Loading...
HomeMy WebLinkAbout2003-098 �{ - Q o1og � (F0RMSIside3)LEGAL(WGC/nhm) (for Final Plat) Certificate of completion dual obligee CONTRACT FOR CONSTRUCTION OF REQUIRED SIDEWALK IMPROVEMENTS NO . PD =01 =01 =03 -CFCSIDE (2000080224) THIS CONTRACT , made and entered into this 1 day of Agra , 2003 , by and between Smigiel Partners XII Ltd . , a Florida limited partnership , hereinafter referred to as " Developer" , and INDIAN RIVER COUNTY , a political subdivision of the State of Florida , by and through its Board of County Commissioners , hereinafter referred to as "County" . WITNESSETH : WHEREAS , Developer has commenced proceedings to effect development of land within Indian River County, Florida ; and WHEREAS , a Certificate of Completion for the development within the unincorporated area of Indian River County shall not be issued until the Developer has installed the required improvements or has guaranteed to the satisfaction of the County that such improvements will be installed ; and WHEREAS , Developer requests the issuance of a Certificate of Completion for Legend Lakes , P . D . Phase 1 ; and WHEREAS , the required sidewalk improvements are to be installed after the issuance of a Certificate of Completion , under guarantees posted with the County. NOW , THEREFORE , IN CONSIDERATION OF THE MUTUAL COVENANTS AND PROMISES HEREIN CONTAINED , the parties agree as follows : 1 . Developer agrees to construct by 2 / 25 / 04 a date being within two years of approval of Final Plat , in a good and workmanlike manner, those improvements described as follows : See Exhibit "A" attached t f or otherwise required by the Code of Laws and Ordinances of Indian River County in connection with the approved Preliminary Plat and Land Development Permit , which are incorporated by reference into this contract . 2 . Developer agrees to construct said improvements strictly in accordance with County policies for sidewalk construction as those policies relate to location , method and type of construction , and all County development regulations and standards , including conditions and requirements of any applicable County right-of-way permit, all of which are hereby incorporated by reference and made a part hereof. 3 . In order to guarantee performance of this contract , Developer shall simultaneously herewith furnish a performance bond underwritten by a surety insurer authorized to transact such business in this state , which shall remain in full force and effect until at least ninety (90 ) days beyond the date set forth in paragraph 1 , or until the covenants of this contract have been fully complied with and satisfactorily completed as determined by the County pursuant to paragraph 5 below , in a form to be approved by the County, with Nal ►M Bead^ as Principal with the Developer and County as Dual Obligees , and C.-a ,,. ar as surety, in the amount of $ a5 , 000 , which amoud is not - less than one hundred fifteen percent ( 115 ) of the estimated total cost of improvements remaining to be constructed , as determined in accordance with the County' s Subdivision and Platting Ordinance . It is understood that the full amount of the guaranty shall remain available to the County and shall not be reduced during the course of construction without an express written authorization from County. Requested reductions shall not be unreasonable withheld by the County . Developer may at any time substitute guarantees , subject to the approval as to form and amount by the County. 4 . Up to $ 1 , 000 , 000 . 00 , or the limits of any applicable underlying or excess insurance coverage carried by Developer or to be obtained during the course of the construction of the subdivision improvements , Developer agrees to indemnify and hold harmless the County against any and all claims , damages , losses , and expenses , including attorney's fees , for property damage , personal or bodily injury , or loss of life , arising from the negligent acts or omissions of the Developer, its officers , employees , agents , or contractors , subcontractors , laborers , or suppliers , relating to the construction of the required sidewalk improvements , including all those improvements to be constructed on existing publicly dedicated or County owned property. 