My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-300
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2016 9:26:52 AM
Creation date
10/1/2015 3:58:31 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/17/2009
Control Number
2009-300
Agenda Item Number
8.F.
Entity Name
Geosyntec Inc.
Mark's Mobile
Subject
Work No. 22 Underground Fuel Tanks
Area
Mark's Mobile 4310 20th St.
Supplemental fields
SmeadsoftID
10872
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr . Tom Frame Geosyntec <br /> 7 November 2009 consultants <br /> Page 4 <br /> • No costs are provided for the removal of the overhead canopy or other structures on site . <br /> • The USTs will be drained of fuel by IRC (to the greatest extent feasible) prior to UST <br /> closure field activities . <br /> • The fuel dispensers , fuel pumps , and miscellaneous debris will be transported to the IRC <br /> Class I landfill for disposal . <br /> • No concrete work will be required to fill fuel dispenser sumps . <br /> • All site work can be performed in Level D personal protective equipment . <br /> SCHEDULE <br /> Geosyntec anticipates that upon approval from IRC , UST closure field activities will be initiated <br /> within four weeks . It is anticipated that the UST closure activities will require approximately <br /> two days . The final Tank Closure Report will be provided to IRC within two weeks of <br /> completion of field activities . <br /> ESTIMATED BUDGET <br /> The fee proposal is provided as Attachment B . The total estimated budget to complete to work <br /> described in the fee proposal is $ 20 , 753 (which includes the 20 % contingency on Phase B <br /> costs ) . <br /> CLOSURE <br /> Geosyntec appreciates the opportunity to submit to LRC the attached fee proposal ( Attachment <br /> B ) for services at the site . If this proposal is acceptable to you , please indicate your agreement <br /> by signing the Work Authorization , which references this proposal . Please return one signed <br /> Work Authorization to Mr . Langenbach ' s attention . Please do not hesitate to contact me with <br /> any questions you may have as you review this fee proposal . <br /> Sincerely;" ' <br /> { <br /> Jit ` angnbach , P . E . <br /> Ass fate ngineer <br /> X R09293 :CC R09293 . DOC <br /> (' ngllickelds Scientists irlll ( watOrs <br />
The URL can be used to link to this page
Your browser does not support the video tag.