Laserfiche WebLink
Exhibit #1 <br />3/20/2008 <br />Page 2 <br />Task B — Reuse Main Improvements — Under this Task we shall develop designs for <br />construction of new reuse main improvements. <br />As part of this Task, new reuse water mains and appurtenances will be designed to support <br />this project. Specifically, the following reuse main improvements will be designed: <br />1. 4200' lineal feet of existing 12" force main along CR510 from approximately the east <br />end of the bridge over the inter -coastal waterway to State Highway A -1-A shall be <br />replaced with 16" PVC and/or HDPE pipe. The east end will be designed to connect <br />to existing reuse mains on the west side of State Highway A -1-A. The west end will <br />be terminated with a valve and plug. The estimated construction cost for these <br />improvements is $ 5631500.00. <br />2. 2640' lineal feet of 16" reuse water main along Lateral "G" and Lateral "H" from 571h <br />Street to 53rd Street to connect to the existing reuse main extending west along 53rd <br />Street to the Waterway Village reuse water service connection. The design will <br />include a proposed directional drilled reuse main under the Indian River Farms Water <br />Control District's (IRFWCD's) North Relief Canal. The estimated construction cost for <br />these improvements is $ 366,400.00. <br />II. LAND SURVEYING SERVICES <br />Under this Task, land surveying services will be completed to support the design services <br />as described above in Section I - Tasks A & B. Specifically, the following land surveying <br />services will be provided: <br />A limited topographic survey of portions of the North WWTP site shall be performed <br />to support the design of the reuse storage and pumping improvements planned at <br />said site, <br />A route survey shall be performed along each of the proposed new reuse main <br />improvements limited and the CR 510 (East End of Bridge to A -1-A) replacement <br />main and the State Highway A-1 -A reuse main extension as described above, <br />A route survey shall be performed along Lateral "G" and Lateral "H" from 57'h Street <br />to 53'h Street including cross-sections of the existing North Relief Canal system. <br />III. SITE PLAN PERMITTING SERVICES NORTH PLANT SITE <br />In order that the reuse improvements to be designed under Task I may be constructed, we <br />shall make application for the following permits/approvals: <br />Task A (1) - North County Storage & Pumping Facilities <br />Indian River County Major Site Plan Approval <br />Indian River County Type "A" Stormwater Permit <br />