5 . The County agrees to issue a Certificate of Completion , upon a finding as to compliance with all applicable provisions of the County's Development Regulations and Ordinances and upon execution hereof. However, nothing herein shall be construed as creating an obligation upon the County to perform any act or construction or maintenance until such time as the 2 i required improvements are satisfactorily completed . Satisfactory completion in accordance with the land development permit , plans , specifications , and ordinance requirements of Indian River County shall be determined by the County and shall be indicated by specific written approval of the Public Works Director or his designated representative , after receipt of a signed and sealed Certificate of Completion from the project engineer of record . 6 . The County agrees to issue building permits and Certificates of Occupancy prior to the installation of required sidewalk improvements so long as Developer is not in default of the terms of this Contract . 7 . In the event the Developer shall fail or neglect to fulfill its obligations under this contract and as required by the Code of Laws and Ordinances of Indian River County, Florida , the Developer, as principal , and the guarantor or surety shall be jointly and severally liable to pay for the cost of construction and installment of the required improvements to the final total cost, including but not limited to engineering , construction , legal and contingent costs , including reasonable attorney's fees incurred by the County , together with any damages , either direct or consequential , which the County may sustain as a result of the failure of Developer to carry out and execute all provisions of this contract and applicable ordinances of the County. 8 . The parties agree that the County at its option shall have the right, but not the obligation , to construct and install or, pursuant to receipt of competitive bids , cause to be constructed and installed the required improvements in the event Developer shall fail or refuse to do so in accordance with the terms of this contract . Developer expressly agrees that the County may demand and draw upon the existing guaranty or surety for the final total cost of the improvements . Developer shall remain wholly liable for any resulting deficiency , should the guaranty or surety be exhausted prior to completion of the required improvements . In no event shall the County be obligated to expend public funds , or any funds other than those provided by the Developer, the guarantor, or surety, to construct the required improvements . 9 . Any guaranty or surety provided to the County by Developer with respect to this contract shall exist solely for the use and benefit of the County and shall not be construed or intended in any way, expressly or impliedly , to benefit or secure payment to any subcontractor, laborer, materialman or other party providing labor, material , supplies , or services for construction of the required improvements , or to benefit any lot purchaser(s ) , unless the County shall agree otherwise in writing . 10 . This agreement is the full and complete understanding of the parties and shall not be construed or amplified by reference to any other agreement , discussion , or understanding , whether written or oral , except as specifically mentioned herein . This agreement shall not be assigned without the 3 z express written approval of the County. Any amendment , deletion , modification , extension , or revision hereof or hereto shall be in writing , executed by authorized representatives of both parties . IN WITNESS WHEREOF, the parties hereto have set their hands and seals on the day and year first above written . SMIGIEL PARTNERS XII LTD . , a Florida limited partnership , DEVELOPER By GARY SMIGIEL L . C . , a Florida limited liability company, General Partn a By Itl Gary Smi iel , Manager INDIAN4rIVER C N , FLORIDA f, B nneth R. Macht, Chairman Board of County Commissioners COUNTY ATTEST: Jeffrey K . B erk BCC Approved : April 22 , 2003 By. _ seal Deputy Clerk APPROVED AS TO FORM AND LEGAL SU - F IENCY William Col n II County Attorney 4 LEGEND LAKES PHASE 1 COST ESTIMATE .... - . ...