Laserfiche WebLink
D . Payment for Record Drawings , Review of Electronic As - Builts and <br /> signing and sealing As - Builts shall be made under Pay Item No . 100- <br /> 99 — Record Drawings — Lump Sum . <br /> 1 . 4 ACCURACY <br /> The CONTRACTOR will be held responsible for the accuracy of Record Drawings <br /> and Electronic As - Builts and shall bear any costs incurred in finding utilities as a <br /> result of incorrect data furnished by the CONTRACTOR . <br /> 1 . 5 SUBMITTAL <br /> Upon Substantial Completion of the Work , deliver Record Drawings to ENGINEER . <br /> Final payment will not be made until satisfactory record documents are received by <br /> ENGINEER . <br /> SECTION 01820 POST FINAL INSPECTION <br /> 1 . 1 GENERAL <br /> A . Approximately one year after Substantial Completion , the OWNER will make <br /> arrangements with the ENGINEER and the CONTRACTOR for a post final <br /> inspection and will send a written notice to said parties to inform them of the date <br /> and time of the inspection . <br /> B . Corrections of defective work noted by OWNER and ENGINEER shall comply with <br /> the applicable sections of Article 13 , General Conditions , <br /> C . After the inspection , the OWNER will inform the CONTRACTOR of any corrections <br /> required to release the performance and payment bonds . <br /> w <br /> GENERAL REQUIREMENTS <br /> GR -24 <br /> FAPublic Works\Capital Projects\Oslo Road Lateral J\BID DOCUMENTS\DIVISION 1 - General Requirements . doc <br /> 5/23/01 <br />