made following submission and approval of the invoice, including proper documentation , from RECIPIENT and verification of satisfactory completion of project by DISTRICT ' s Project Manager, Elizabeth Thomas . Invoice shall include receipts from contractors and/or suppliers for the specified construction expenditures , and verification of project complying with local and state building requirements , including verification of permits needed . Once all required documentation is received, and determined to be complete and correct, by DISTRICT Project Manager and the Division of Financial Management, the DISTRICT shall remit 50% of the project ' s cost , up to a maximum not-to -exceed amount of $ 125 ,000 to RECIPIENT within thirty (30) days . All invoices shall reference the Contract Number provided on the first page of this AGREEMENT and shall be submitted to the Director, Division of Financial Management, P . O . Box 1429 , Palatka, Florida 32178- 1429 . Payments due and unpaid under this AGREEMENT shall bear interest in accordance with Section 218 . 74 , Ha. Stat . The provisions in this Paragraph relating to payment of funds shall supercede any other contract provision or attachments contained in this contract. Page 2 of 6 Contract #SG323AA 8 . Repayment of Funds : Funds shall be subject to repayment by the RECIPIENT after expiration of the Agreement term if, upon a post-project audit examination, DISTRICT finds RECIPIENT has spent funds for purposes other than those specified in Exhibit "A . " 9 . Termination of Agreement : This Agreement may be fully or partially terminated upon ten ( 10) days written notice to RECIPIENT . 10 . Non-lobbying : Pursuant to Section 216 . 347 , Fla. Stat. (as amended) , RECIPIENT agrees that funds received from DISTRICT under this Agreement shall not be used for the purpose of lobbying the Legislature or any other state agency. 11 . Governing Law : This Agreement shall be construed according to the laws of the State of Florida. IN WITNESS WHEREOF, the ST . JOHNS RIVER WATER MANAGEMENT DISTRICT has caused this contract to be executed this Jr (i day of Ji-i ►, o , 2003 , in its name by its Executive Director and Indian River County has caused this contract to be executed in its name by its duly authorized representatives , and, if appropriate , has caused its seal to be attached , all on the day and year first above written . ST . JOHNS RIVER WATER INDIAN RIVER COUNTY MANAGEMENT DISTRICT By : • �'x By : Kirby B . Ureen III, Executive Director Ken R . Macht Chai yped Name d Title B C oved : � J 39 2 Attest .- > .' _ Atte �i` - I PATRICIA M . RIDGELY DEPUTY CI FRK Typed Name and Title APPROVED BY THE OFFICE OF GENERAL COUNSEL Indian River Co Ivkpprol kl Date 13udkc ! I/ q p0;5 J n W. Will ' s , eputy General Counsel St. Johns River Water Management District Risk M ,, ,;,; gt ,`"�"" Page 3 of 6 Contract #SG323AA EXHIBIT A STATEMENT OF WORK INDIAN RIVER COUNTY UTILITIES RO CONCENTRATE REUSE PROJECT Introduction/Background In response to the requirements of Subsection 373 . 1961 ( 2 ) , Florida Statutes (F. S. ) , the St. Johns River Water Management District (DISTRICT) maintains the Alternative Water Supply Construction Cost Sharing Program (AWSCCS ) to fund the construction of alternative water supply facilities . Alternative water supplies are defined by statute as "water that has been reclaimed after one or more public supply, municipal , industrial , commercial , or agricultural uses or are supplies of stormwater, or brackish or salt water, that have been treated in accordance with applicable rules and standards sufficient to supply the intended use . " In accordance with Subsection 373 . 1961 (2) , F. S. , cost sharing funds are available to all water suppliers and users , including local governments ; water, wastewater and reuse utilities ; industrial and agricultural water users ; and other public and private water users . The statute also requires the water management districts to appoint an Advisory Committee to make recommendations to the Governing Board about which applications to grant . Representation by city, county, and privately owned water supply utilities is required on this committee , and representation of agricultural and environmental interests is expressly allowed . An Advisory Committee , appointed by the DISTRICT ' s Governing Board , annually ranks applications for funds administered through the Alternative Water Supply Construction Cost Sharing Program. The Advisory Committee ' s recommendations for funding for Fiscal Year 2002-2003 were presented to the Governing Board on April 8 , 2003 . The Governing Board approved for Indian River County Utilities (RECIPIENT) to receive funds in a maximum not-to- exceed amount of $ 125 ,000 or up to 50 % of the project ' s costs , whichever is less , for the Indian River County Utilities RO Concentrate Reuse Project . Objectives The objective of the Alternative Water Supply Construction Cost Sharing Program is to encourage and facilitate the development of alternatives water supplies . The objective of this project is to dilute RO concentrate from a water treatment facility with stormwater to make it useable for golf course irrigation and thereby reducing the use of fresher water supplies . Page 4 of 6 Contract #SG323AA Scope of Work This project will provide rerouting of concentrate from the County ' s North Regional RO Water Treatment Facility to the Bent Pine Rapid Infiltration Basin (RIB ) site where it will be mixed with stormwater and then reused for golf course irrigation . The facilities for the project includes a control structure west of the Lateral G Canal , a pumping station , a 32- acre wetlands system, and a pump system for routing the effluent through the reclaimed water system or discharging excess into the Lateral G Canal . TASK IDENTIFICATION Cost share recipient shall construct or have constructed the facility described in the attached Exhibit B . TIMEFRAMES AND DELIVERABLES Project deliverable shall be the completion of construction of the facility described in the attached Exhibit B . The facility for the project includes a control structure west of the Lateral G Canal , a