Laserfiche WebLink
The project baseline work on 586 Avenue was included in the Pre -60% plan submittal, <br /> prior to determining the right-of-way control survey. It was agreed by the COUNTY to <br /> include the baseline, but revisions may be required. When the information became <br /> available and was received, it was determined that there are minor offsets in the current <br /> baseline requiring adjustments to the plans . The adjustments are required to roadway <br /> plans , cross-sections, signalization and signing and pavement marking plans profiles . <br /> The COUNTY has requested the addition of the 59`h Avenue Frontage Road to be <br /> included with the project. Additional horizontal and vertical field control including DTM <br /> survey will be established and the project plans updated to include this information. <br /> 3 . Establish and update project information to delineate wetland areas within the DESIGN <br /> LIMITS . <br /> Within the project limits, several areas have been identified as potential wetland areas . <br /> Only those potential wetland areas that are expected to be impacted by the project will be <br /> identified. Once these areas are identified, the project will be updated to include the <br /> wetland delineation, and each angle point/flag will be surveyed, and referenced to the <br /> project ' s horizontal control. <br /> B1 . Right-of-Wav-Survev <br /> The ENGINEER shall provide supplemental design survey to compile the accurate location of <br /> property parcels in the vicinity of 58th Court and 58`h Avenue, south of CR-510 and west of 58"' <br /> Avenue and east of the Indian River Farms Water Control District Canal No . Lateral-G, within the <br /> DESIGN LIMITS . <br /> The ENGINEER shall also provide for additional parcel sketches and legal descriptions for <br /> properties along both 58th Avenue and US- 1 , which are not supported by the project right-of-way <br /> model . <br /> The ENGINEER shall also provide for additional parcel sketches and legal descriptions for <br /> specific types of acquisitions, i. e . , temporary construction easements (TCE) , and for drainage areas <br /> in right-of-way or easements (DE) . The ENGINEER has been requested by the COUNTY to <br /> prepare the various parcel sketches and legal descriptions for this project . Each individual <br /> property may contain one or more types of these areas . The number of parcels and types will be <br /> estimated, based upon the Pre-60% Roadway Plans, and the current modification of SR-510 <br /> alignment, east of US- 1 , and the estimate of the ENGINEER from an evaluation of cross-sections , <br /> 2 <br />