My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-018
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2016 8:52:52 AM
Creation date
9/30/2015 8:09:47 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2006
Control Number
2006-018
Agenda Item Number
7.M.
Entity Name
Lucas Marine Construction, Inc.
Subject
contract for Oslo Road bridge replacement
Area
Oslo road (CR 606)
Project Number
9705B
Bid Number
2006024
Supplemental fields
SmeadsoftID
4451
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
On slopes greater than 3 : 1 , the Contractor shall prevent the sod from sliding by <br /> means of wooden pegs driven through the sod blocks into firm earth , at suitable <br /> intervals . <br /> Sodding shall not be performed when weather and soil conditions are , in the <br /> Engineer's opinion , unsuitable for proper results . <br /> Sod shall be placed around all structures , equipment pads , etc . <br /> I . Watering : The areas on which the sod is to be placed shall contain sufficient <br /> moisture , as determined by the Engineer , for optimum results . After being placed , <br /> the sod shall be kept in a moist condition to the full depth of the rooting zone for at <br /> least 2 weeks . Thereafter , the Contractor shall apply water as needed until the sod <br /> roots and starts to grow for a minimum of 60 days ( or until final acceptance , <br /> whichever is latest) . <br /> J . Maintenance : The Contractor shall , at his expense , maintain the sodded areas in <br /> a satisfactory condition until final acceptance of the project . Such maintenance <br /> shall include repairing of any damaged areas and replacing areas in which the <br /> establishment of the grass stand does not appear to be developing satisfactorily . <br /> Replanting or repair necessary due to the Contractor's negligence , carelessness or <br /> failure to provide routine maintenance shall be at the Contractor' s expense . <br /> The Contractor shall maintain the sodded area up to the final acceptance date as <br /> directed by the Engineer . Grass height shall not exceed 6 " without mowing . <br /> Clippings shall be removed from sidewalk . <br /> K . Article 575 -5 . The first two paragraphs under this Article are deleted and the <br /> following substituted : <br /> The contract unit price for sodding shall include the costs of sod , fertilizer ( 2 <br /> applications ) , sidewalk sweeping after mowing , mowing , pegging disposal of <br /> clippings , water , tools , equipment , labor and all other incidentals necessary . <br /> L . Payment shall be made under : <br /> Item No . : 575 - 1 - 1 - Sodding ( Bahia) - Per Square Yard <br /> w <br /> SECTION 00700 SIGNING AND PAVEMENT MARKING <br /> A . Signing and pavement marking for traffic control shall conform to the requirements <br /> of the Standard Specifications ( 2004 ) , Manual on Uniform Traffic Control Devices , <br /> Supplemental Specifications , Roadway and Traffic Design Standards , <br /> manufacturers specifications . <br /> B . Traffic Signs : All existing signs which are the property of the Owner shall be <br /> transported to the Indian River County Road and Bridge Maintenance Yard by the <br /> Contractor during construction if they are within the construction limits . Care shall <br /> be exercised by the Contractor during removal , storage and relocation so as not to <br /> damage the signs . If any damage occurs , as determined by the Owner' s Engineer <br /> or Resident Construction Inspector , the sign shall be replaced by the Contractor <br /> with no compensation . <br /> TECHNICAL PROVISIONS <br /> TP - 11 <br /> «. FAPublic Works\Capital Projects\Oslo Road Lateral J\BID DOCUMENTS\DIVISION 2 - Technical Provisions . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.