Laserfiche WebLink
IRC Work Order #3 MMR&T <br /> Vero Lake Estates 108" -106" Ave & 94t' Street <br /> Page 2 of 6 <br /> 5. Obtain elevations along the center line profile of the right-of-way at 100 foot intervals , <br /> intersections and or major grade changes along center line. <br /> 6 . Obtain elevations along the Right-of-Way lines at +/- 100 foot intervals and changes <br /> in direction . <br /> 7 . Locate any ditches , major swales for mapping . <br /> 8 . Locate , if any , dirt roads or "trails" along 108`" Avene and 94th Street. Locate the <br /> existing dirt road (or ditches) along 106` Avenue between 94th Street and County <br /> Road 512 . <br /> 9 . Prepare a certified survey of the Center line and Right of Way geometry (with state <br /> plane coordinates) , staking , found or set vertical and horizontal monumentation and <br /> drainage features and elevations. <br /> Task 2: <br /> 1 . Perform various surveying services in support of the design and construction as <br /> directed by the County Engineer or County surveyor at time and materials rates in <br /> accordance with the existing AGREEMENT dated November 6'h, 2007 between <br /> SURVEYOR and the COUNTY. <br /> SECTION III — TIME FOR COMPLETION 8r DELIVERABLEWWORK PRODUCT <br /> 1 . Task 1 shall be completed within thirty (30) business days from Notice to Proceed . <br /> • Provide Three (3) hard copies of the Survey and a CD containing an electronic <br /> AutoCAD file in state plane geometry and PDF of each sheet of the survey. <br /> 2 . Task 2 : On an as needed and/or requested basis. <br /> SECTION IV — COMPENSATION <br /> Task 1 : <br /> The COUNTY agrees to pay, and the SURVEYOR agrees to accept, for the Task 1 services <br /> rendered as identified in Sections I , ll , and III of this Work Order No. 3 , a lump sum fee of <br /> $9 , 700. 00. <br /> Task 2 : <br /> The COUNTY agrees to pay, and the SURVEYOR agrees to accept, for the Task 2 services <br /> rendered as identified in Sections I , Il , and III of this Work Order No . 3, on a Time and Material <br /> basis , Not To Exceed fee of $5 , 000 . 00 . <br /> Remainder of page left blank intentionally <br /> F:tEngineering\Capital Projects10725- 2007 Annual Prof. Survey Contract12007-2008 ProjectslMMR&TYLE 108th & 94th RW & <br /> Topo10725 W03 VILE 108th Ave & 94th St. 3-18-08.doc <br />