Laserfiche WebLink
Our File #0627LA <br />January 24, 2008 <br />NON-EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT <br />CONTINUING CONSULTING SERVICES <br />AMENDMENT #1 TO <br />"EXHIBIT 1" <br />The Indian River County Utilities Department has decided to amend Work Authorization #4 <br />which was approved by the Board of County Commissioners on July 11, 2006. The original <br />project involved Engineering Services in connection with conversion of an existing 8" force main <br />to an 8" reuse pipeline. The recently completed Reuse Master Plan does not include the 8" <br />pipeline and shows that a 16" pipeline is needed to meet hydraulic conditions. Therefore, the <br />Amendment provides for Engineering Services to remove the 8" force main and replace it with a <br />16" force main. The 8" force main to be removed and proposed replacement 16" reuse pipeline <br />extends along Lateral G Canal from 57"' Street to Hobart Road, east of Hobart Road 500± LF <br />and north across Hobart Road to the future Reuse Storage Tank site. The additional services <br />covered by this Amendment #1 to the project will generally consist of the following piping <br />modifications and additions to the original project: <br />• Removal of approximately 16,000 LF of existing force main and replacing it with <br />approximately 16,000 LF of 16" reuse main with all necessary fittings, valves and <br />accessories. <br />• Design a directional bore from the south side to the north side of Hobart Road to extend <br />the proposed 16" reuse pipeline to the future Reuse Storage Tank site. <br />• Disconnect and cap the existing 8" force main extending east along the south side of <br />Hobart Road and also extending to the south from 57"' Street. <br />Modify the existing piping at two (2) separate locations providing reuse water to the <br />Sandridge Golf Course with appropriate valves and fittings in order that the existing <br />reuse main and the proposed 16" reuse main can feed the Sandridge Golf Course with <br />both pipelines or with each pipeline independently. <br />• Reconstruct the existing 12" pipeline from the Bend Pine rapid infiltration basin area <br />north under the existing ditch in order to increase the cover over the pipeline as it passes <br />under the ditch. <br />The estimated construction cost of the project as described in this Addendum #1 is <br />$2,0005000.00 <br />A brief description of the scope of services and deliverables for Work Authorization #4, <br />Addendum #1 is provided below: <br />(Y:1mm\Proj"\200610627\ADMMContmetslAMENDMENT # 1\0627_Exhibit 1_AmenM l_012408.dm) <br />