My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-055
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 11:51:45 AM
Creation date
9/30/2015 11:59:09 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
02/12/2008
Control Number
2008-055
Agenda Item Number
11.J.1
Entity Name
Masteller & Moler
Subject
Amendment No.1 to Work Order No.4 Services contract Force Main Replacen
Area
Lateral G Canal from 57th St. to Hobart Road
Supplemental fields
SmeadsoftID
6902
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AMENDMENT #1 TO EXHIBIT #1 <br />01/24/2008 <br />Page 2 <br />• Scope of Services <br />Task A — Contract Plans/Specifications <br />Masteller & Moler, Inc. will provide for the necessary surveying information and prepare <br />construction plans, specifications and contract documents to be incorporated in the original <br />project plans, specifications and contract documents covering the following project <br />Modifications and Additions: <br />• Removal of approximately 16,000 LF of existing force main and replacing it with <br />approximately 16,000 LF of 16" reuse main with all necessary fittings, valves and <br />accessories. <br />• Design a directional bore from the south side to the north side of Hobart Road to extend <br />the proposed 16" reuse pipeline to the future Reuse Storage Tank site. <br />• Disconnect and cap the existing 8" force main extending east along the south side of <br />Hobart Road and also extending to the south from 57 h Street. <br />• Modify the existing piping at two (2) separate locations providing reuse water to the <br />Sandridge Golf Course with appropriate valves and fittings in order that the existing <br />reuse main and the proposed 16" reuse main can feed the Sandridge Golf Course with <br />both pipelines or with each pipeline independently. <br />• Reconstruct the existing 12" pipeline from the Bend Pine rapid infiltration basin area <br />north under the existing ditch in order to increase the cover over the pipeline as it passes <br />under the ditch. <br />It is assumed that because the proposed reuse system is consistent with the County's Master <br />Plan, FDEP permitting will not be required. <br />Task B — Construction Services <br />Masteller & Moler, Inc. will provide construction services including periodic observation of <br />the pipeline modifications and additions covered in this Addendum #1 on an as needed <br />basis to observe that construction is in reasonable compliance with the contract plans. We <br />will attend meetings, review shop drawings and monthly pay estimates from the contractor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.