Laserfiche WebLink
INTERSECTION IMPROVEMENTS AT <br />CR -510 AND US HIGHWAY 1 <br />AMENDMENT NO, 4 TO THE PROFESSIONAL CIVIL ENGINEERING <br />ZIJ <br />T <br />40C C/ <br />GEOTECHNICAL ENGINEERING & LAND SURVEYING SERVICES AGREEMENT <br />BETWEEN McMAHON ASSOCIATES, INC. & INDIAN RIVER COUNTY, FLORIDA <br />This is an amendment to the existing Professional Civil Engineering, Geotechnical Engineering and Land <br />Surveying Services Agreement (AGREEMENT) dated May 17, 2005, between McMahon Associates, Inc. <br />(ENGINEER) and Indian River County (COUNTY). This amendment addresses changes in "Section I — Project <br />Limits and Description", "Section III — Scope of Services", "Section IV — Time for Completion," and "Section V — <br />Compensation," of this AGREEMENT. <br />"SECTION I - PROJECT LIMITS AND DESCRIPTION" is being modified to incorporate the following: <br />Consultant services are required for the preparation of supplemental design survey, roadway design plans <br />with the design of improvements within the present contract limits of the intersection of SR-5/US-1 and CR -510 <br />(Wabasso Road), in Indian River County, Florida, as last amended on October 16, 2007. The roadway <br />improvements identified by the COUNTY include the realignment of SR -510, east of US -1, 58 h Avenue and the <br />addition of 59`b Avenue Frontage Road, and consist of the following: <br />"SECTION III — SCOPE OF SERVICES" is being modified to incorporate the following: <br />The ENGINEER agrees to perform professional design and related services in connection with the project, <br />as required and set forth in the following: <br />B. Design Surveys <br />The ENGINEER shall provide supplemental design survey services necessary to support and facilitate <br />contemplated design and permitting activities associated with this supplemental portion of the project. <br />1. US -1 Baseline resolution, within the DESIGN LIMITS. <br />In a review of information obtained from the Florida Department of Transportation <br />(FDOT) from Genesis Map files, discrepancies in the previously defined baseline were <br />detected. Due to these discrepancies the project baseline needs to be field adjusted, and <br />the project plans require updating, as well. <br />2. Establish and update project wide horizontal and vertical control network for 58`h Avenue <br />and 59`h Avenue Frontage Road within the DESIGN LIMITS. <br />