Laserfiche WebLink
FI ORIDA EAST COAST RAILWAY COMP.AA\ <br />SAINT:A1;GES'I'INE, FLORIDA <br />VERO BEACII: <br />CROSSING DESCRIPTION <br />New Length of Crossing Surface: <br />Number of Tracks: <br />Length of Track Panel: <br />AGREEMENT DESCRIPTION <br />Responsible Party: <br />Agreement Date: <br />Division of Responsibility <br />Encase Fiber Optic Cable <br />Maintenance of Traffic <br />Crossing Surface <br />Track Materials <br />Track Construction <br />Paving <br />COST RECAPITULATION <br />Track & Civil Work Item <br />Encase Fiber Optic Cable <br />Mobilization/Material Consolidation <br />Construct Track Panel <br />Maintenance of Traffic/Police Protection <br />Remove Crossing Surface <br />Remove/Replace Track/Crossing Structure <br />Line & Surface Track <br />Replace Crossing Surface <br />Place Asphalt <br />Demobilization/Site Cleanup <br />Totals: <br />01;(19,06 <br />15:36 <br />AVIDEN'IIIE EXIST. 74' WIDE IN PE "T" CONC. GRADE CROSSING WITH A 98' WIDE. OMNI CROSSING. <br />16TH STREET, NIILEPOST 228+118' AAR/I)OT NO. 2721951' <br />FILE: 228/39/118 <br />98 Tf <br />I Ea <br />138 Tf <br />Indian River County <br />Pending <br />County <br />County <br />County <br />County <br />County <br />County <br />Labor <br />n/a <br />1,786.68 <br />1,413.50 <br />n/a <br />463.12 <br />2,648.23 <br />851.82 <br />613.32 <br />168.50 <br />469.00 <br />8,414.16 <br />TOTAL TRACK PROJECT COST: <br />ENGINEERING & SUPERVISION: <br />TOTAL TRACK & CIVIL PROJECT COST: <br />TOTAL SIGNAL IMPROVEMENT PROJECT COST: <br />TOTAL COST TO BE BORNE BY COUNTY: <br />Equipment <br />n/a <br />1,607.20 <br />1,336.68 <br />n/a <br />579.33 <br />3,237.39 <br />651.83 <br />767.22 <br />28.45 <br />67.48 <br />Material <br />n/a <br />n/a <br />11,646.17 <br />n/a <br />n/a <br />n/a <br />8,352.00 <br />31,731.80 <br />n/a <br />n/a <br />8,275.57 51,729.97 <br />$127,400.00 <br />5,096.00 <br />$132,496.00 <br />357,680.00 <br />5490,176.00 <br />PAVING DESCRIPTION <br />Width (Across Road) <br />Length (Along Road) <br />Projected Lift <br />GANG DESCRIPTION <br />3 Fort Pierce Section <br />14 Fort Pierce Smoothing <br />2 Crane <br />2 Loader <br />Contract <br />7,500.00 <br />n/a <br />n/a <br />16,700.00 <br />n/a <br />98 Ft <br />80 Ft <br />3 In <br />Salvage 10.00% <br />Credit Contingency <br />n/a <br />n/a <br />n/a <br />n/a <br />0.00 <br />n/a 0.00 <br />n/a <br />n/a <br />22,785.00 <br />n/a <br />46,985.00 <br />NOTE: THIS IS AN ESTIMATE ONLY, ALL CHARGES WILL BE BASED ON ACTUAL COST. <br />n/a <br />n/a <br />n/a <br />n/a <br />800.00 <br />406.12 <br />1,503.66 <br />1,700.00 <br />157.55 <br />614.38 <br />1,044.36 <br />3,387.66 <br />2,318.06 <br />63.52 <br />Responsible <br />Total Party <br />8,300.00 County <br />3,800.00 County <br />15,900.00 County <br />18,400.00 County <br />1,200.00 County <br />6,500.00 County <br />10,900.00 County <br />36,500.00 County <br />25,300.00 County <br />600.00 County <br />0.00 11,995.30 127,400.00 <br />1,300.00 $/Ft <br />VIndel 1,1.1 ke.ised 7 I' b: <br />#REF! <br />