Laserfiche WebLink
so that the public and property owners will be inconvenienced as little as <br /> possible . <br /> B . Provide onsite containers for the collection of waste materials , debris , and <br /> rubbish and empty such containers in a legal manner when they become <br /> full . <br /> C . Where material or debris has been deposited in watercourses , ditches , <br /> gutters , drains , or catch - basins as a result of the CONTRACTOR ' s <br /> operations , such material or debris shall be entirely removed and <br /> satisfactorily disposed of during the progress of the work , and the ditches , <br /> channels , drains , etc . , shall be kept clean and open at all times . <br /> D . Before the completion of the project , unless otherwise especially directed or <br /> permitted in writing : <br /> 1 . Tear down and remove all temporary buildings and structures ; <br /> 2 . Remove all temporary works , tools , and machinery , or other <br /> construction equipment furnished ; <br /> 3 . Remove all rubbish from any grounds occupied ; and <br /> 4 . Leave the roads , all parts of the premises , and adjacent property <br /> affected by construction operations , in a neat and satisfactory <br /> condition . <br /> E . Restore or replace any public or private property damaged by construction <br /> work , equipment , or employees , to a condition at least equal to that existing <br /> immediately prior to the beginning of the operations . To this end , the <br /> CONTRACTOR shall restore all highway , roadside , and landscaping work <br /> within any right- of-way , platted or prescriptive . Acceptable materials , <br /> equipment , and methods shall be used for such restoration . <br /> F . Thoroughly clean all materials and equipment installed and on completion of <br /> the work , deliver the facilities undamaged and in fresh and new- appearing <br /> condition . <br /> G . It is the intent of the Specifications to place the responsibility on the <br /> CONTRACTOR to restore to their original condition all items disturbed , <br /> destroyed , or damaged during construction . Particular attention will be <br /> placed on restoration of canals to equal or better condition than prior to <br /> construction . <br /> H . When finished surfaces require cleaning with cleaning materials , use only <br /> those cleaning materials which will not create hazards to health or property <br /> and which will not damage the surfaces . Use cleaning materials only on <br /> those surfaces recommended by the manufacturer . Follow the <br /> manufacturer's directions and recommendations at all times . <br /> I . Keep the amount of dust produced during construction activities to a <br /> minimum . At CONTRACTOR ' s expense , spray water or other dust control <br /> agents over the areas , which are producing the dust . Schedule construction <br /> GENERAL REQUIREMENTS <br /> GR -21 <br /> F :\Public Works\Capital Projects\Oslo Road Lateral J\BID DOCUMENTS\DIVISION 1 - General Requirements . doc <br /> 5/23/01 <br />