My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-018
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2016 8:52:52 AM
Creation date
9/30/2015 8:09:47 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2006
Control Number
2006-018
Agenda Item Number
7.M.
Entity Name
Lucas Marine Construction, Inc.
Subject
contract for Oslo Road bridge replacement
Area
Oslo road (CR 606)
Project Number
9705B
Bid Number
2006024
Supplemental fields
SmeadsoftID
4451
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SC-2 . 06 Preconstruction Conference <br /> SC-2 . 06 Delete paragraph GC-2. 06. A in its entirety and insert the following paragraph in its <br /> place: <br /> A . Immediately after awarding the contract , but before the CONTRACTOR begins <br /> work , the Engineer will call a preconstruction conference at a place the <br /> ENGINEER designates to establish an understanding among the parties as to <br /> the Work and to discuss schedules referred to in paragraph 2 . 05 . 6 , procedures <br /> for handling Shop Drawings and other submittals , and maintaining required <br /> records . Utility companies and others as appropriate will be requested to attend <br /> to discuss and coordinate work . <br /> SC-3 . 06 Coordination of Plans , Specifications , and Special Provisions <br /> SC- 3 . 06 Add the following new paragraphs immediately after paragraph GC-3. 05: <br /> SC - 3 . 06 Coordination of Plans, Specifications, and Special Provisions <br /> A . In case of discrepancy , the governing order of the documents shall be as follows : <br /> 1 . Written Interpretations <br /> 2 . Addenda <br /> 3 . Specifications <br /> 4 . Supplementary Conditions to the General Conditions <br /> 5 . General Conditions <br /> 6 . Approved Shop Drawings <br /> 7 . Drawings <br /> 8 , Referenced Standards . <br /> B . Written/computed dimensions shall govern over scaled dimensions . <br /> SC-4 . 02 Subsurface and Physical Conditions <br /> SC -4 . 02 Add the following new paragraphs immediately after paragraph GC-4 . 02. 8: <br /> C . In the preparation of Drawings and Specifications , ENGINEER or ENGINEER ' s <br /> Consultants relied upon the following reports of explorations and tests of <br /> subsurface conditions at the Site : <br /> 1 . Report dated July 31 , 2001 , prepared by Dunkelberger Engineering and <br /> Testing , Inc . , entitled : Oslo Road Improvements 20th Avenue to Lateral `J ' <br /> Canal , consisting of 14 pages . <br /> D . Reports and drawings itemized in SC -4 . 02 . 0 are not included with the Bidding <br /> Documents . Copies may be examined at Indian River County Administration <br /> Building , Capital Projects , 2nd Floor , 1840 25th Street , Vero Beach FL 32960 during <br /> regular business hours . These reports and drawings are not part of the Contract <br /> Documents . <br /> SC-4 . 03 Differing Subsurface or Physical Conditions <br /> SC-4 . 03 . C . 3 Delete the following text from the second sentence of paragraph GC-4. 03. C. 3: <br /> 00800 - Supplementary Conditions 2006041 <br /> 008004 <br /> FAPublic Works\Capital Projects\Oslo Road Lateral J\BID DOCUMENTS 2006041 \00800 - Supplementary Conditions 2006041 . doc Rev. 05/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.