My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-239
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-239
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 12:53:34 PM
Creation date
10/1/2015 12:27:15 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
08/12/2008
Control Number
2008-239
Agenda Item Number
8.T.
Entity Name
McMahon Associates,Inc.
Subject
Amendment No.4 Intersection Improvements
Area
CR 510 and U.S. Highway 1
Supplemental fields
SmeadsoftID
7506
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERSECTION IMPROVEMENTS AT <br />CR -510 AND US HIGHWAY 1 <br />AMENDMENT NO, 4 TO THE PROFESSIONAL CIVIL ENGINEERING <br />ZIJ <br />T <br />40C C/ <br />GEOTECHNICAL ENGINEERING & LAND SURVEYING SERVICES AGREEMENT <br />BETWEEN McMAHON ASSOCIATES, INC. & INDIAN RIVER COUNTY, FLORIDA <br />This is an amendment to the existing Professional Civil Engineering, Geotechnical Engineering and Land <br />Surveying Services Agreement (AGREEMENT) dated May 17, 2005, between McMahon Associates, Inc. <br />(ENGINEER) and Indian River County (COUNTY). This amendment addresses changes in "Section I — Project <br />Limits and Description", "Section III — Scope of Services", "Section IV — Time for Completion," and "Section V — <br />Compensation," of this AGREEMENT. <br />"SECTION I - PROJECT LIMITS AND DESCRIPTION" is being modified to incorporate the following: <br />Consultant services are required for the preparation of supplemental design survey, roadway design plans <br />with the design of improvements within the present contract limits of the intersection of SR-5/US-1 and CR -510 <br />(Wabasso Road), in Indian River County, Florida, as last amended on October 16, 2007. The roadway <br />improvements identified by the COUNTY include the realignment of SR -510, east of US -1, 58 h Avenue and the <br />addition of 59`b Avenue Frontage Road, and consist of the following: <br />"SECTION III — SCOPE OF SERVICES" is being modified to incorporate the following: <br />The ENGINEER agrees to perform professional design and related services in connection with the project, <br />as required and set forth in the following: <br />B. Design Surveys <br />The ENGINEER shall provide supplemental design survey services necessary to support and facilitate <br />contemplated design and permitting activities associated with this supplemental portion of the project. <br />1. US -1 Baseline resolution, within the DESIGN LIMITS. <br />In a review of information obtained from the Florida Department of Transportation <br />(FDOT) from Genesis Map files, discrepancies in the previously defined baseline were <br />detected. Due to these discrepancies the project baseline needs to be field adjusted, and <br />the project plans require updating, as well. <br />2. Establish and update project wide horizontal and vertical control network for 58`h Avenue <br />and 59`h Avenue Frontage Road within the DESIGN LIMITS. <br />
The URL can be used to link to this page
Your browser does not support the video tag.