Laserfiche WebLink
B . Develop and make all detail surveys and measurements needed for construction <br /> including but not limited to , slope stakes , batter boards , piling layouts and all <br /> other working lines , elevations and cut sheets . <br /> C . Keep a transit and leveling instrument on the site at all times and a skilled <br /> instrument man available whenever necessary for layout of the Work . <br /> D . Provide all material required for benchmarks , control points , batter boards , grade <br /> stakes , and other items . <br /> , E . Be solely responsible for all locations , dimensions and levels . No data other than <br /> written orders of the ENGINEER shall justify departure from the dimensions and <br /> levels required by the Drawings . <br /> F . Safeguard all points , stakes , grademarks , monuments and benchmarks made or <br /> established on the Work , and reestablish same , if disturbed . Rectify all Work <br /> improperly installed because of not maintaining , not protecting or removing <br /> without authorization such established points , stakes , marks and monuments . <br /> G . When requested by the ENGINEER , provide such facilities and assistance as <br /> may be necessary for the ENGINEER to check line and grade points placed by <br /> the CONTRACTOR . Do no excavation or embankment work until all <br /> cross -sectioning necessary for determining pay quantities has been completed <br /> and checked by the ENGINEER . <br /> H . The cost of performing engineering and layout work described above shall be <br /> included in the contract unit prices for the various items of work to which it is <br /> incidental . No separate payment will be made for surveying or engineering . <br /> 1 . 2 SURVEY WORK AND QUALIFICATIONS OF SURVEYOR <br /> A . Prior to commencing work , the CONTRACTOR shall satisfy himself as to the <br /> accuracy of all survey and existing site information as indicated in the Contract <br /> Documents . Immediately notify the ENGINEER upon discovery of any errors , <br /> inaccuracies or omissions in the survey data . The commencing of any of the work <br /> by the CONTRACTOR shall be held as the CONTRACTOR ' s acceptance that all <br /> survey or existing site information is correct and accurate , without any reasonably <br /> inferable errors , inaccuracies or omissions . <br /> B . The CONTRACTOR shall carefully preserve all control stakes , benchmarks , <br /> reference points and property corners and will be responsible for any mistake or <br /> loss of time caused by their unnecessary loss or disturbance . If the loss or <br /> disturbance of the stakes or marks cause a delay in the Work , the CONTRACTOR <br /> shall have no claim for damages or extension of time . Control stakes , <br /> benchmarks , reference points and property corners disturbed by the <br /> CONTRACTOR 's work shall be replaced by a Florida Registered Land Surveyor <br /> and Mapper , at the CONTRACTOR 's expense . In the event the Owner must <br /> provide the services of the Florida Registered Surveyor and Mapper to perform <br /> this replacement work , the cost of the surveying services will be deducted from <br /> any sums due the CONTRACTOR for the work performed under this Contract . <br /> GENERAL REQUIREMENTS <br /> GR - 3 <br /> FAPublic Works\Capital Projects\Oslo Road Lateral MID DOCUMENTS\DIVISION 1 - General Requirements . doc <br /> a. <br /> 5/23/01 <br />