•..: •: . •::::: . . ;. . .•: . •;. •: ..::. : . . . . . . . . . . . . ...: •::J • •.: '. : ": :: .J .:.:.:,i:•.%l1•.•.i'•ii.•r:h . .r . . .:. ., ..i. .l.. . ::•:•.:•:... .r .. ., . . . . . .y:J ii:•:•:. . yY.l . . . :•.•'•'f::•i:r{•i. . . . :. . .: . . .: . .; . . . . .:::: . . .. . :J.i'{t:iiii:rµr •• •r.:iirf Jx !}'f.•ri3 f'SY ...r�.ii$Y':irii3-}4'.$iiv:t:'r• :f::;i .: :<i . .x: : ./::iS.vrv: 3.i. ii . .:r$ v N . :. :. : � .Sv: : ;s r f :.:. •ri'i •:. . .•.� ::>'i,:v '::-J:{i ::i:iii.J••J.vtwi. }::ii;x;:'tt .•jr$:•cU: �' . • . 'r • •J:r-�f�;:t•:,tr:a::ity:.tr. t•.: :<y ti • v :i:.J. .,/,• �!t r J. .�I� :?a'i'3��5tt: JJr:r.. ',�y ,x ,a..:tr... .: %?'•�i :Y.:rrr•:;xJi�s.t^,�`,'r%�Il�;;:i; :t?: .i :t:..t.:i:i:i:�uCa ::f:.;...:. . h' '. •...:�•. -'f. .. .hr.. . 2: Jr:r:::::h . . .. . . ��3;rif.>s: :. . .s i . : ,�,.'4!�9X�.'.:: ;:u: y . . . . n ...!J. .tx:J. N'.. :. .::. . ::..v.hw:n. ... . . . . . . ... . . . :5r...r. r: . . . . :... .:. . . . . . . . .:r. r.. i::v::.. II . SANITARY SEWER a . Manholes j 12 each $ 21348. 50 $ 28 , 182. 00 b . 8 " PVC Sewer j 3255 LF $ 20. 85 $ 67 , 866 . 75 h� c . Sin le Services w/ Pipe 3 33 each $ 350 .00 $ 11 , 550. 00 d . Double Services w/ Pie 2 each $ 300100 $ 600 . 00 1 e . Lift Station A 3 1 LS $ 68, 875.00 $ 68 , 875 . 00 f. Force Main 1 LS $ 2, 135 .20 $ 2, 135 . 20 SUBTOTAL Sanitary Sewer $ 179 ,208 .95 III . STORM DRAINAGE j a. . Junction Box 16 each $ 1 , 750. 00 $ 28 , 000 . 00 =b , lnlets j 28 each $ 11450 . 00 $ 40 , 600 . 00 c . Control Structure ? 1 each $ 21910. 00 $ 2, 910 .00 d . 36" ADS Pipe w/ collars ? 285 LF $ 55 . 00 $ 151675 . 00 r e . 30 " ADS Pipe ? 300 LF $ 30. 00 $ 99000900 I I f. 24" ADS Pipe I 1012 LF $ 24 . 00 $ 24 , 288 . 00 ? 24 " RCP ? 616 LF $ 43 . 00 $ 26 , 488 . 00 j h. 15" RCP 9 468 LF $ 19 . 00 $ 8 , 892. 00 I . 12 x 18 RCP ? 125 LF $ 19 . 05 $ 21381 .25 j . 19 x 30 RCP 335 LF $ 23 . 00 $ 7 , 705 . 00 I k. 36" CAP 173 LF $ 40. 00 $ 6 , 920 . 00 I . 30" CAP 147 LF $ 30. 00 $ 4 , 410 . 00 ' m . 24 " CAP 278 LF $ 26 . 00 $ 79228 . 00 ? n . Outfall Flapper Valves 17 1 each 1 $ 1 , 650. 001 $ 28 , 050 . 00 SUBTOTAL Storm Drainage $ 2129547.25 , ? III . WATER DISTRIBUTION a. 8 x 6 Tapping Sleeve & Valve 1 each $ 21850 . 00 $ 29850 . 00 Fb . 8 " DR18 PVC Pipe I 2980 LF $ 11 . 00 $ 32, 780 . 00 c . 6" DR 18 PVC Pipe 320 LF $ 10.00 $ 31200 . 00 ' d . Fire Hydrant Assembl4 each $ 1 ,450. 00 $ 51800 .00 e . 8' Gate Vives 6 each $ 900. 00 $ 59400 . 00 J ? f. 6" Gate Valves 4 each $ 800. 00 $ 31200 . 00 g . Double Services 25 each $ 300 . 00 $ 71500 . 00 h . Single Services 12 each $ 275. 00 $ 31300 . 00 1 I . Fittin s & Restrainers 1 LS $ 13 , 100.00 $ 13 , 100 . 00 �j . Fill & Flush Connection I 1 LS $ 2, 510 . 40 $ 21510 . 40 SUBTOTAL Water Distribution $ 799640 .40 ? IV, PAVING , CURBS , AND MARKINGS a. 1 1 /2" Asphalt Type S-3 j 13119 SY $ 5. 27 $ 69 , 137 . 13 I b. 6 " Baserock j 13119 SY $ 5 . 37 $ 70 , 449 . 03 I ? c. 8 " Stabilized Subgrade 14519 SY $ 2. 71 $ 39 , 346 . 49 d . Miami Curb ? 10300 LF $ 6 . 51 $ 67 , 053 . 00 ` ? e . Type D Curb 250 LF $ 8 . 55 $ 21137 . 50 ? f. Maintenance of Traffic 1 LS $ 11425 , 00 - $ 11425 . 00 E J g . Sawcut / Remove Ex. As halt 1 LS $ 1 ,318. 13 $ 1 , 318 . 13 h . Markings and Signage 3 1 LS $ 11900. 00 $ 1 , 900 .00 ? SUBTOTAL Paving , Curbs, & Markings $ 252 ,766 .28 E ' s PROJECT NUMBER : 00- 327 �El [ wa A Page 1 of 2 t ; V. MISCELLANEOUS a. Buffers/Landscaping 1 LS $ 87 , 776 . 00 $ 87 , 776 . 00 ! b . Relocation of 159 oaks on-site , 2 buffers 1 LS $ 14 ,310. 00 $ 141310. 00 I c . Seed & Muich ! 186640 SF $ 0 . 05 $ 9 ,332.00 d . Engineering Fees ! 1 LS $ 8500 . 00 $ 81500000 ! e . Survey Fees ! 1 LS $ 11 , 500 . 00 $ 11 , 500. 00 ? f. 4' Wide Concrete Sidewalk 5145 LF $ 10 . 00 $ 51 ,450 . 00 g . Street Lights ! B EA $ 200 . 00 $ 11600 00 SUBTOTAL Miscellaneous $ 184,468.00 ! SUBTOTAL PHASE I LEGEND LAKES $ go8 ,630,880 , + 15% CONTINGENCY $ 136,294 . 63 ! TOTAL PHASE I LEGEND LAKES $ 1 ,044,925 .51 CERTIFIEETSW J MOSBYSOCI TES , INC . F P .E# 22326 S26 SY , P . E. L7��� Sys PROJECT NUMBER : 00-327 IF Page 2 of 2