My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-087
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2016 2:19:35 PM
Creation date
10/1/2015 12:01:56 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/18/2008
Control Number
2008-087
Agenda Item Number
7.I.
Entity Name
Mastellelr, Moler,Reed & Taylor
Subject
Work Order No.3 Vero Lakes Estates Project
Area
108th., 106th, and 94th. Street right of way
Project Number
0811
Supplemental fields
SmeadsoftID
6934
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC Work Order #3 MMR&T <br /> Vero Lake Estates 108" -106" Ave & 94t' Street <br /> Page 2 of 6 <br /> 5. Obtain elevations along the center line profile of the right-of-way at 100 foot intervals , <br /> intersections and or major grade changes along center line. <br /> 6 . Obtain elevations along the Right-of-Way lines at +/- 100 foot intervals and changes <br /> in direction . <br /> 7 . Locate any ditches , major swales for mapping . <br /> 8 . Locate , if any , dirt roads or "trails" along 108`" Avene and 94th Street. Locate the <br /> existing dirt road (or ditches) along 106` Avenue between 94th Street and County <br /> Road 512 . <br /> 9 . Prepare a certified survey of the Center line and Right of Way geometry (with state <br /> plane coordinates) , staking , found or set vertical and horizontal monumentation and <br /> drainage features and elevations. <br /> Task 2: <br /> 1 . Perform various surveying services in support of the design and construction as <br /> directed by the County Engineer or County surveyor at time and materials rates in <br /> accordance with the existing AGREEMENT dated November 6'h, 2007 between <br /> SURVEYOR and the COUNTY. <br /> SECTION III — TIME FOR COMPLETION 8r DELIVERABLEWWORK PRODUCT <br /> 1 . Task 1 shall be completed within thirty (30) business days from Notice to Proceed . <br /> • Provide Three (3) hard copies of the Survey and a CD containing an electronic <br /> AutoCAD file in state plane geometry and PDF of each sheet of the survey. <br /> 2 . Task 2 : On an as needed and/or requested basis. <br /> SECTION IV — COMPENSATION <br /> Task 1 : <br /> The COUNTY agrees to pay, and the SURVEYOR agrees to accept, for the Task 1 services <br /> rendered as identified in Sections I , ll , and III of this Work Order No. 3 , a lump sum fee of <br /> $9 , 700. 00. <br /> Task 2 : <br /> The COUNTY agrees to pay, and the SURVEYOR agrees to accept, for the Task 2 services <br /> rendered as identified in Sections I , Il , and III of this Work Order No . 3, on a Time and Material <br /> basis , Not To Exceed fee of $5 , 000 . 00 . <br /> Remainder of page left blank intentionally <br /> F:tEngineering\Capital Projects10725- 2007 Annual Prof. Survey Contract12007-2008 ProjectslMMR&TYLE 108th & 94th RW & <br /> Topo10725 W03 VILE 108th Ave & 94th St. 3-18-08.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.