Laserfiche WebLink
r <br /> Construction Cost Estimate <br /> for Lindsey Lanes <br /> SEWER <br /> Tie imo exist manhole LS 1 $400.00 $400.00 90% <br /> 8" Pvc LF 670 10% $40.00 <br /> S manhole EA $ 12.75 $8,542.50 90% 10% $854.25 <br /> 2 $ 15450.00 $2,900.00 900/0 10% $290.00 <br /> Sin a Service EA 2 <br /> Double service $250.00 $500.00 90% 10% $50.00 <br /> EA 7 $300.00 $2, 100.00 90% 10% <br /> Testtn IIILS Included in total $210.00 <br /> ELECTRIC Subtotal $ 14,442.50 $ 1444 25 0� <br /> Transformer Pads 5 <br /> EA $250.00 $ 1250.00 0% 100% j Z"S' I u3 <br /> Nfnary Condui est. LF 1560 $ 1 ,250.00 <br /> Seconds Condu est. $3 .00 $4,680.00 0% 100% $4,680.00 <br /> StreetlightsLF 780 $3 .50 $2,730.00 00/0 100 /o <br /> LS 10 $2,730.00 <br /> $2,500.00 $2,500.00 0% 100% $2,500.00 <br /> Subtotal $ 11 , 160.00 0% 100% $ 11, ib0.00 <br /> SUMMARY COST <br /> TOTAL COST REMAINING <br /> GENERAL/EARTHWORK $ 14,093 .00 <br /> $2, 180.00 <br /> SURVEY 6k � - ZS -�3 $2,200.00 <br /> $2,200.00 <br /> ROADWAY/RIGHT-OF-WAY $41 , 137.88 <br /> $2,574.00 <br /> WATER <br /> $23541615 <br /> $5,428.00 <br /> SEWER <br /> $ 14,442.50 $ 1 ,444.25 <br /> ELECTRIC <br /> $ 119160.00 $ 11 , 160.00 <br /> PROFESSIONAL <br /> SOILS TESTING $3,000.00 <br /> $300.00 <br /> ENGINEERING-INSPECTIONS/CERTIFICATIONS G <br /> $4,500.00 $ 1 ,500.00 <br /> SURVEYSTAKEOUT <br /> $42500.00 $ 19000.00 <br /> SURVEY AS-BUH TS $3,000.00 <br /> $3,000.00 <br /> GRAND TOTAL $ 1219449.63 <br /> $30,786.25 <br /> BOND AMOUNT (115%) <br /> $35,404. 19 <br />