My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-018
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2016 8:52:52 AM
Creation date
9/30/2015 8:09:47 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2006
Control Number
2006-018
Agenda Item Number
7.M.
Entity Name
Lucas Marine Construction, Inc.
Subject
contract for Oslo Road bridge replacement
Area
Oslo road (CR 606)
Project Number
9705B
Bid Number
2006024
Supplemental fields
SmeadsoftID
4451
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C . In accepting the Contract , the CONTRACTOR assumes full responsibility for <br /> the sufficiency and safety of all hoists , cranes , temporary structures or work <br /> and for any damage which may result from their failure or their improper <br /> construction , maintenance or operation and will indemnify and save <br /> harmless the OWNER and ENGINEER from all claims , suits or actions and <br /> damages or costs of every description arising by reason of failure to comply <br /> with the above provision . <br /> 1 . 3 TEMPORARY UTILITIES AND SERVICES <br /> A . TEMPORARY WATER <br /> 1 . Provide a temporary water service as required for all construction <br /> purposes and pay for all water used . <br /> 2 . Furnish potable drinking water in suitable dispensers and with cups <br /> for use of all employees at the job . <br /> 3 . Provide all temporary piping , hoses , etc . , required to transport water <br /> to the point of usage by all trades . <br /> 4 . When temporary water service is no longer required , remove all <br /> temporary water lines . <br /> B . TEMPORARY SANITARY FACILITIES <br /> 1 . Provide temporary toilet facilities separate from the job office . <br /> Maintain these during the entire period of construction under this <br /> Contract for the use of all construction personnel on the job . Provide <br /> enough chemical toilets to conveniently serve the needs of all <br /> personnel . Properly seclude toilet facilities from public observation . <br /> 2 . Chemical toilets and their maintenance shall meet the requirements <br /> of State and local health regulations and ordinances . Immediately <br /> correct any facilities or maintenance methods failing to meet these <br /> requirements . Upon completion of work , remove the facilities from <br /> the premises . <br /> 1 . 4 SECURITY <br /> Full time watchmen will not be specifically required as a part of the Contract , but the <br /> CONTRACTOR shall provide inspection of work area daily and shall take whatever <br /> measures are necessary to protect the safety of the public , workmen , and materials , <br /> and provide for the security of the site , both day and night . <br /> 1 . 5 TEMPORARY CONTROLS <br /> Take all necessary precautions to control dust and mud associated with the work of <br /> this Contract . In dry weather , spray dusty areas daily with water in order to control <br /> dust . Take necessary steps to prevent the tracking of mud onto adjacent streets and <br /> highways . <br /> GENERAL REQUIREMENTS <br /> GR - 10 <br /> F :\Public Works\Capital Projects\Oslo Road Lateral J\BID DOCUMENTS\DIVISION 1 - General Requirements . doc <br /> "' 5/23/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.