pumping station , a 32-acre wetlands system, and a pump system for routing the effluent through the reclaimed water system or discharging excess into the Lateral G Canal . Completion date shall be eighteen months from execution of the contract . BUDGET/COST SCHEDULE DISTRICT shall reimburse cost share recipient for 50 % of the project ' s cost, up to a maximum not-to -exceed amount of $ 125 ,000 . Payment shall be due upon satisfactory completion of project , as certified by DISTRICT , and the submission of an invoice and proof of payment made by Indian River County Utilities of project costs by cost share recipient . Page 5 of 6 Contract #SG323AA EXHIBIT B ALTERNATIVE WATER SUPPLY CONSTRUCTION COST SHARING APPLICATION INDIAN RIVER COUNTY Page 6 of 6 AA APPNUM 03 SJRWMD office use ST. JOHNS RIVER WATER MANAGEMENT DISTRICT ALTERNATIVE WATER SUPPLY CONSTRUCTION COST-SHARING PROGRAM APPLICATION FORM Fiscal Year 2002=2003 Submission deadline : Applications must be received by SJRWMD or dated by the U. S . Postal Service or a commercial carrier no later than Friday, December 6, 2002 . Submit three copies of this form and all supporting materials to Elizabeth Thomas c/o Cheryl Worgum, St. Johns River Water Management District, P . O. Box 1429, Palatka, FL, 321784429 if sent by U. S . mail or to 4049 Reid Street, Palatka, FL, 3217844292 if sent by courier. For application assistance contact Elizabeth Thomas at (407) 6594868, (877) 2284658 or ethomas@sjrwmd. com. You may add up to one additional page of supporting material for any answer that needs further explanation . Applications that are substantially incomplete or that are not completed according to instructions will be disqualified. Excess materials will not be considered. Read and follow instructions . Selected evaluation criteria are accompany questions pertaining to them in the application. Complete evaluation criteria are provided in the separate instructions document. Maximum contract time limit: Parties receiving funds through this program must complete their projects within 18 months of the execution of a cost-share contract with SJRWMD . Type or print clearly the requested information in the spaces provided. A. Applicant Information 1 . Name of Applicant : Indian River County, Utilities Department (May be utility, local government, agency, company, individual, or other.) 2. Name, address, and phone numbers of project manager or contact person. SJRWMD will sent correspondence concerning this application ONLY to this person. Name Michael C . Hotchkiss P.E. Mailing address 1840 25 h Street City and zip code Vero Beach, FL 32960 Phone (772) 567-8000_ ext. 1821 FAX (772) 770-5143 (include are code) (include area code) 3. Name, address, and phone numbers of person with authority to enter into a contractual agreement, if other than project manager or contact person. Name Kenneth R . Macht Chairman, Indian River County Board of County Commissioners Mailing address 1840 25"' Street City and zip code . Vero Beach, FL 32960 Phone (772) 567-8000 . ext. 1830 FAX (772) 770-5143 (include area code) (include area code) SJRWMD Alternative Water Supply Construction Cost-Sharing Application Form FY 2002-2003 4. SJRWMD Permit Information. Does the applicant have any SJRWMD permits ? Yes W No If yes, list all SJRWMD consumptive use permits held by the applicant AND any surface water management or environmental resource permits pertaining to the project. Attach an additional page behind this page if needed. Permit Number Expiration Date Permit Number Expiration Date 10524 12-31 -2020 5. Other Permit Information. List all types of permits required to construct the proposed project and provide the status of efforts to obtain each permit. Type of Permit Issuing Agency Have Permit Applied Not Applied Utility Construction F . D. E.P . ✓ Right. of Way Indian River County ✓ Utility Construction Indian River Count ✓ 6. Disclosure. Does any SJRWMD employee, Goveming Board member, contractor or any other affiliate of the applicant have a financial interest in this project, the property associated with this project or with any party that may profit financially form this project? Yes No ✓ If yes, identify all such parties and describe their interests . Page A - 2 F:\uti"ftxV B.nY - ENGWFER NaTfoja4 - utility Contr�oe Pan, " URC - 20031MVIM AttKin ivo Wines Soppl3 Grant App\1t Johns Alturoad o Wow Soypl7 Applia4oa-13riw to NoM Rdin(CmlAx SJRWMD Alternative Water Supply Construction Cost-Sharing Application Form FY 2002-2003 B. Project Information 1 . Cost-sharing request (SJRWMD ' s share cannot exceed 50% of total project cost. ) a. Total project cost . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ $4. 349. 070 b . Amount of cost-share requested . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 . Purpose of the project. (Do not refer to attachments . ) Increase amount of reclaimed water by supplementing with R.0. concentrate 3. Brief description of project. Include approximate dimensions and capacities . (Do not refer to attachments . ) Reverse Osmosis (R . O . ) water treatment process involves micron level filtration that generates a waste stream by-product referred to as concentrate Currently concentrate is discharged to the Indian River Lagoon where it is commingled with the waters of the intra coastal waterway and disposed This project will provide for the concentrate (initially 750 000 gallons per day and ultimately 1 5 mgd) to be rerouted to the Bent Pine Rapid Infiltration Basin (RIB) site At that point the concentrate will be discharged into the RIB basin and mixed with stormwater withdrawn from the Indian River Farms North Relief Canal . The stormwater/concentrate mixture will be routed through the RIB basin to allow sedimentation of solids and nutrient removal from wetland plants A portion of the mixture will be withdrawn from the RIB site and supplied to golf courses for irrigation The remainder will be discharged into the Lateral G Canal Approximately four miles of 16" PVC water main will be constructed from the North County R O Plant south along 58`h Avenue to the 570' Street right-of-wav and along the 57`h Street right-of way to the RIB basin. A control structure will be constructed west of the Lateral G Canal . A pumping station will be constructed upstream of the control structure for routing stormwater/concentrate through the reclaimed water system and the manmade wetlands system A 32 acre wetlands system will be developed downstream of the pump system within the RIB site Another pump system will be developed downstream of the wetlands for routing treated effluent through the reclaimed water system or discharging excess into the Lateral G Canal EVALUATION FACTOR related to questions 11-2 and 11-3. Will the project implement new or innovative procedures or technology which can serve as a demonstration, pilot project, or source of useful data for water resource management? 