My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-055
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2016 1:32:46 PM
Creation date
9/30/2015 11:59:09 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
02/12/2008
Control Number
2008-055
Agenda Item Number
11.J.1
Entity Name
Masteller & Moler
Subject
Amendment No.1 to Work Order No.4 Services contract Force Main Replacen
Area
Lateral G Canal from 57th St. to Hobart Road
Supplemental fields
SmeadsoftID
6902
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Our File #0627LA <br /> January 24, 2008 <br /> NON-EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT <br /> CONTINUING CONSULTING SERVICES <br /> AMENDMENT #1 TO <br /> "EXHIBIT 1 " <br /> The Indian River County Utilities Department has decided to amend Work Authorization #4 <br /> which was approved by the Board of County Commissioners on July 11 , 2006 . The original <br /> project involved Engineering Services in connection with conversion of an existing 8" force main <br /> to an 8" reuse pipeline. The recently completed Reuse Master Plan does not include the 8" <br /> pipeline and shows that a 16" pipeline is needed to meet hydraulic conditions. Therefore, the <br /> Amendment provides for Engineering Services to remove the 8" force main and replace it with a <br /> 16" force main. The 8" force main to be removed and proposed replacement 16" reuse pipeline <br /> extends along Lateral G Canal from 57"' Street to Hobart Road, east of Hobart Road 500± LF <br /> and north across Hobart Road to the future Reuse Storage Tank site. The additional services <br /> covered by this Amendment #1 to the project will generally consist of the following piping <br /> modifications and additions to the original project: <br /> • Removal of approximately 16,000 LF of existing force main and replacing it with <br /> approximately 16 ,000 LF of 16" reuse main with all necessary fittings, valves and <br /> accessories. <br /> • Design a directional bore from the south side to the north side of Hobart Road to extend <br /> the proposed 16" reuse pipeline to the future Reuse Storage Tank site. <br /> • Disconnect and cap the existing 8" force main extending east along the south side of <br /> Hobart Road and also extending to the south from 57'" Street. <br /> Modify the existing piping at two (2) separate locations providing reuse water to the <br /> Sandridge Golf Course with appropriate valves and fittings in order that the existing <br /> reuse main and the proposed 16" reuse main can feed the Sandridge Golf Course with <br /> both pipelines or with each pipeline independently. <br /> • Reconstruct the existing 12" pipeline from the Bend Pine rapid infiltration basin area <br /> north under the existing ditch in order to increase the cover over the pipeline as it passes <br /> under the ditch . <br /> The estimated construction cost of the project as described in this Addendum #1 is <br /> $2, 0005000. 00 <br /> A brief description of the scope of services and deliverables for Work Authorization #4, <br /> Addendum #1 is provided below: <br /> (Y:1mm\Proj"\200610627\ADMMContmetslAMENDMENT # 1\0627_Exhibit 1_AmenM l_012408.dm) <br />
The URL can be used to link to this page
Your browser does not support the video tag.