Laserfiche WebLink
Our File #0770 <br /> March 19, 2008 <br /> NON-EXCLUSSIVE PROFESSIONAL ENGINEERING AGREEMENT <br /> CONTINUING CONSULTING SERVICES <br /> EXHIBIT 1 <br /> Project Description <br /> Masteller & Moler, Inc. is pleased to provide you with this proposal for providing civil engineering <br /> services related to improvements to be made to Indian River County's Reuse Water System. <br /> The Scope of Services described herein has been developed based upon numerous meetings <br /> held with County Utilities Department staff. At said meetings, Masteller & Moler, Inc. was <br /> advised as to the immediate goals that County Utilities desires to achieve relative to its reuse <br /> water system. These goals and improvements are consistent with Indian River County's Reuse <br /> Water Master Plan. <br /> As a result, we have developed the following scope of work to be implemented to expand and <br /> improve the overall reuse water system: <br /> • Scope of Services <br /> I. DESIGN SERVICES <br /> Task A — Pumping and Storaae Systems — <br /> 1 ) We shall develop design and construction plans for reuse water storage and pumping <br /> facilities on the North County Wastewater Treatment Plant site. The proposed reuse water <br /> ground storage tank shall have a volume of 3 .0 MG as recommended by the Reuse Master <br /> Plan. The new pumping facilities shall be designed within a pre-fabricated structure to <br /> allow for improving delivery of reuse water to the Johns Island West and Red Stick golf <br /> courses as well as to allow (in the future) for delivery of reuse water to the barrier island <br /> Orchid Island, Windsor and Johns Island communities. <br /> We shall provide a soils investigation and structural engineering design services to support <br /> the design of the above described facilities. We shall also provide for electrical engineering <br /> design services to support the design for supply of electrical power to the above described <br /> facilities. We shall include a written performance specification stating the construction and <br /> operational requirements for a scada system consistent with County standards. <br /> The estimated construction cost for completion of the Task A improvements is <br /> $ 21330, 000. 00. <br />