Laserfiche WebLink
Mr. Michael O'Brien <br /> 05/03/04 <br /> Page 2 of 5 <br /> D) Project location of all above ground and visible sub-surface improvements within <br /> corridor. Coordination with I.R. C . utilities and plotting of any exiting utilities to be <br /> included in this task. <br /> E) Trees not part of this scope unless aged large oaks and/or trees of possible concern. <br /> F) Delineate any areas of environmental concern. If areas exist I.R. C . shall mark areas as <br /> needed. (None expected) <br /> G) Cross-sections at 100 ' intervals or less as needed to determine terrain and/or features . <br /> Cross-section shall extend at least 50 ' beyond existing and proposed right-of--way line or <br /> greater as necessary to define grade. <br /> H) Any additional task as to supply all necessary information for design purposes not <br /> outlined hereon. <br /> Deliverables : To be used for design and records . <br /> A) 1 -24" x 36" certified sheet plans including cover, control sheet, topographic/cross- <br /> section and profiles at 100 ' intervals for design. <br /> B) 3 - 11 "x14 certified versions . <br /> C) File on disc. AutoCad 2001 or comparable (State Plane) . <br /> County Will Provide : (As needed) <br /> A) Recent Boundary survey (2003 ) of North portion (Hatala property) <br /> B) NGVD29 benchmarks in area. <br /> C) Existing Sketch and Description of acquired (Or to be acquired) corridor through private <br /> lands. <br /> D) GPS/State Plane control within a mile of site. <br /> Manhours : <br /> A) (3 ) Main Field Crew 120 hrs @ $ 115 . 00/hr $ 13 ,800 . 00 <br /> B) Drafting Time 70 hrs @ $65 . 00/hr $ 49550 . 00 <br /> C) Surveyors Time (Project Manager) 10 hrs @ $ 85 . 00/hr $ 850. 00 <br /> D) Administrative Time 6 hrs @ $ 35 . 00/hr $ 210. 00 <br /> Completion of Survey : <br /> Upon formal acceptance of this proposal, we will complete and deliver survey in 60 calendar <br /> days . <br /> HMM <br />