Laserfiche WebLink
in service shall be adjusted by the CONTRACTOR to bring them flush with the <br /> surface of the finished work . <br /> B . The CONTRACTOR shall coordinate the utilities to ensure proper construction <br /> sequencing . CONTRACTOR shall make available survey reference markers to <br /> the various utility companies . <br /> SECTION 01550 ACCESS ROADS PARKING AREAS , AND <br /> USE OF PUBLIC STREETS <br /> 1 . 1 GENERAL <br /> A . Provide all temporary construction roads , walks and parking areas required during <br /> .. construction and for use of emergency vehicles . Design and maintain temporary <br /> roads and parking areas so they are fully usable in all weather conditions . <br /> B . Prevent interference with traffic and the OWNER 's operations on existing roads . <br /> .. Indemnify and save harmless the OWNER from any expenses caused by <br /> CONTRACTOR 's operations over these roads . <br /> C . Roadways damaged by CONTRACTOR shall be restored to their original condition <br /> by the CONTRACTOR subject to approval of the OWNER or ENGINEER . <br /> D . Remove temporary roads , walks and parking areas prior to final acceptance and <br /> return the ground to its original condition , unless otherwise required by the <br /> Contract Documents , <br /> 1 . 2 USE OF PUBLIC STREETS <br /> The use of public streets and alleys shall be such as to provide a minimum of <br /> inconvenience to the public and to other traffic . Any earth or other excavated material <br /> spilled from trucks shall be removed immediately by the CONTRACTOR and the <br /> streets cleaned to the satisfaction of the Owner . <br /> 1 . 3 USE OF PUBLIC STREETS FOR HAUL ROADS <br /> A . Prior to construction , the CONTRACTOR shall designate all proposed haul <br /> roads to be used during the life of the project . Any earth or other materials <br /> spilled from trucks shall be removed by the CONTRACTOR and streets <br /> cleaned to the satisfaction of the Owner . He further shall be responsible for <br /> repairs to any damages caused by his operations , prior to final payment . <br /> B . All trucks carrying earth shall be covered while moving with an appropriate <br /> tarpaulin . Should trucks hauling earth fail to cover their loads , the <br /> CONTRACTOR will be given two ( 2 ) written warnings , after which the <br /> CONTRACTOR shall pay a fine of $ 50 per uncovered truck to the Owner <br /> . when invoked by the Owner to Owner' s Engineer . All cleanup shall be the <br /> responsibility of the CONTRACTOR . <br /> C . All trucks/ moving equipment shall have backup warning horns in proper <br /> ` working order while on the job site . <br /> GENERAL REQUIREMENTS <br /> GR - 15 <br /> FAPublic Works\Capital Projects\Oslo Road Lateral J\BID DOCUMENTS\DIVISION 1 - General Requirements . doc <br /> 5/23/01 <br />