140 points . Based on rater 's assessment of the degree of innovation being proposed or the utility of data generated by the project, with greater innovation or use of data getting more points. 4. Project location (address or description) . The County' s North Regional R O Water Treatment Facility is located at the norhwest corner of 58Th Ave . and 77Th St. The onsite concentrate/stormwater recovery and manmade wetlands facility shall be located at the northwest Corner of the North Relief Canal and the Lateral G Canal (present location of the County' s Wastewater RIB site) County (ies) in which project is located : Indian River Page A - 3 FAXJti1tin\U7XrrY - ENGINFERING\Prga4 - Utility Construction Pwmib\StC - 2003 SIR WDm Altsom" Wuhu Supply Gnn Appt3t John ARurumd" Wuta Supply Applioutiou­Brin to North Rdiuf CawL&c SJRWMD Alternative Water Supply Construction Cost-Sharing Application Form FY 2002-2003 EVALUATION FACTOR related to question B4. Is the project in an area identified by the SJRWMD Water Supply Assessment as a priority water resource caution area or a delineated area? This will be determined for you by SJRWMD staff. 0-5 points . Yes, Inside caution area = 5; Yes, Inside delineated area = 3; No, Outside caution area and/or delineated area = 0. 5. Projected schedule Projected starting date : mo. Ju___^lx_ yr. 2003 . Completion date : mo. October yr. 2004 . (Funds received through this program may be used only for projects constructed after a cost-sharing contract has been executed and may not be used to reimburse the cost of existing structures or structures already under construction. Cost-sharing contracts will probably be executed in April or May 2003) , 6. Will water from this project directly take the place of an existing or proposed withdrawal from a higher quality water source? , . . . . 1 1 . 0 1 . . . . 0 . . . . , 0 . * . 6 . * . . . . . . . . . . . . . . . . . . . * ' . . 0 ' . . . . . . . . . . . . . Yes ✓ No If yes , identify the source and quantity of higher quality water to be replaced. ✓ Floridan aquifer . . . . . . . . . . . 525 . 6 million gallons per year ✓ Surficial aquifer , , , . . , . , , . . . , 525 . 6 million gallons per year Surface water . . . . . . . . . . . . . . million gallons Per year If surface water, state name of water body EVALUATION FACTOR related to question B4. Will water from this project directly and effectively take the place of an existing or proposed higher quality water source? 0-20 points . Based on rater 's assessment of the effectiveness of the project at saving potable water and apparent relative cost effectiveness. Because of the great variation in types of projects, calculations of cost effectiveness for widely dissimilar projects, such as urban reuse and agricultural freeze protection ponds will not be directly compared. Does the project contribute to the recovery of violated minimum flows or levels? This will be determined for you by SJRWMD staff. 040 points . Yes = 10; No = 0. 7. Does the project provide other water resource benefits in addition to water supply, such as improving or protecting ground or surface water quality, increasing recharge or conserving water? Yes ✓ No If yes, then describe benefits? You may add one page attachment behind this page if necessary . Mixing R. O . concentrate water with stormwater and reusing as reclaimed water will reduce concentrate and stormwater being released to the Indian River Lagoon EVALUATION FACTOR related to question 114. Does the project provide other water resource benefits in addition to water supply, such as improving or protecting ground or surface water quality, increasing recharge or conserving water? 0= 10 points . Based on rater 's assessment of the extent and significance of additional benefits. Page A - 4 FAU46tin\ TMrrY . ENGIDrmUNGtprojaa4 • Mlity Comtructiou PartnitsMC . 2003 SJRWN0 Ahwuntiw Won Supply Gum App\St Johns Algrootiw Water Supply ApplicmoaBtiva to North Raliuf Casal.doc SJRWMD Alternative Water Supply Construction Cost-Sharing Application Form FY 2002-2003 8. Is the project being undertaken in response to enforcement actions taken against the applicant because of failure to comply with permit conditions or other regulations ? . . . . . . . . . . .Yes ✓ No If yes , name the agency and regulatory program. F . D . E. P. - N. P.D . E. S . EVALUATION FACTOR related to question B-8. Is the project necessary to comply with an enforcement action by a local, state or federal agency? Enforcement action = 0; Otherwise = 10 9. Is the current application for subsequent funding to a phased multi-year project previously funded under thisprogram? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes ✓ No If yes, was the previous phase indicated to be a part of a multi-year project at the time of application? . , , , . , , , , . , , " , . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Yes ✓ No Is the proposed project part of a master water or wastewater plan? . . . . . . . . . . . . . . . . . . .Yes ✓ No If yes, attach a copy of relevant page(s) of the plan behind this page. 10. Is this project a cooperative effort with one or more other organizations or agencies, other than the applicant and SJRWMD ? