Mr . Tom Frame Geosyntec ' <br /> 7 November 2009 consultants <br /> Page 3 <br /> received and reviewed three subcontractor bids , with base bid costs of $ 12 , 350 ( $ 8 , 850 Southern <br /> Foam Insulation, Inc . plus $ 3 , 500 PR& D PSSC bid) , $ 13 , 400 ( $ 9 , 900 Perna- Fill Corporation <br /> plus $ 3 , 500 PR& D PSSC bid ) and $ 17 , 800 ( total estimate from Environmental Resources <br /> Management, Inc . [ does not include vacuum truck time or liquids disposal , or any contingency <br /> costs ] ) . Based upon the estimates submitted , Geosyntec will subcontract the lowest bidder, <br /> Southern Foam Insulation , Inc . in coordination with PR& D , to perfonn the UST closure services <br /> and will perform oversight of the subcontractor during field activities . <br /> In addition to the base costs above , Geosyntec has budgeted $ 1 , 450 for costs associated <br /> with <br /> vacuum truck extraction of residual fluids within the USTs , rinse fluids/contact water from the <br /> cleaning of the USTs and disposal of up to 1 , 000 gallons of petroleum contact water from the <br /> vacuum truck . <br /> Due to the uncertainties associated with the UST closure projects , a 20 percent contingency has <br /> been added to Task element B . The contingency is in place to cover items such as costs for an <br /> increase in vacuum truck on site time , increases in petroleum - contact water disposal volumes , <br /> increases in project duration due to issues with the removal of the existing UST system pumps <br /> and dispenser system , etc . Geosyntec will notify IRC and secure approval of any field <br /> conditions that may require access to contingency fees . Geosyntec ' s proposal assumes two days <br /> of oversight for field activities associated with the UST closure activities . A breakdown of <br /> estimated project costs is included as Attachment B . <br /> Phase C — UST Closure Report <br /> Geosyntec will prepare a brief Tank Closure Report in accordance with Chapter 62 - 761 , FAC <br /> and FDEP Storage Tank System Closure Requirements . Since no soil and/or groundwater <br /> sampling will be performed , the report will only provide a brief overview of the work completed <br /> and include a copy of the PSSC signed closure form . <br /> A breakdown of estimated project costs is included as Attachment B . <br /> ASSUMPTIONS <br /> The following assumptions were made in developing this fee proposal : <br /> • Geosyntec will not be responsible for the repair of paved surfaces damaged during UST <br /> closure activities . <br /> X R09293 CC R09293 . DOC <br /> E', nginclers I Scientists inlv ) vatt ) rs <br />