My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-300
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2016 9:26:52 AM
Creation date
10/1/2015 3:58:31 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/17/2009
Control Number
2009-300
Agenda Item Number
8.F.
Entity Name
Geosyntec Inc.
Mark's Mobile
Subject
Work No. 22 Underground Fuel Tanks
Area
Mark's Mobile 4310 20th St.
Supplemental fields
SmeadsoftID
10872
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr . Tom Frame Geosyntec ' <br /> 7 November 2009 consultants <br /> Page 3 <br /> received and reviewed three subcontractor bids , with base bid costs of $ 12 , 350 ( $ 8 , 850 Southern <br /> Foam Insulation, Inc . plus $ 3 , 500 PR& D PSSC bid) , $ 13 , 400 ( $ 9 , 900 Perna- Fill Corporation <br /> plus $ 3 , 500 PR& D PSSC bid ) and $ 17 , 800 ( total estimate from Environmental Resources <br /> Management, Inc . [ does not include vacuum truck time or liquids disposal , or any contingency <br /> costs ] ) . Based upon the estimates submitted , Geosyntec will subcontract the lowest bidder, <br /> Southern Foam Insulation , Inc . in coordination with PR& D , to perfonn the UST closure services <br /> and will perform oversight of the subcontractor during field activities . <br /> In addition to the base costs above , Geosyntec has budgeted $ 1 , 450 for costs associated <br /> with <br /> vacuum truck extraction of residual fluids within the USTs , rinse fluids/contact water from the <br /> cleaning of the USTs and disposal of up to 1 , 000 gallons of petroleum contact water from the <br /> vacuum truck . <br /> Due to the uncertainties associated with the UST closure projects , a 20 percent contingency has <br /> been added to Task element B . The contingency is in place to cover items such as costs for an <br /> increase in vacuum truck on site time , increases in petroleum - contact water disposal volumes , <br /> increases in project duration due to issues with the removal of the existing UST system pumps <br /> and dispenser system , etc . Geosyntec will notify IRC and secure approval of any field <br /> conditions that may require access to contingency fees . Geosyntec ' s proposal assumes two days <br /> of oversight for field activities associated with the UST closure activities . A breakdown of <br /> estimated project costs is included as Attachment B . <br /> Phase C — UST Closure Report <br /> Geosyntec will prepare a brief Tank Closure Report in accordance with Chapter 62 - 761 , FAC <br /> and FDEP Storage Tank System Closure Requirements . Since no soil and/or groundwater <br /> sampling will be performed , the report will only provide a brief overview of the work completed <br /> and include a copy of the PSSC signed closure form . <br /> A breakdown of estimated project costs is included as Attachment B . <br /> ASSUMPTIONS <br /> The following assumptions were made in developing this fee proposal : <br /> • Geosyntec will not be responsible for the repair of paved surfaces damaged during UST <br /> closure activities . <br /> X R09293 CC R09293 . DOC <br /> E', nginclers I Scientists inlv ) vatt ) rs <br />
The URL can be used to link to this page
Your browser does not support the video tag.