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes ✓ No If yes, list other participants and what each one contributes to the project. You may add a one page attachment behind this page if necessary. Indian River County is working in conjunction with the City of Vero Beach and Indian River Farms Water Control district to achieve the same means . EVALUATION FACTOR related to question 11-9. Is the project a cooperative effort with one or more other organizations, agencies, or governmental entities ? 1 - 10 points . Based on rater 's assessment of the level and significance of support provided by other parties, with greater support getting more points. MEN OTHER EVALUATION FACTORS 1 . Rater' s evaluation. 0- 10 points . Rater 's overall assessment and other relevant factors not specifically addressed elsewhere. 2. Has the applicant followed directions as instructed in preparing the application? -5 to 0 points . Points will be taken away from an applicant' s score for failure to follow directions . Noncompliance, and/or the applicant included a large amount of unnecessary information = -1 to -S; the applicant followed directions and included just the relevant information required = 0. Page A - 5 FAlJti%a%rrLrIY - ENGINEMUNGWojuw - UtilitYCortmcd" Prmib\ RC . 2003 SJRWUD Alternative Wrirr Supply Gnot App\St Job's Ahruutin W atrr Supply Appliatio►Brfow to North Rdirf Caod.doc Introduction/Overview Indian River County operates two water treatment facilities. Both facilities obtain raw water from the Floridan Aquifer. This raw water requires treatment in order to meet Federal Safe Drinking Water Act regulations. Indian River County utilizes state-o& the-art membrane technology to remove undesirable constituents, mineral impurities, and/ or organic compounds . Both the South and' North County facilities incorporate nanofiltration membranes to remove undesirable particles in the raw water such as bacteria, algea, clays, silts, cysts, Giardia, Cryptosporidium, viruses, hardness, sodium, and chlorides. Nanofiltration is a low-pressure process that also softens the water and removes disinfectant by-products . Approximately eighty percent (80 °0 ) of the groundwater obtained from the raw water well systems is recovered in the membrane process and used in the potable drinking water system . The remainder, approximately twenty percent (20 % ) of the raw water obtained from the well systems, is regulated by the Florida Department of Environmental Protection (FDEP) and termed concentrate. The concentrate flow is treated at each facility by disinfection (chlorine injection) , air injection and static mixing. Hydrogen sulfide and chlorine are removed prior to discharge to disposal . Concentrate from the South County plant is discharged to the South Relief Canal, a Class III water body, which flows into the Indian River, a Class III marine water body. The North County plant discharges directly to the Indian River, a Class III marine water body, at the County Road 510 bridge. For comparison purposes, total dissolved solids in well water and concentrate are typically 700 and 3,500 mg/ l, respectively . Salinity of the Indian River Lagoon and Atlantic Ocean are typically 20,000 and 35,000 mg/ 1, respectively. Discharges from both facilities are monitored and analyzed routinely according to FDEP permit requirements . Indian River County is currently in the process of renewing the concentrate disposal permits at both facilities . The Environmental Protection Agency has been reviewing discharges such as these and is currently formulating legislation regarding this issue . FDEP and water management districts are currently struggling with the issue throughout the state. Indian River County, in keeping with their mission statement : " to utilize all water resources in a sustainable and cost- effective manner" , authorized Camp Dresser & McKee Inc. (CDM) on December 7, 10. 99 to review current sampling efforts and investigate alternative disposal options . The County hopes that this report may result in conservation of our valuable resources . CDM' s work authorization and report are broken down as follows : Section 1 : Existing Treatment System/ Issues Section 2 : Existing Water Quality Data/ Techniques Section 3 : Alternative Disposal Options Section 4: Concentrate Team Meetings Section 5 : Recommendations CDM Camp Drewer & McKee Inc. �wxe.sxnv+oroo Inman river county Utilities Concentrate Disposal Options UAB Response. The UAB decided against pursuit of this option in lieu of other potential options at the May 4, 2000 meeting. 3 .4 Stormwater Mixing Concentrate may be diluted with stormwater for disposal . Mixing the concentrate with stormwater would require that the stormwater system be available for connection. Possible problems include retention volume, mixing ratio and reliability of stormwater volumes . Since concentrate production is constant, a consistent supply of stormwater would be required for diluting purposes . This option may be advantageous during wet weather. UAB Response: The UAB recommended this option be pursued as an option once the Stormwater Plaster planning efforts are underway . Further discussions with Indian River Farms Water Control District are necessary . 3 . 5 Reuse Mixing Mixing reuse water with concentrate and disposing the product through the reuse water distribution system is another possible solution. The concentrate water would have to be blended with reuse water at a ratio that would allow the water to be land applied for irrigation purposes . Possible problems would include possible vegetation intolerance to saltier water and the availability of reuse volume for dilution purposes . Also the possible gradual buildup of salts in the areas of discharge may become a problem . See Figure 1 . UAB Response : The UAB believes this option in conjunction with other possible options will be the most immediate and viable means of diverting concentrate from the North County plant and current discharge point. A pilot study at a nearby golf course pond is recommended prior to full scale implementation. 3 . 