Laserfiche WebLink
Construction Cost Estimate <br /> for Lindsey Lanes ! <br /> CONSTRUCTION COST ESTIMATE FOR LINDSEY LANES PHASE IIB <br /> BILL OF SALE OF UTILITIES UNITQUANQTY. QTY• REMAING <br /> TITY UNIT PRICE TOTAL COMPLETE REMAINING COST <br /> GENERAL EARTHWORK <br /> Mobli 0 on LS 1 1800.00 $ 1 ,800.00 90% 100/0 <br /> Clear & Grab A 4.42 $ 1 ,650.00 $7 293.00 100% 100% 180.00 <br /> Excavation/Embanl�en CY p 0.00 <br /> T . Sediment fence LS 1 $0.00 $0.00 100% 100% $p, <br /> Gra ' [/w and Swales $ 1,000.00 1 ,000.00 100% 100% 0.00 <br /> 1 000.00 4,000.00 50% 50% 2,000.00 <br /> VE Subtotal 14,093 .00 21, 180.00 <br /> onuments I.C.Fs LS 1 $2 200.00 $2 200.00 0% ° <br /> 0 /o $2 00 ()0 <br /> Subtotal $2 200.00 .$2,200. 0 <br /> R ADWAY/RIGHT-OF-W Y <br /> Finish Grad ' r/w LF 800 3 .00 $2,40 .00 "SOKOF, 50% 1200.00 <br /> 8" Stabilized Su SY 2080 $5.45 $ 11,336.00 <br /> 6" Rock Base SY 2080 $5.45 $ 11 ,336.00 100% $0.00 <br /> 1-1/4 " S-1 It SY 1906 <br /> S Si EA $4.98 $9,491 .88 <br /> 1 $ 150.00 $ 150.00 0% 100% $ 150.00 <br /> Ob'ectmarker si EA 2 $ 150.00 $300.00 0% ipp% <br /> Street S ' EA 2 $300.00 <br /> $20(1.00 <br /> S $400.00 0% 100% $400.00 <br /> 1 $75.00 $75.00 0% 100°h $75.00 <br /> 6" dbl ellow stri LF 50 <br /> Sod SY 266 100% $50.00 <br /> T T-Turnaround (AOPlace LS 1 $1 .50 $399.00 0% 100% $399.00 <br /> $5,000.00 $5,000.00 100% 0% $0.00 <br /> Remove esixt Tum around LS 1 $200.00 $200.00 100% 00 <br /> Subtotal $0.00 <br /> WATER $41 , 137.88 $2,574.00 <br /> Connect to exist 6" c LS 1 $450.00 $500.00 90% 10% <br /> Connect to exist 4 " c LS 1 $500.00 <br /> � <br /> 4 " vc $400.00 90% 10% $400.00 <br /> 6" <br /> LF 235 $ 10.50 $2,467.50 90% 10010 $246.75 <br /> LF 651 <br /> 6"� $ 1125 $7,323 .75 90% 10% $732.38 <br /> LF 40 $22.00 $880.00 900/0 10% <br /> 6"x6" tee EA 2 $880.00 <br /> 4" $275.00 $550.00 90% 10% $550.00 <br /> EA 1 $350.00 $350.00 90% 10% $350.00 <br /> 6"m EA 3 $450.00 $ 1 ,350.00 90% 10% <br /> M' restrainers LS 1 $ 135.00 <br /> Fire drantassemb $ 1 ,000.00 $ 12000.00 90% 10% $ 100.00 <br /> EA 1 $29300.00 $2,300.00 90% <br /> 6"x4" ni reducer EA i 10% $230.00 <br /> ' <br /> T .um $ 185.00 $ 185 .00 90% 10% $ 18.50 <br /> EA 1 $ 1 ,500.00 $ 1 ,500.00 90% 1 0°h $ 150.00 <br /> Blow-off EA i <br /> Sa le rots $400.00 $400.00 90% 10% $40.00 <br /> EA <br /> 3 $250.00 $750.00 0% 100% $750.00 <br /> Single Service-shot EA 3 $275.00 $825.00 90% <br /> Sm a Service-lo EA 1 0% $82.50 <br /> $360 <br /> Double Service-short $360.00 90% 10% $36.00 <br /> EA 3 $425.00 $ 1275.00 90% 10% $ 127.50 <br /> DoubleServioe-lon EA 2 $500.00 $ 1 ,000.00 9p% o <br /> T LS Included in total ce 10 % $ 100.00 <br /> Subtotal $239416.25 <br />