Laserfiche WebLink
Exhibit #1 <br /> 3/20/2008 <br /> Page 2 <br /> Task B — Reuse Main Improvements — Under this Task we shall develop designs for <br /> construction of new reuse main improvements. <br /> As part of this Task, new reuse water mains and appurtenances will be designed to support <br /> this project. Specifically, the following reuse main improvements will be designed : <br /> 1 . 4200 ' lineal feet of existing 12" force main along CR510 from approximately the east <br /> end of the bridge over the inter-coastal waterway to State Highway A- 1 -A shall be <br /> replaced with 16" PVC and/or HDPE pipe . The east end will be designed to connect <br /> to existing reuse mains on the west side of State Highway A- 1 -A. The west end will <br /> be terminated with a valve and plug . The estimated construction cost for these <br /> improvements is $ 5631500. 00 . <br /> 2 . 2640' lineal feet of 16" reuse water main along Lateral "G" and Lateral "H" from 57'h <br /> Street to 53rd Street to connect to the existing reuse main extending west along 53rd <br /> Street to the Waterway Village reuse water service connection . The design will <br /> include a proposed directional drilled reuse main under the Indian River Farms Water <br /> Control District's (IRFWCD's) North Relief Canal . The estimated construction cost for <br /> these improvements is $ 366 , 400. 00. <br /> II. LAND SURVEYING SERVICES <br /> Under this Task, land surveying services will be completed to support the design services <br /> as described above in Section I - Tasks A & B . Specifically, the following land surveying <br /> services will be provided : <br /> 1 . A limited topographic survey of portions of the North WWTP site shall be performed <br /> to support the design of the reuse storage and pumping improvements planned at <br /> said site, <br /> 2 . A route survey shall be performed along each of the proposed new reuse main <br /> improvements limited and the CR 510 ( East End of Bridge to A- 1 -A) replacement <br /> main and the State Highway A- 1 -A reuse main extension as described above , <br /> 3 . A route survey shall be performed along Lateral "G" and Lateral " H" from 571h Street <br /> to 531h Street including cross-sections of the existing North Relief Canal system . <br /> III. SITE PLAN PERMITTING SERVICES NORTH PLANT SITE <br /> In order that the reuse improvements to be designed under Task I may be constructed , we <br /> shall make application for the following permits/approvals: <br /> Task A ( 1 ) - North County Storage & Pumping Facilities <br /> Indian River County Major Site Plan Approval <br /> Indian River County Type "A" Stormwater Permit <br />