6 Disposal to North WWTP The North County WWTP is a one million gallon per day wastewater treatment plant. See Figure 2. The concentrate could be diverted to the plant, mixed with the influent, and treated and disposed as the North plant' s effluent. The plant would only be able to take a portion of the 600,000 gallons per day of concentrate produced at North County facility . The rest of the concentrate would have to be disposed in another manner . UAB Response : _ The UAB recommended not to pursue this option at the May 4 meeting since salts pass through the treatment process . CDM Camp Dresser & McKee Inc. 7 rw�oe.aedt tnaoo SJRWMD Alternative Water Supply Construction Cost-Sharing Application Form FY 2002_2003 C. Supporting Materials. Attach the following items, as required, to this application . Check box where information is included . (Additional information may be requested if needed .) 1 . Project budget summary. Provide a one-page project budget summary listing project expenses by major categories . 2. General specifications and plans. Submit a generalized sketch with enough a detail that the evaluating committee will understand what is to be constructed, and a one-page written summary of sizes and capacities of the project and major components . Fit all drawings on 8 '/2" by 11 " paper. Detailed engineering plans may be requested later if needed for further project evaluation . Do not send color graphics unless they will reproduce satisfactorily in black and white. 3. Location map. Clearly indicate the location and extent of the project and whether it a crosses water management district jurisdictions . Use an 8 %2" by 11 " format. Show highway intersections or other recognizable landmarks for orientation. The map may be a photocopy of part of a county road map or USGS topographic map . Do not send color graphics unless they will reproduce satisfactorily in black and white. N/A 4. Documents supporting interdistrict impacts. If the proposed project crosses water management district boundaries or serves more than one water management district, provide a one-nage summary of the effects that the project will have on water resources and water users within each district. Include the following information, at a minimum. ■ State the amount(s) of water that will be transported across the district boundary ■ Identify the locality from which the water will be taken ■ Identify the utility and/or users who will receive the water 5. Documents required of utilities only. The Florida Legislature requires utilities receiving ❑✓ funds through this program to meet several specific conditions concerning rates, concerning consistency with comprehensive plans, and requiring mandatory hookups to public reuse distribution systems . In order for SJRWMD to assess whether individual utilities meet the legislative requirements, utility applicants must attach the following items to their applications . ■ Rate schedules. A copy of the rate schedule for each water, wastewater, and reclaimed water utility service operated by the applicant in the service area where the proposed project is located. ■ Certification of compatibility with local comprehensive plan. A letter from the local city or county land use planning authority, certifying that the project is consistent with the local comprehensive plan (do not include plan excerpts .) ■ Reuse Ordinance. (government-operated utilities only) - A copy of an ordinance that requires water users to take reclaimed water where available and appropriate for their use. I certify that all information on this form and attached documents is true and correct. Name Zo-,*14 4A A AlAIA/v P L'/ (sign ur of person with authority to enter into a contractual agreement) Title Chairman, Indian River County Board of County Commissioners Date 12 - 03 - 2002 Page A - 6 p:XUfiVtia\UMffY - ENGV4ERR4Gtprojab - Utility CowtmctiooPmuUMC - 2003SIRV#WD Alternmr, WOW Supply (Snot App\St John A woodo WYn SupplyAppliotiotrBrir to North Roli,(l�Ltioo Brine to North Relief Canal Project Budget Summary 16" Brine Line-21 , 120 L .F . $ 11500 ,000 . 00 Control Structure W/O Lateral G Canal $ 300 , 000 . 00 Pumping Station at 8 MG Lake Headworks $ 500 ,000 .00 Pumping Station at 8 MG Lake Tailworks $ 500 ,000 .00 Pumping Station at 10 MG Basin Tailworks $ 500 ,000 .00 CONSTRUCTION SUBTOTAL $ 313000000 .00 15% Contingency $ 495 ,000 .00 CONSTRUCTION TOTAL $ 31795 ,000 . 00 Engineering , Permitting and Inspection (14 .6% Construction Total) $ 554 , 070 .00 PROJECT GRAND TOTAL $ 493499070 .00 NORTH COUNTY R /0 PLANT I I I 77TH ST ROPOSED 16 " PVC RO CONCENTRATE MAIN J Q Q U Q 0 w OD lV w LO Q J EXISTING 1 . 5 MI REUSE MAIN - - - - - - - - - - - - - - - - -- 57TH ST IL 11 or 11 y n. � f a AC P + RIB 5 MG SITE 5 M i a NORTH RELIEF CANAL PROPOSED XISTING CONTROL STRUCTURE CONTROL STRUCTURE NORTH COUNTY R / 0 DRAWING INDIAN RIVER COUNTY N0. DEPARTMENT OF _ UTILITIES SERVICES BRINE PROJECT E North County Brine Project Description The main purpose of the North County Brine Project will be to redirect the R. O . demineralization concentrate from directly discharging to the Indian River Lagoon and utilize as a resource to mix with stormwater at a sedimentation basin . The mixture of stormwater/concentrate will be sold to golf courses in the form of reclaimed water to help supplement irrigation. The portion of stormwater/concentrate not utilized for irrigation will be routed through the sedimentation basin and discharged into the Lateral "G" Canal where it will eventually flow into the North Relief Canal and ultimately, into the Indian River Lagoon A tilt-gate control structure will be installed west of the Lateral "G" canal. This will provide adequate water volume in the North Relief Canal needed to dilute the concentrate to tolerable levels for vegetation irrigation. The brine will be redirected by constructing four miles of 16" PVC pipe from the North County R. O . Facility to the Bent Pines Sedimentation Basin . The 16" concentrate main construction will initiate at the North County R. O . Facility and proceed south along Kings Highway two and one- half miles to 57 h Street then turn east for one and one-half miles to the sedimentation basin. The concentrate piping will be plumbed at the basin site such that brine can be either mixed with stormwater from the North Relief Canal, or discharged into the Lateral "G" Canal during periods of low stormwater availability or low reuse demand. Stormwater will be conveyed from the North Relief Canal to the 8 million gallon lake through a 24" diameter pipe. Energy will be provided through three (3 ) 300 h.p . vertical turbine pumps installed in the North Relief Canal . Stormwater will be further conveyed from the 8 million gallon lake to the concentrate mixing "T" through another 24" diameter pipe. Energy will be provided through three (3) additional 300 h.p . vertical turbine pumps . The concentrate/stormwater mixture will be routed through the 10 million gallon sedimentation basin where it will undergo additional mixing and natural attenuation. The mixture will be extracted at the end of the sedimentation basin and pumped into the reuse system with (3) three 300 h .p . variable frequency drive pumps . The estimated construction costs are as follows : 16" Brine Line-21 , 120 L. F . $ 11 500, 000 . 