Laserfiche WebLink
a <br /> aoo g -d97 <br /> j Y <br /> Board of County Commissioners <br /> Administration - Building A (South) <br /> 1801 27th Street <br /> Vero Beach, Florida 32960 <br /> Telephone: (772) 567-8000 FAX : 772-778-9391 <br /> Project: <br /> Vero Lakes Estates — R/W Staking , Topographic Survey <br /> IRC Project 0811 <br /> WORK ORDER NO. 3 ( Engineering/Surveying ) <br /> FOR <br /> PROFESSIONAL SERVICES AGREEMENT <br /> ANNUAL SURVEYING and MAPPING/GIS SERVICES <br /> WITH <br /> Masteller, Moler, Reed & Taylor, Inc. <br /> In accordance with Contract No. 0725 2007-2009 <br /> This Work Order No. 3 is in accordance with the existing AGREEMENT dated November 6th <br /> 2007 between Masteller, Moler, Reed & Taylor, Inc. (SURVEYOR) and Indian River County <br /> (COUNTY) . This Work Order No. 3 amends the agreement as follows : <br /> SECTION I — PROJECT LIMITS <br /> This Work Order No. 3 is for the SURVEYOR to perform Right of Way staking and limited <br /> topographic survey as well as perform various surveying tasks related to the construction of the <br /> outlined secondary roads within the Vero Lakes Estates Sub Division . <br /> Limits are 108th Avenue and 1061h Avenue from CR 512 to 94th Street, and 94" Street from 106th <br /> Avenue to 108th Avenue as shown on the attached project limits map, all lying in Indian River <br /> County, Florida . <br /> SECTION II - SCOPE OF SERVICES <br /> As agreed upon between Masteller, Moler, Reed & Taylor, Inc. and Indian River County, the <br /> SURVEYOR shall provide Professional Land Surveying services to complete all tasks as <br /> outlined in this Work Order No . 3 described as follows : <br /> • Task 9 — Vero Lake Estates Right of Way Staking, Topographic Survey. <br /> 1 . Calculate ( in state plane coordinates, North American Datum of 1988) the center line <br /> of the rights of way in relationship to CR512 baseline and the recorded Vero Lake <br /> Estates plat. <br /> 2 . Perform Bench run using National Geodetic Vertical Datum of 1929 and set 2 <br /> benchmarks in the vicinity and outside the limits of the project . <br /> 3 . Perform a closed traverse loop along the center line . Adjust as necessary . Search , <br /> recover and locate any existing monumentation . <br /> 4 . Stake the Right-of-Way lines at 50' foot intervals throughout the limits of Task 1 . <br /> F:\Engineering\Capital Projects\0725- 2007 Annual Prof. Survey Contract\2007-2008 ProjectsWMR&TYLE 108th & 94th RW & <br /> Topo\0725 W03 VILE 108th Ave & 94th St. 3- 18-08.doc <br />