Laserfiche WebLink
C . Silt Fences : Silt fences shall be installed to prevent silt and erosion from leaving <br /> the project limits particularly adjacent to wetlands , roadside ditches or existing <br /> bodies of water . <br /> D . Storm Sewer System : The Contractor shall protect the storm sewer system from <br /> erosion and sedimentation during construction . This may include the use of baled <br /> hay , silt fences or any other method approved by the Engineer . All such costs <br /> associated with this shall be included in the unit cost of storm sewer system . <br /> Should any constructed item be damaged due to erosion or sedimentation , the <br /> Contractor shall repair or replace the item with no additional compensation . All new <br /> and existing (where called for) storm sewer pipes shall be clean and free from silt <br /> prior to final acceptance . <br /> E . Permits to be Obtained by Contractor : <br /> 1 . The OWNER has obtained certain permits for this project and they are listed <br /> in paragraph SC - 6 . 08 of the Supplementary Conditions . Per paragraph SC - <br /> 6 . 08 . 0 of the Supplementary Conditions , the CONTRACTOR shall apply for , <br /> obtain , and pay for all other required permits and licenses . This may <br /> include but not be limited to : <br /> a . Long -term or short-term dewatering permit as required by the <br /> St . Johns River Water Management District ( SJRWMD ) . <br /> Contact SJRWMD at (321 ) 984 -4940 to determine which <br /> permit is required and the associated statutory requirements ; <br /> b . Florida Department of Environmental Protection ( FDEP ) <br /> " Notice of Intent to Use Generic Permit for Stormwater <br /> Discharge From Construction Activities That Disturb Five or <br /> More Acres of Land " permit application form . Contact FDEP <br /> at (407) 894 - 7555 or ( 850 ) 921 - 9904 ; and <br /> C , U . S . Environmental Protection Agency ( EPA) " Notice of Intent <br /> ( NOI ) for Storm Water Discharges Associated With <br /> Construction Activity Under a NPDES General Permit . " <br /> 2 . Provide copies of all permits to the OWNER and ENGINEER and comply <br /> with all conditions contained in all permits at no extra cost to the OWNER . If <br /> there is a conflict between any permit requirement and these Specifications , <br /> the more stringent specification or requirement shall govern . <br /> F . Non - Compliance : Should the Owner or Engineer determine that erosion control <br /> within the project is not being maintained in accordance with the FDOT indexes <br /> and specifications , the contractor shall have until the end of the working day in <br /> which notification is given to take corrective action . Should the contractor fail to <br /> make such modification the Owner shall have the option to fine the contractor $ 400 <br /> per day until remedied . <br /> G . Compensation : All payment for the above items shall be made under Item <br /> Item No . 104 -2 — Prevention , Control & Abatement of Erosion & Water Pollution — <br /> Lump Sum <br /> TECHNICAL PROVISIONS <br /> TP -4 <br /> F :\Public Works\Capital Projects\Oslo Road Lateral J\BID DOCUMENTS\DIVISION 2 - Technical Provisions . doc <br />