My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-018
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2016 8:52:52 AM
Creation date
9/30/2015 8:09:47 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2006
Control Number
2006-018
Agenda Item Number
7.M.
Entity Name
Lucas Marine Construction, Inc.
Subject
contract for Oslo Road bridge replacement
Area
Oslo road (CR 606)
Project Number
9705B
Bid Number
2006024
Supplemental fields
SmeadsoftID
4451
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D . Payment for Record Drawings , Review of Electronic As - Builts and <br /> signing and sealing As - Builts shall be made under Pay Item No . 100- <br /> 99 — Record Drawings — Lump Sum . <br /> 1 . 4 ACCURACY <br /> The CONTRACTOR will be held responsible for the accuracy of Record Drawings <br /> and Electronic As - Builts and shall bear any costs incurred in finding utilities as a <br /> result of incorrect data furnished by the CONTRACTOR . <br /> 1 . 5 SUBMITTAL <br /> Upon Substantial Completion of the Work , deliver Record Drawings to ENGINEER . <br /> Final payment will not be made until satisfactory record documents are received by <br /> ENGINEER . <br /> SECTION 01820 POST FINAL INSPECTION <br /> 1 . 1 GENERAL <br /> A . Approximately one year after Substantial Completion , the OWNER will make <br /> arrangements with the ENGINEER and the CONTRACTOR for a post final <br /> inspection and will send a written notice to said parties to inform them of the date <br /> and time of the inspection . <br /> B . Corrections of defective work noted by OWNER and ENGINEER shall comply with <br /> the applicable sections of Article 13 , General Conditions , <br /> C . After the inspection , the OWNER will inform the CONTRACTOR of any corrections <br /> required to release the performance and payment bonds . <br /> w <br /> GENERAL REQUIREMENTS <br /> GR -24 <br /> FAPublic Works\Capital Projects\Oslo Road Lateral J\BID DOCUMENTS\DIVISION 1 - General Requirements . doc <br /> 5/23/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.