Laserfiche WebLink
4 . If the substitution requires a more extensive review , Engineer will proceed <br /> with the review only after CONTRACTOR has agreed to reimburse Owner <br /> for the review cost . <br /> 5 . Engineer may require CONTRACTOR to furnish at CONTRACTOR ' s <br /> expense additional data about the proposed substitute . <br /> H . Any redesign of structural members shall be performed by , and the plans signed <br /> and sealed by , a Professional Engineer registered in the State of Florida . The <br /> redesign shall be at the CONTRACTOR Is expense . Any redesign will require an <br /> extensive review by the Engineer . The CONTRACTOR must agree to reimburse <br /> the Owner for the review cost prior to the Owner' s Engineer proceeding with the <br /> design review . The ENGINEER ' s hourly rate for review is $ 125 per hour. The <br /> ENGINEER ' s estimated cost of review shall be provided to the CONTRACTOR <br /> prior to proceeding with the review to allow the CONTRACTOR the opportunity to <br /> rescind the request . <br /> I . Engineer will be allowed a reasonable time within which to evaluate each proposed <br /> substitution . Engineer will be the sole judge of acceptability and shall have the <br /> right to deny use of any proposed substitution . The CONTRACTOR shall not <br /> order , install , or utilize any substitution without either an executed Change Order or <br /> Engineer' s notation on the reviewed shop drawing . Owner may require <br /> CONTRACTOR to furnish at CONTRACTOR ' s expense a special manufacturer' s <br /> performance guarantee (s ) or other surety with respect to any substitute and an <br /> indemnification by the CONTRACTOR . ENGINEER will record time required by <br /> Engineer and Engineer' s consultants in evaluating substitutions proposed by <br /> CONTRACTOR and in making changes in the Contract Documents occasioned <br /> thereby . Whether or not a proposed substitute is sued , CONTRACTOR shall <br /> reimburse Owner for the charges of Engineer and Engineer' s consultants for <br /> evaluating each proposed substitute . <br /> J . Substitute materials or equipment may be proposed for acceptance in accordance <br /> with this Section . In the event that substitute materials or equipment are used and <br /> are less costly than the originally specified material or equipment , than the net <br /> difference in cost shall benefit the Owner and CONTRACTOR in equal proportions . <br /> This cost difference shall not be reduced by any failure of the CONTRACTOR to <br /> base his bid on the named materials or equipment . <br /> SECTION 01710 SITE CLEANUP AND RESTORATION <br /> 1 . 1 SCOPE <br /> Furnish all labor , equipment , appliances , and materials required or necessary to <br /> clean up and restore the site after the construction is completed . <br /> 1 . 2 REQUIREMENTS <br /> A . During the progress of the project , keep the work and the adjacent areas <br /> affected thereby in a neat and orderly condition . Remove all rubbish , <br /> surplus materials , and unused construction equipment . Repair all damage <br /> GENERAL REQUIREMENTS <br /> GR - 20 <br /> F :\Public Works\Capital Projects\Oslo Road Lateral ABID DOCUMENTS\DIVISION 1 - General Requirements . doc <br /> 5/23/01 <br />