My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-018
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2016 8:52:52 AM
Creation date
9/30/2015 8:09:47 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2006
Control Number
2006-018
Agenda Item Number
7.M.
Entity Name
Lucas Marine Construction, Inc.
Subject
contract for Oslo Road bridge replacement
Area
Oslo road (CR 606)
Project Number
9705B
Bid Number
2006024
Supplemental fields
SmeadsoftID
4451
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 . 03 REFERENCES <br /> A . ANSI /AWWA C651 - Standard for Disinfecting Water Mains . <br /> . 1 . 04 SUBMITTALS <br /> A . Test Reports : Indicate results comparative to specified requirements . <br /> Submit two ( 2 ) copies of test results to Engineer in accordance with <br /> Submittal specifications . <br /> B . Final approval of the bacterial samples shall be received from the Florida <br /> Department of Environmental Protection prior to the time that the system is <br /> placed into operation . Sampling procedures shall be done in accordance <br /> with FDEP requirements . <br /> C . Bacteriological sampling locations shall meet FDEP requirements and be <br /> taken where shown on the drawings and as directed by the Engineer . <br /> D . Flushing and pigging plan to be submitted as described in this section and <br /> Section 02441 . <br /> 1 . 05 QUALITY ASSURANCE <br /> A . Perform Work in accordance with ANSI/AWWA C651 . <br /> 1 . 06 REGULATORY REQUIREMENTS <br /> A . Conform to applicable Florida DEP requirements for performing the work of <br /> this Section . <br /> B . Work shall conform to Indian River County Standards . <br /> PART 2 - PRODUCTS <br /> 2 . 01 DISINFECTION CHEMICALS <br /> A . Chemicals : The disinfecting agent shall be sodium hypochlorite solution <br /> ANSI/AWWA B303 or liquid chlorine ANSI/AWWA B301 . Dry hypochlorite , <br /> similar to " HTH " or equal may also be used as the disinfecting agent . <br /> Bleach or Clorox is not acceptable . <br /> PART 3 - EXECUTION <br /> 3 . 01 EXAMINATION <br /> A . Verify that piping systems have been cleaned , inspected , and tested . <br /> '. B . Coordinate scheduling of flushing , pressure testing , and disinfection <br /> activities with tie - ins , certifications , and sequence of construction . <br /> r 3 . 02 FLUSHING AND PRESSURE TESTING - PIPING <br /> A . The Contractor shall furnish and install suitable temporary testing plugs or <br /> caps for the water lines , all necessary pressure pumps , hose , pipe <br /> connections , meters , gauges and other similar equipment , and all labor <br /> required , all without additional compensation for conducting pressure and <br /> TECHNICAL PROVISIONS <br /> TP-20 <br /> FAPublic Works\Capital Projects\Oslo Road Lateral J\BID DOCUMENTS\DIVISION 2 - Technical Provisions . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.