My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-018
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2016 8:52:52 AM
Creation date
9/30/2015 8:09:47 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2006
Control Number
2006-018
Agenda Item Number
7.M.
Entity Name
Lucas Marine Construction, Inc.
Subject
contract for Oslo Road bridge replacement
Area
Oslo road (CR 606)
Project Number
9705B
Bid Number
2006024
Supplemental fields
SmeadsoftID
4451
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 . Pipe Culvert/ PVC Sleeves — All inverts , stations and offsets . <br /> 3 . Outfalls — All pipe inverts , weir box elevations , weir elevation , and sizes . <br /> 4 . Roadway/Off Site Drainage — All inverts ; manhole top elevation ; grate top <br /> elevations . <br /> 5 . Retention Ponds — Perimeter elevations , grade breaks , depths , and calculate <br /> pond area at control elevation and grade breaks above water surface . <br /> 6 . Roadway : <br /> a . Elevations of PVI at Profile Grade Line ( PGL) . <br /> b . Edge of pavement elevations at curb inlets . <br /> c . Install new roadway alignment control points upon final roadway <br /> completion . Include all intersections and side streets . Latitude , <br /> departure and elevations for all control points . <br /> d . Stations and offsets , all structures . <br /> 7 . Lateral J . Canal : <br /> Original and Final Cross Sections of the Lateral J Canal — The <br /> CONTRACTOR shall have a Registered Surveyor take original cross <br /> . section shots of the Lateral J Canal prior to disturbance of the canal banks . <br /> The shots shall be taken at 100 -foot intervals . The Registered Surveyor will <br /> take final cross -section shots at the same locations as the original shots . <br /> The CONTRACTOR shall submit four (4 ) sets of before and after Lateral J <br /> Canal cross -sections to the County that are certified by a Registered <br /> Surveyor . Cost of before and after canal cross - sections shall be included in <br /> the Lump Sum payment for Record Drawings . A partial payment will be <br /> allowed for the before cross - sections not to exceed 10 % of the Lump Sum <br /> bid amount for Record Drawings . <br /> 8 . Utilities : <br /> Record Drawings for water and sewer utilities shall comply with Drawings <br /> M - 15 , M16 , M1 6 (A) , M1 6 ( B ) of the Indian River County Department of Utility <br /> Services Water and Wastewater Utility Standards dated September 1 , 2004 . <br /> 1 . 3 AS - BUILTS <br /> A . CONTRACTOR shall submit marked up Record Drawings to <br /> COUNTY . COUNTY will input As - Built information on Electronic <br /> �. Drawing files . <br /> B . COUNTY shall deliver to CONTRACTOR seven ( 7) sets of As - Builts <br /> plotted from electronic files with the marked up Record Drawings . <br /> C . CONTRACTOR ' s surveyor shall review , sign and seal As - Builts . <br /> CONTRACTOR shall return marked up Record Drawings and six ( 6 ) <br /> sets of signed and sealed As - Builts to COUNTY . <br /> GENERAL REQUIREMENTS <br /> GR -23 <br /> FAPublic Works\Capital Projects\Oslo Road Lateral J\BID DOCUMENTS\DIVISION 1 - General Requirements . doc <br /> w 5/23/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.