Laserfiche WebLink
C . In accepting the Contract , the CONTRACTOR assumes full responsibility for <br /> the sufficiency and safety of all hoists , cranes , temporary structures or work <br /> and for any damage which may result from their failure or their improper <br /> construction , maintenance or operation and will indemnify and save <br /> harmless the OWNER and ENGINEER from all claims , suits or actions and <br /> damages or costs of every description arising by reason of failure to comply <br /> with the above provision . <br /> 1 . 3 TEMPORARY UTILITIES AND SERVICES <br /> A . TEMPORARY WATER <br /> 1 . Provide a temporary water service as required for all construction <br /> purposes and pay for all water used . <br /> 2 . Furnish potable drinking water in suitable dispensers and with cups <br /> for use of all employees at the job . <br /> 3 . Provide all temporary piping , hoses , etc . , required to transport water <br /> to the point of usage by all trades . <br /> 4 . When temporary water service is no longer required , remove all <br /> temporary water lines . <br /> B . TEMPORARY SANITARY FACILITIES <br /> 1 . Provide temporary toilet facilities separate from the job office . <br /> Maintain these during the entire period of construction under this <br /> Contract for the use of all construction personnel on the job . Provide <br /> enough chemical toilets to conveniently serve the needs of all <br /> personnel . Properly seclude toilet facilities from public observation . <br /> 2 . Chemical toilets and their maintenance shall meet the requirements <br /> of State and local health regulations and ordinances . Immediately <br /> correct any facilities or maintenance methods failing to meet these <br /> requirements . Upon completion of work , remove the facilities from <br /> the premises . <br /> 1 . 4 SECURITY <br /> Full time watchmen will not be specifically required as a part of the Contract , but the <br /> CONTRACTOR shall provide inspection of work area daily and shall take whatever <br /> measures are necessary to protect the safety of the public , workmen , and materials , <br /> and provide for the security of the site , both day and night . <br /> 1 . 5 TEMPORARY CONTROLS <br /> Take all necessary precautions to control dust and mud associated with the work of <br /> this Contract . In dry weather , spray dusty areas daily with water in order to control <br /> dust . Take necessary steps to prevent the tracking of mud onto adjacent streets and <br /> highways . <br /> GENERAL REQUIREMENTS <br /> GR - 10 <br /> F :\Public Works\Capital Projects\Oslo Road Lateral J\BID DOCUMENTS\DIVISION 1 - General Requirements . doc <br /> "' 5/23/01 <br />