Laserfiche WebLink
tZIJ <br /> T <br /> INTERSECTION IMPROVEMENTS AT 0C Cl <br /> CR-510 AND US HIGHWAY 1 <br /> AMENDMENT NO, 4 TO THE PROFESSIONAL CIVIL ENGINEERING <br /> GEOTECHNICAL ENGINEERING & LAND SURVEYING SERVICES AGREEMENT <br /> BETWEEN McMAHON ASSOCIATES, INC . & INDIAN RIVER COUNTY, FLORIDA <br /> This is an amendment to the existing Professional Civil Engineering, Geotechnical Engineering and Land <br /> Surveying Services Agreement (AGREEMENT) dated May 17, 2005 , between McMahon Associates, Inc . <br /> (ENGINEER) and Indian River County (COUNTY) . This amendment addresses changes in "Section I — Project <br /> Limits and Description", "Section III — Scope of Services", "Section IV — Time for Completion, " and " Section V — <br /> Compensation, " of this AGREEMENT. <br /> "SECTION I - PROJECT LIMITS AND DESCRIPTION" is being modified to incorporate the following : <br /> Consultant services are required for the preparation of supplemental design survey, roadway design plans <br /> with the design of improvements within the present contract limits of the intersection of SR- 5/US- 1 and CR-510 <br /> (Wabasso Road), in Indian River County, Florida, as last amended on October 16 , 2007 . The <br /> roadway <br /> improvements identified by the COUNTY include the realignment of SR-510, east of US- 1 , 58 h Avenue and the <br /> addition of 59`b Avenue Frontage Road, and consist of the following : <br /> "SECTION III — SCOPE OF SERVICES" is being modified to incorporate the following : <br /> The ENGINEER agrees to perform professional design and related services in connection with the project, <br /> as required and set forth in the following : <br /> B . Design Surveys <br /> The ENGINEER shall provide supplemental design survey services necessary to support and facilitate <br /> contemplated design and permitting activities associated with this supplemental portion of the project. <br /> 1 . US- 1 Baseline resolution, within the DESIGN LIMITS . <br /> In a review of information obtained from the Florida Department of Transportation <br /> (FDOT) from Genesis Map files, discrepancies in the previously defined baseline were <br /> detected. Due to these discrepancies the project baseline needs to be field adjusted, and <br /> the project plans require updating, as well. <br /> 2 . Establish and update project wide horizontal and vertical control network for 58`h Avenue <br /> and 59`h Avenue Frontage Road within the DESIGN LIMITS . <br />