Laserfiche WebLink
IRC Work Order #7 <br />County Road 512 Ph. 3 — FINAL RNV monumentation <br />September 9`", 2008 <br />Page 8of9 <br />EXHIBIT "B" <br />CR512 Phase 3 <br />INDIAN RIVER COUNTY <br />RIGHT OF WAY MAP CHECKLIST <br />All Right-of-way projects shall adhere to Chapter 177 & 472, F.S. and Chapter 61G17, <br />F.A.C. as minimum and be certified as such. <br />R/W Maps shall be prepared/submitted in the form of a certified R/W Map will all <br />applicable certifications and criteria met. <br />1. Cover sheet/Key sheet. (To be supplied by IRC in DWG.) <br />2. Survey notes and report sheet. <br />3. Key sheet(s) <br />4. Survey Control sheet. <br />5. Subsequent R/W map sheets. <br />6. Supply a Box or area for county acceptance and/or certification. <br />7. Title Box of each sheet must contain: <br />a. County <br />b. State Road and/or County Road Number <br />C. Designed, drawn and checked by (use names or initials) & date <br />d. Scale <br />e. Field Book References <br />f. Sheet Numbers to be in numerical order (1, 21 31 4, etc.) NOT (1, 1A, 1 B, 2, etc.) <br />8. Any notes necessary to set out the type and/or purpose of the map shall be shown. <br />9. Provide in survey notes - all relevant resources to prepare the Right -of -Way map. <br />10. Show pertinent dimensions and bearings in the following fashion as the case may be: <br />a. Plat — (P) <br />b. Computed — (C) <br />C. Field — (F) <br />d. Deed (D) <br />11. Table of Ownerships shall show: <br />a. Parcel Number <br />b. Recording Data <br />12. Show stations and offsets to all Right of Way Breaks, bends, PC's, PT's, block corners (per plat). <br />13. Show stations, deflection (or bearing) of all intersecting section, % section lines to baseline (either <br />field or calculated as applicable). <br />14. Show monumented baselines and all references thereto. <br />15. Verify that computed distances and bearings are supported by field measurements. <br />16. Verify and/or monument significant elements of Baseline alignment shown.(i.e. curves, bearings <br />and P.I. Stations) <br />17. Ensure that significant elements of all curves are shown and are correct. Also show curve data on <br />all sheets where they appear. <br />18. Provide stations on the controlling baseline at the beginning, ending of R/W Project, 500' intervals, <br />all w bends, PC's, PT's, Pl's. <br />19. Stationing in field minimum 500' beyond beginning and ending of project. <br />20. Baseline (equate to intersecting State or County Jobs by Station and job number when available) <br />as available. <br />21. Projects shall be in NAD83/90 State plane coordinate system and bearings reference shall be <br />shown and must be clearly stated. Values shall be place on key baseline monumentation. <br />22. County/State lines <br />23. Section <br />