Laserfiche WebLink
Mr . Tom Frame Geosyntec <br /> 7 November 2009 consultants <br /> Page 4 <br /> • No costs are provided for the removal of the overhead canopy or other structures on site . <br /> • The USTs will be drained of fuel by IRC (to the greatest extent feasible) prior to UST <br /> closure field activities . <br /> • The fuel dispensers , fuel pumps , and miscellaneous debris will be transported to the IRC <br /> Class I landfill for disposal . <br /> • No concrete work will be required to fill fuel dispenser sumps . <br /> • All site work can be performed in Level D personal protective equipment . <br /> SCHEDULE <br /> Geosyntec anticipates that upon approval from IRC , UST closure field activities will be initiated <br /> within four weeks . It is anticipated that the UST closure activities will require approximately <br /> two days . The final Tank Closure Report will be provided to IRC within two weeks of <br /> completion of field activities . <br /> ESTIMATED BUDGET <br /> The fee proposal is provided as Attachment B . The total estimated budget to complete to work <br /> described in the fee proposal is $ 20 , 753 (which includes the 20 % contingency on Phase B <br /> costs ) . <br /> CLOSURE <br /> Geosyntec appreciates the opportunity to submit to LRC the attached fee proposal ( Attachment <br /> B ) for services at the site . If this proposal is acceptable to you , please indicate your agreement <br /> by signing the Work Authorization , which references this proposal . Please return one signed <br /> Work Authorization to Mr . Langenbach ' s attention . Please do not hesitate to contact me with <br /> any questions you may have as you review this fee proposal . <br /> Sincerely;" ' <br /> { <br /> Jit ` angnbach , P . E . <br /> Ass fate ngineer <br /> X R09293 :CC R09293 . DOC <br /> (' ngllickelds Scientists irlll ( watOrs <br />