Laserfiche WebLink
for the safe maintenance of traffic within the project limits . This shall include , but <br /> not be limited to , flaggers , construction and advisory signing , detours , temporary <br /> retaining systems , embankment , base material , asphaltic concrete , striping , <br /> maintenance of pavement , asphaltic concrete curb , stormwater removal , temporary <br /> drainage structures and pipe , pumps , commercial material for driveway <br /> maintenance , flashing arrow boards , high intensity flashing lights , removable and <br /> �. temporary pavement markings , and temporary reflective pavement markers , <br /> temporary pavement , for maintenance of traffic . <br /> E . Non - Compliance : Should the Owner or Engineer determine that traffic within the <br /> project is not being maintained in accordance with the approved traffic control plan <br /> or presents a public safety concern , the contractor shall have until the end of the <br /> working day , in which notification is given , to take action to modify the maintenance <br /> of traffic . Should the contractor fail to make such modification the Owner shall <br /> have the option to fine the Contractor $400 per day until remedied . <br /> F . Contractor' s Maintenance of Traffic Plan shall maintain two -way vehicular traffic on <br /> Oslo Road at all times . The Contractor shall maintain one lane of traffic at all times <br /> during 60" RCP sub- lateral culvert construction . Owner shall have option to fine <br /> the Contractor $ 1 , 000 . 00 per day for Maintenance of Traffic Plan non - compliance . <br /> G . Payment shall be made under : <br /> Item No . 102 - 1 - Maintenance of Traffic - Lump Sum <br /> Item No . 102 - 1 — Traffic Control Officer — Man Hour <br /> Item No . 102 - 70 - 11 — Barrier Wall ( Concrete) (Temporary) - Linear Foot <br /> Item No . 102 -70- 11 A — Barrier Wall ( Concrete) - Linear Foot <br /> Item No . 102 - 81 - 1 — Impact Attenuator Modules Vehicle ( Inertial ) (Temporary) - <br /> Each <br /> Item No . 102 -81 - 1A — Impact Attenuator Modules Vehicle ( Inertial ) — Each <br /> SECTION 00104 EROSION AND WATER POLLUTION <br /> CONTROL <br /> 1 . 1 The Contractor shall install erosion and water pollution control methods in <br /> ° accordance with FDOT Index 100 , 102 , 103 and 104 , Standard Specifications Section <br /> 104 , and all permit requirements . The Contractor is responsible for meeting appropriate <br /> federal , state , and local regulations and water quality standards , such as turbidity . All <br /> disturbed areas will be replanted with approved vegetation cover ( either final or <br /> temporary) within 30 days of final grading . <br /> A . Preconstruction Conference : At the preconstruction conference the Contractor <br /> shall present , in written form , his plans and schedules for prevention , control , and <br /> abatement of erosion and water pollution . <br /> B . Canals : Floating turbidity barriers shall be installed in all permanent water course <br /> in a manner so as not to act as a dam . Barriers shall be located at distance of no <br /> greater than 25 feet downstream from the last point of construction . <br /> TECHNICAL PROVISIONS <br /> TP - 3 <br /> FAPublic Works\Capital Projects\Oslo Road Lateral J\BID DOCUMENTS\DIVISION 2 - Technical Provisions . doc <br />