Laserfiche WebLink
3 ) Condition of planted areas and types of vegetation . <br /> 4) Condition of sodded areas . <br /> 5 ) Conditions of sprinkler systems and associated controls and wiring . <br /> 6 ) Condition of signs . <br /> - 7 ) Conditions of lighting and associated wiring . <br /> 8 ) Significant detail of any pre - existing damages physical features shall be <br /> shown . The coverage of the video should include the limits of effects of <br /> the use of vibratory rollers . <br /> 9 ) This video record shall be presented to the Owner within 30 days of the <br /> Notice to Proceed . A copy shall be kept in the Contractor' s field office . <br /> 10) Payment — No additional payment will be made for this work . <br /> " SECTION 01220 PROGRESS MEETINGS <br /> 1 . 1 SCOPE <br /> A . Date and Time : <br /> 1 . Regular Meetings : As mutually agreed upon by ENGINEER and <br /> CONTRACTOR . <br /> 2 , Other Meetings : On call . <br /> B . Place : CONTRACTOR ' S office at Project site or other mutually agreed upon <br /> location . <br /> C . ENGINEER shall prepare agenda , preside at meetings , and prepare and distribute <br /> a transcript of proceedings to all parties . <br /> D . CONTRACTOR shall provide data required and be prepared to discuss all items <br /> on agenda . <br /> 1 . 2 MINIMUM ATTENDANCE <br /> A . CONTRACTOR <br /> B . SUBCONTRACTOR : <br /> When needed for the discussion of a particular agenda item , CONTRACTOR shall <br /> require representatives of Subcontractors or suppliers to attend a meeting . <br /> r C . ENGINEER . <br /> D . OWNER ' S representative , if required . <br /> E . Utility Representatives <br /> F . Others as appropriate . <br /> G . Representatives present for each party shall be authorized to act on their behalf . <br /> GENERAL REQUIREMENTS <br /> GR - 7 <br /> FAPublic Works\Capital Projects\Oslo Road Lateral J\BID DOCUMENTS\DIVISION 1 - General Requirements . doc <br /> " ` 5/23/01 <br />