Laserfiche WebLink
SECTION 01009 SPECIAL PROVISIONS <br /> w 1 . 1 GENERAL <br /> A . Visits to the construction site may be made by representatives of permitting <br /> or governing bodies . Submit details of all instructions from the above to the <br /> ENGINEER immediately . The Work will not be accepted by the OWNER <br /> until final acceptance has been received from the various Regulatory <br /> Agencies having jurisdiction . <br /> B . Furnish sufficient labor , construction equipment and materials , and work <br /> such hours , including night shifts and overtime operations , as may be <br /> necessary to insure the prosecution of the work in accordance with the <br /> approved progress schedule . If , in the opinion of the ENGINEER , the <br /> CONTRACTOR falls behind the progress schedule , take such steps as may <br /> be necessary to improve progress , all without additional cost to the <br /> OWNER . The ENGINEER shall be compensated for his overtime services in <br /> accordance with the Supplementary Conditions , SC- 6 . 02 , <br /> C . All salvageable material and equipment for which specific use , relocation or <br /> other disposal is not specifically noted , shall remain the property of the <br /> OWNER and shall be delivered to the OWNER at the following location : <br /> 4550 41 st Street , at the CONTRACTOR ' s expense . All material and <br /> equipment not in salvageable condition , as determined by the ENGINEER <br /> and the OWNER , shall be disposed of by the CONTRACTOR , at the <br /> CONTRACTOR ' s expense . <br /> D . In addition to these Specifications all work must comply with the <br /> requirements of the local governing agency , St . Johns River Water <br /> Management District , Department of Environmental Protection , Corps of <br /> Engineers , Indian River Farms Water Control District , and all other <br /> applicable State or Federal agencies ' specifications and permits . In the <br /> event of a conflict , the more stringent specification or requirement shall <br /> govern . <br /> E . Before performing any work outside the designated limits of the work site , <br /> secure any necessary permits and authorization from the applicable owner , <br /> or verify in writing that such has been previously obtained . Follow all <br /> requirements of any said permits or authorization . Give the ENGINEER and <br /> appropriate owner ten ( 10) days minimum notice before commencing <br /> construction operations outside the designated limits of the work site . <br /> Adjacent property owners at time of bidding are listed below . <br /> SECTION 01050 FIELD ENGINEERING AND LAYOUT <br /> 1 . 1 GENERAL <br /> A . The CONTRACTOR will furnish all construction staking for the project . All <br /> staking from control will be under the supervision of a Florida Registered Land <br /> Surveyor , <br /> GENERAL REQUIREMENTS <br /> GR -2 <br /> F :\Public Works\Capital Projects\Oslo Road Lateral ABID DOCUMENTS\DIVISION 1 - General Requirements . doc <br /> 5/23/01 <br />