Laserfiche WebLink
fEC <br />FLORIDA EAST COAST RAILWAY <br />OFFICE OF THE GENERAL MANAGER <br />O F SIGNALS AND COMMUNICATIONS <br />DATE: <br />FILE: <br />TYPE: <br />CLASS: <br />NO. OF DAYS: <br />AAR / DOT #: <br />MILE POST: <br />12/03/06 <br />10.2 <br />IV <br />III <br />20 <br />272195P <br />228+118' <br />Project Type: <br />E STIMATED COST FOR HIGHWAY CROSSING WARNING DEVICES AT 16th STREET VERO BEACH. <br />This estimate should be considered void after one (1) year. <br />MATERIAL <br />GATE ASSEMBLIES <br />GATES <br />GATE FOUNDATIONS <br />CANTILEVERS 34' <br />CANTILEVER FOUNDATIONS <br />W IRED CASE, 4AB WITH HXP-3R2 <br />BATTERY BOX <br />BATTERIES, SAFT SPL250 <br />MISC. GROUND MATERIAL <br />CONDUIT & DIRECTIONAL BORE <br />CABLE <br />MISCELLANEOUS RELAY EQUIPMENT <br />POWER SERVICE <br />MONITORING EQUIPMENT <br />SANITATION & DISPOSAL <br />FREIGHT & HANDLING <br />TAX @ 6.5% <br />TOTAL MATERIALS <br />EXCAVATING EQUIPMENT PER DAY <br />EQUIPMENT RENTAL PER DAY <br />FOREMAN'S TRUCK PER DAY <br />GANG TRUCK PER DAY <br />SUPERVISORS TRUCK PER DAY <br />EQUIPMENT TOTAL <br />ENGINEERING <br />ENGINEERING TOTAL <br />CONSTRUCTION SUPERVISION <br />LABOR ADDITIVE <br />SUPERVISION TOTAL <br />LABOR PER DAY <br />NUMBER OF DAYS <br />LABOR ADDITIVE <br />TOTAL LABOR <br />GANG EXPENSES PER DAY <br />NUMBER OF DAYS <br />TOTAL GANG EXPENSES <br />SUB -TOTAL <br />CONTINGENCIES 5% <br />TOTAL <br />UNIT COST <br />$7,479.00 <br />$500.00 <br />$575.00 <br />$19,183.00 <br />$3,200.00 <br />$78,479.00 <br />$675.00 <br />$212.00 <br />$2,712.52 <br />$45.00 <br />$7,500.00 <br />$1,120.00 <br />$1,800.00 <br />$9,821.00 <br />$1,500.00 <br />$181.00 <br />$125.00 <br />$35.00 <br />$63.00 <br />$35.00 <br />$6,500.00 <br />$312.00 <br />$1,154.10 <br />20 <br />$553.00 <br />20 <br />272195P Rev2.xls <br />UNITS <br />6 EA <br />6 EA <br />6 EA <br />2 EA <br />2 EA. <br />1 EA. <br />2 EA. <br />50 EA. <br />1 PKG. <br />220 FT. <br />1 PKG. <br />1 PKG. <br />1 EA. <br />1 PKG. <br />1 PKG. <br />20 DAYS <br />20 DAYS <br />20 DAYS <br />20 DAYS <br />20 DAYS <br />1 <br />20 DAYS <br />FDOT <br />TOTAL COST <br />$44,874.00 <br />$3,000.00 <br />$3,450.00 <br />$38,366.00 <br />$6,400.00 <br />$78,479.00 <br />$1,350.00 <br />$10,600.00 <br />$2,712.52 <br />$9,900.00 <br />$7,500.00 <br />$1,120.00 <br />$1,800.00 <br />$9,821.00 <br />$1,500.00 <br />$32,906.00 <br />$14 259.00 <br />$268,037.52 <br />$3,620.00 <br />$2,500.00 <br />$700.00 <br />$1,260.00 <br />$700.00 <br />$8,780.00 <br />$6,500.00 <br />$6,500.00 <br />$6,240.00 <br />$3,476.00 <br />$9,716.00 <br />$23,082.00 <br />$13,471.00 <br />$36,553.00 <br />$11,060.00 <br />$340,646.52 <br />$17,032.00 <br />$357,680.00 <br />