00 Control Structure W/O Lateral G Canal $ 3009000 . 00 Pumping Station at 8 MG Lake Headworks $ 500, 000 . 00 Pumping Station at 8 MG Lake Tailworks $ 5000000 . 00 Pumping Station at 10 MG Basin Tailworks $ 500 , 000 . 00 CONSTRUCTION SUBTOTAL $ 31300 , 000 . 00 15% Contingency $ 495 , 000 . 00 CONSTRUCTION TOTAL $ 397959000 . 00 Engineering , Permitting and Inspection (14 .6% Construction Subtotal) $ 554 ,070 . 00 PROJECT GRAND TOTAL $ 413499070.00 STORMWATER BRINE REUSE PRODUCT Cl -CONCENTRATION (PPM) j DAILY FLOW (MGD) Cl CONCENTRATION (PPM ) DAILY FLOW MGD Cl CONCENTRATION (PPM) DAILY FLOW GAUDAY) STORMWATER TO BRINE RATIO 400.00 12,000,000.00 1 ,300.00 1 ,500,000.00 500.00 13 ,500,000.00 g 300.00 2040001000.00 1 ,300.00 1 ,500,000.00 369. 77 21 ,5001000.00 13.33333333 200.00 2890001000.00 11300.00 1 ,500,000.00 255.93 29,5001000.00 18.66666667 100.00 3660000000.00 1 ,300.00 1 ,500,000.00 146.00 37,5001000.00 24 Reuse Chloride Concentration Vs . Storm Water Flow 550.00 500,00 . 450.00 - 400.00 - 350,00 50.00 400.00350.00 c 300.00 i v 250.00 — 7Seriesl 200,00 - 150,00 - 0 00.00150.00t 100.00 v 50.00 0.00 0.00 5,000,000.00 101000,000.0 15,000,000. 0 206000,000.0 25,000,000.0 30,000,000.0 35,000,000.0 40,0000000.0 0 0 0 0 0 0 0 Stormwater Flow (GPD) i STORMWATER BRINE REUSE PRODUCT Cl CONCENTRATION (PPM) DAILY FLOW (MGD) CI CONCENTRATION (PPM) DAILY FLOW (MGD) Cl CONCENTRATION (PPM) DAILY FLOW (GAL/DAY) STORMWATER TO BRINE RAT10 400,00 12,000,000.00 10300.00 750,000.00 452.94 129750,000.00 16 300.00 20,000,000.00 1 ,300.00 750,000,00 336, 14 20,7500000.00 26.66666667 200.00 281000,000,00 1 ,300.00 750,000.00 22_8. 70 28, 750,000.00 37 .333_33333 100.00 36,0009000.00 1 ,300.00 750,000.00 124.49 369750,000.00 48 Reuse Chloride Concentration Vs . Storm Water Flow 500.00 _ . _ . __. . __ ....... c 450.00 400.00 350.00 300.00 c `oi 250,00 tSeriesl v E 200.00 - :2 150.00 c 100.00 v 50.00 - 0,00 0.00 5,000,000.00 10,0006000.0 15,000,000.0 20,0000000.0 25,000,000,0 301000,000,0 35,000,000.0 401000,000. 0 0 0 0 0 0 0 0 Stormwater Flow (GPD) 4 � pp lMpOYQ ,� •1_m �, .. 4� ! LS " M NARIVEFl MCAND �° -SIMMER '• hf"„"'>�w y f � � rtv I f i a , .\30 iij eate� ULA OLA < R 1 •o < h . STw pR t: : \ E � yv , a URCHID; AJIEZ •� '� O. II ' _ EEu :�. _ 7., ' ISIANO- ,: l �q` A c 51 II 15 y7 � L , l� tn ' Y_w a HARRIS ROI J " + - 1 . ST R < o • E, t at a •. , r n ST . u Q � ; •,� SAL 32 - - - FACI (.1'mARA E OV 1 GL.II RISER \ IT Ru o \ '\ + 11EhA A ORA LYDIA,Y RIC[R SNORESCfl'T LfY ' pMT • [—, Q I YORE RDs A •E•N1M•Y LA ORJ� DO Ivis H FART p EALL4 11 Kim HouRT Q Ra • R ST • e;::. V PINE p ! — - - T11 O < n < ISLANOT 3' INDIAN RIVER HIGHLANDS IS • ,1 I L y1 r O < '' = tad • + _ _ ..+t . ` O1. T : •• "' F � T` . ' 13 sr 0 I = n + E S E7 COPELANDS •r ., " LANDINGHOLE = CEMETERY AD 11 ST T. tN ' I• WINTER THE _ •a WAIL BEACH,-,6AtI '" ISLAND 615 O T.NAVE ` I l• ^' , SI' ST 67 STI ^ N Sr D . , '✓yRik 7 E T632 low 10 $$ �z imp 'o -II OA . . 'I 63 PL KINGSLAKE ; : CQ SS ST 0 u ,A 11 It I nCAN A v r r1E 17 KING ' S MUSK, LAND DROVE s, AO ) ST 1 - ' - $1 • - R . 1 . g ; 18 77 a S ATL 15 CA 1AL I pip•} I ' I J s s1 Sr - I fi .P.e sse ra. i - - - C4 .L;I L ._.__ � sr V, C 5 G . , t )NODSTRIAL IIvp Ulkd MISE OOTOO I , Sf.f rR0 21 •MAoRiij T OFR , ST_ FINOOY I fvrtrOU ,wr ^,! ' AO N UNOSEY RO _ "v If, q ST 19 _ 20 3 L�?�� a n N aRz < u .ssf LIN41 46 a Ill •v E+ C ES • ' „ L, , 1 .1 o .' � I a n �: •r o o n `'�• < < J , _ < f ..y - N V i I , V < f Il IN I N •s - ST r � < as Sr ' i ISS, !Y K ' .^.. EE — > ST r x fT r 05 . ._. ..— . . f;,o.OND_ . 611 s = _ as _GIFFOR .: 1.¢s � _ rx �^ N o` it `>1 > • IYN : aK ' ! - dM• J Cz . gFS . a• • .. 1.'�3�i . '' .. .. I 4199reso. WratesA RESOLUTION NO . 99 - 58 A RESOLUTION OF INDIAN RIVER COUNTY, FLORIDA , ADOPTING RATES , FEES , AND CHARGES FOR THE DEPARTMENT OF UTILITY SERVICES , PURSUANT TO THE AUTHORITY OF ORDINANCE NO , 91 -9 . WHEREAS , Indian River County operates a Department of Utility Services , which is funded without contribution from the ad valorem tax fund of the County and is required to support itself from rates , fees , and charges paid by the customers of the utility system ; and WHEREAS , Ordinance No . 91 -9 authorizes the imposition by the Department of Utility Services of certain rates , fees , and charges to support the operation of the Department in a fair and equitable manner; and WHEREAS , Ordinance No . 92- 35 requires an annual review of user charges and notice of rates ; and WHEREAS , it is necessary to amend the existing rate resolution to keep the Department of Utility Services on a sound financial footing ; NOW , THEREFORE , BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF INDIAN RIVER COUNTY , FLORIDA , that: 1 . The Schedule of Rates , Fees , and Charges described on Exhibit "A" is hereby adopted for use by the Department of Utility Services effective October 1 , 1999 , 2 . Rates , fees , and charges will be reviewed on an annual basis beginning one year from the effective date of this resolution . The resolution was moved for adoption by Commissioner G i n n , and the motion was seconded by Commissioner T i P p i n , and , upon being put to a vote , the vote was as follows : Chairman Kenneth R . Macht Aye Vice Chairman Fran B . Adams Aye Commissioner John W. Tippin Aye Commissioner Ruth M . Stanbridge Aye Commissioner Caroline D . Ginn Aye The Chairman thereupon declared the resolution duly passed and adopted this 22ndday of June , 1999 . BOARD OF UNTY C MISSIONERS INDI IVER COONFLORIDA Atte_ J . K . Barton , Cler ;f7� • .� Kenneth R. Macht Deuty S(11MAt Y Chairman PATRI IK mlftl -- - -. - -- - snow a:. e ;.s ' Apffro . ed Ds : e Attachment: Exhibit "A" '' 6661 ` I xagol ;) p antlDa3j :l sat .zvqD xaltjp pug saaA 6salug JaMas pug lajuAikjo alnpaq3S sa3in .laS f41iilR jo juauzpudaQ �11I )(I lu n o . Vani )l UVIPUJ INDIAN RIVER COUNTY. FLORIDA Water Billing Charge - Per Account 51 .29 Base Facility Charge: Where Lines Are Available- SinglewFamily (per ERU) 57.76 Manufactured Home 0. 85 (per ERU) S6. 60 Multi-Family 0. 85 (per ERU) 56. 60 Commercial (per ERU) 57.76 Base Facility Charge: Capacity is Reserved But Where Lines Are Not Available- Single-Family (per ERU) S3 88 Manufactured Home 0. 85 (per ERU) S3.30 Multi-Family 0. 85 (per ERU) 53.30 Commercial (per ERU) S3 88 0 to 3, 000 Gallons Per Month Per Connection Per 1,000 Gallons S2.20 3 , 001 to 7, 000 Gallons per Month Per Connection - Per 1 ,000 Gallons S2. 42 Over 7,000 Gallons Per Month Per Connection Per 1 ,000 Gallons SIM Greater than 13, 060 Gallons Per Month Per ERU - Per 1 , 000 Gallons 57. 70 Sewer Billing Charge - Per Account SL294 Base Facility Charge Where Lines Are Available - Single- Family (per ERU) S14. 58 Manufactured Home 0. 85 (per ERU) S12. 40 Multi-Family 0. 85 (per ERU) 512. 40 Commercial (per ERU) 514. 58 Base Facilities Charge Where Capacity is Reserved But Lines Are Not Available - Single-Family (per ERU) 57. 29 Manufactured Home 0. 85 (per ERU) 56. 20 Multi-Family 0. 85 (per ERU) 56. 20 Commercial (per ERU) 57. 29 Volume Charge Per 1 , 000 Gallons 42, 000 Gallons Per Month Maximum for Single-Family & Manufactured Homes, individual meters S2. 86 Multi-Family Master-metered & Commercial i 0 to 13, 000 Gallons - billed water flow ' S2. 86 Above 13, 000 Gallons — billed water flow 54 .29 1 SCHEDULE OF WATER AND SEWER RATES, FEES AND CHARGES Bulk Water Billing Charge - Per Account Per Month 51.29 Base Facility Charge Where Lines are Available - Per ERU 56. 19 Base Facility Charge Where Capacity is Reserved, But Lines are not Available - Per ERU 53. 10 Volume Charge - per 1 ,000 gallons Water Meter Basis S2, 63 Excess Volume Surcharge - Greater than 7600 gallons per month- Per ERU • * Surcharge for bulk users will apply to flow exceeding total capacity reserved by bulk user in all meters. 54, 45 Bulk Sewer Billing Charge - Per Account Per Month $ 1 .29 Base Facility Charge Where Lines are Available - Per ERU S13, 41 Base Facility Charge Where Capacity is Reserved, But Lines are not Available - Per ERU 56. 71 Volume Charge - per 1 , 000 gallons Water Meter Basis 52. 63 - . - Volume Charge - per 1 , 000 gallons Sewer Meter Basis 52. 98 Excess Volume Surcharge - Greater than 7600 gallons per month- Per ERU • * Surcharge for bulk users will apply to flow exceeding total capacity reserved by bulk user in all meters. 54. 45 Excess Sewage Strength Charge Sewage Charge X Ratio of Total Dissolved Solids or Biochemical Oxygen Demand in Milligrams per liter/250. Excess Sewage Strength Charge Applicable to Customers Required to Use Greasctraps but who have obtained a Variance due to hardship or financial unfeasibility Sewage Charge • Reclaimed water - tier 1 , 000 ¢ allons $ 0, 15 Sludee and Sentaae Rates (b) Charge per 1 ,000 gallons (a) S30. 82 Charge per wet ton(a) S 7. 51 Notes : dr (a) Recommended rates assume domestic sludge with solids concentrations of between . 5 and 2. 0 percent. (b) Costs incurred by County to sample, monitor and/or test wastes to verify solids concentrations, metals, content, etc or additional costs incurred to handle or dispose of wastes with high metal concentrations or other nondomestic waste characteristics should be recovered from the users discharging the wastes in addition to the above charges based on formula ' s available in the Department of Utility Services. CAPACITY CHARGE • Water - Per ERU ' Water Treatment S 320.00 Water Transmission9S 80. 00 Total S1 j300eOO Sewer - Per ERU Wastewater Treatment S29087. 00 Wastewater Transmission S 709. 00 Total 52,796. 00 Line Extension Charees Maio Extension - Water Per foot measured along front of property served. 511 . 25 Main Extension Sewer and Sewer Laterals Per foot measured along front of property served. 515. 77 (Note : Charge doubles if service available on one side only, minimum of 50 feet per ERU, maximum of 100 feet per ERU) OTHER CHARGES Deposits - Required Upon Ormnine, Transferrine or Reconnectine Service Residential and Commercial - Per ERU S50400 Hydrant Meter 5345. 00 Interest Rate paid on Deposits .00208 % per month 2. 5 % per year Charge for Returned Check S20, 00 Issuance of Duplicate Bill S 1 . 50 Sewer Tap Cost plus overhead Meter Replacement 5/8 Inch S100400 1 Inch S125. 00 1412 Inch S300. 00 2 Inch or larger Cost plus overhead Meter Removal 5/8 Inch $ 30, 00 I Inch S 30. 00 11 /2 Inch and larger S 40. 00 Water Service Connection 5/8 Inch Meter S400. 00 1 Inch Meter 5460000 14/2 Inch Meter $810. 00 Larger than 1412 Inch Meter Cost plus overhead 3 SCHEDULE OF WATER AND SEWER RATES , FEES AND CHARGES Sewer Service Connection Residential 5500. 00 Commercial and Other Cost plus overhead Paved Road Cuts Cost plus overhead Road Jacking and Boring (5200 minimum) Cost plus overhead (S200. 00 minimum) Grass Restoration Cost plus overhead Unauthorized use of Fire Hydrants 5115. 00 Other and Extraordinary Services Cost plus overhead Meter Installation 518 Inch Meter 5130. 00 1 Inch Meter 5250. 00 1 -1R Inch Meter 5500. 00 2 Inch Meter Cost plus overhead 3 Inch Meter and larger Cost plus overhead Fire Hydrant Meter S 25. 00 Water Service Reconnection During Working Hours 525. 00 After Working Hours 535. 00 Meter Rereads and Leak Inspection 520. 00 Delinquency Charge 52. 00 plus 1 . 5 % per month General Service Calls Cost plus overhead Meter Test 518 Inch Meter $ 25. 00 1 Inch Meter 525. 00 14/2 Inch Meter or larger Cost plus overhead Damage Repair Cost plus overhead Line Location i Cost plus overhead Eneineerine Services Site Plan Review - Under 40 Units and Without Lift Station Cost plus overhead (550. 00 minimum) Site Plan Review • Over 40 Units and With Lift Station Cost per ovarhead (5150. 00 minimum) Inspection Fee: Water Per Connection S 25. 00 (550.00 after hours) Sewer Per Connection S 25. 00 (550. 00 after hours) Hydrant Flow Test S60, 00 • Fire Protection Charge - per hydrandyear S 170. 00 Utility Master Plan Revisions required by requested changes to the Indian River County Comprehensive Plan shall be paid by the Applicant requesting the change. Cost plus overhead FRANCHISE CHARGES Application Fees Cost plus overhead S 50. 00 minimum Establish Franchise Cost plus overhead 519100. 00 minimum Franchise Name Charge Cost plus overhead 5115. 00 minimum Franchise Territory Charge Cost plus overhead Change of Ownership : 5115. 00 minimum 49 ERU's or Fewer Cost plus overhead 5115. 00 minimum 50 ERU' s or More Cost plus overhead S300. 00 minimum Rate Hearing: 49 ERU' s or Fewer Cost plus overhead 5300.00 minimum 50 ERU' s or More Cost plus overhead 5575. 00 minimum Public Hearing Cost plus overhead S115. 00 minimum JS/smn schedule/msw S BOARD OF COUNTY COMMISSIONERS 1840 25th Street, Vero Beach, Florida 329604365 Telephone: )772) 567-8000 f November 6 , 2002RjQA Bruce Florence St. Johns River Water Mangement District P . O . Box 1429 Palatka, FL 32178 - 1429 RE : BRINE TO BENT PINE RIB SITE Dear Mr . Florence : The purpose of this letter is to express the Community Development Department' s support for the above,, referenced project. The referenced project conforms with Objective 4 ofthe County ' s Comprehensive Plan-Sanitary Sewer Sub-Element by providing more reclaimed water to existing and future developments requiring irrigation. Should you have any questions , please contact this office at (772 ) 567- 8000 , extension 1243 . Sincerely, Randy Deshazo Planner cc : Robert M . Keating , AICP , Community Development Director Stan Boling, AICP , Planning Director Sasan Rohani, AICP , Chief, Long-Range Planning Mike Hotchkiss, P . E . , Capital Projects Manager f:\cd\u\j w\m ccain 1 ltr. wpd SA MARY SEVER AND POTABLE WATER REGULATIONS 1918 . 04 CHAPTER 918 . SANITARY SEWER AND only, where those septic tanks are approved by POTABLE WATER REGULATIONS the county environmental health and utilities de. partments , and where consistent with the connec- Sec. 918 . 022. Purpose and intent. Sec. 918 .0 . Short title. tion regulations set out in section 918 . 05 below. Sec. 918.03. Definitions. (3) When effluent reuse is required and Sec. 918. 04. Sanitary sewer and potshk water resat ions. per- Sec 918 . 05 , water and wastewater connection mitted by the department of environmental reg- requirements for new development ulation' and the county utilities department, de veloper-s ofprojects having open space areas Section 918 . 01 . Short title. utilizing or projected to utilize ten thousand This chapter shall be known as the "Sanitary ( 10 , 000) gallons or more water per day on a peak Sewer and Potable Water Regulations Ordinance. " day for irrigation , including golf courses, parks , ( Ord . No. 90- 16 , § 1 , 9- 11 -90) medians, and other such areas , which are located within a county utility department service area Section 918 . 02 . Purpose and intent. and are within one mile of the nearest effluent line containing irrigation quality effluent, shall The purpose of this chapter is to provide for the construct effluent re-use lines on - site and effluent implementation of the land development related reuse lines off site to connect to treated wastes policies of the sanitary sewer and potable water water to be used for spray irrigation of the open sub-elements of the comprehensive plan. Other space areas within the development project. policies of the sanitary sewer and potable water sub-elements requiring ordinances for implemen- Such large volume irrigation users shall be re tation will be included in the utilities ordinance quired to take reuse water for spray irrigation . in Title n of the Code of Laws and Ordinances . In The effluent reuse lines constructed for treated the case of duplication between the provisions of wastewater shall be dedicated to Indian River this chapter and the utilities ordinance in the Title County, II, the provisions of the utilities ordinance will Developments located more than one mile from govern . the nearest irrigation quality effluent line and (Ord . No. 9046, § 1 , 9- 11 . 90) having open space areas requiring irrigation shall install dry lines if they are within the county util- Section 918 . 03 . Definitions, ities department service area and irrigation All terms defined in Chapter 901 , definitions, quest' effluent water is or will be available for are applicable in this chapter. re-use . (Ord. No . 90. 16 , § 1 , 9. 11 .90) (4 ) Regional potable water service will be lim- ited to the service areas shown on Figures 3 . B . 7 , Section 918 . 04 . Sanitary sewer and potable 3 . B . 8 , and 3 .B . 9 of the potable water sub-element water regulations, of the Indian River County Comprehensive Plan , ( 1 ) Single-family dwelling units and nonresi• and to areas where the county has legal commits dential projects utilizing less than two thousand mems to provide facilities and services as of Feb- (2 , 000) gallons of potable water per day may use ruary 13 , 1990* private wells where such wells are approved by Regional sanitary sewer service will be limited regulatory agencies including the county environ- to the service areas shown on Figures 3A. 8 , 3A.9 , mental health department and utilities depart- and 3A10 of the sanitary sewer sub-element of ment, in accordance with the connection regula. the Indian River County Comprehensive Plan , and tions set out in section 918 .05 below. to meas where the county has legal commitments (2) Single-family dsvel]ing ,• ^ ;ts and nonresi- to provide facilities and services as of February dential projects generating less than two thou- 13 , 1990. ra sand (2,000) gallons of wastewater per day may (5) No e3dsting on-site wastewater treatment utilize septic tanks for disposal of domestic waste systems or water treatment systems may be re- Supp. No. 8 918/1