drainage design and anticipated retention pond locations and corresponding outfall impacts . In the <br /> interest of time, and to assist the COUNTY with discussions with individual property owners along <br /> the corridor, it may be necessary or required to prepare a parcel sketch with multiple revisions . <br /> For those purposes, an estimate of 10% of the individual type of taking or easement will be <br /> quantified as a "re-do . " Below is a table of the total estimated project parcel sketches , and those <br /> that have been established to require the different types of easements and the associated unit cost <br /> that will be provided under Hourly Rate Components, in "Section V — Compensation. " <br /> R-510 SRw510 58th USA 10% <br /> SUPPORTED BY R/W MAP (W) (E) Ave (SR 5) redo Total # x FEE $ Totals <br /> R/W TAKE 41 7 5 53 $475.00 $259175 . 00 <br /> Temporary Construction Easement (TCE) <br /> 21 1 2 24 $200 .00 $4 , 800 . 00 <br /> Simple <br /> Complicated 10 7 2 19 $375.00 $7 , 125 . 00 <br /> Stand Alone 1 3 0 4 $475 .00 $ 1 ,900 .00 <br /> DRAINAGE EASEMENT (DE ) 16 4 2 22 $475 .00 $ 10 ,450 . 00 <br /> NOT SUPPORTED BY RNV MAP <br /> R/W TAKE 10 14 2 26 $700 .00 $ 18,200 . 00 <br /> Temporary Construction Easement (TCE ) <br /> 7 8 2 17 $200 .00 $ 3 ,400 .00 <br /> Simple <br /> Complicated 4 5 1 10 $475 .00 $4 ,750 . 00 <br /> Stand Alone 2 0 0 2 $700 . 00 $ 1 ,400 . 00 <br /> DRAINAGE EASEMENT (DE ) 2 5 1 8 $700 . 00 $5, 600 .00 <br /> TOTAL FEE REQUIRED 185 $82 ,800 . 00 <br /> EXISTING CONTRACT FEES AVAILABLE <br /> Parcel Sketches and Legal Descriptions (supported by R/W map ) 102 $375.00 $38 ,250 . 00 <br /> Parcel Sketches and Legal Descriptions ( not supported by R/W map ) 5. 5 $600 .00 $3 ,300 . 00 <br /> TOTAL EXISTING CONTRACT FEES AVAILABLE $41 ,550 .00 <br /> ADDITIONAL FEES REQUIRED FOR SA 4 $41 ,250 .00 <br /> DEFINITIONS <br /> Simple TCE = consistant offset to RMI Take or DE (shown by dimension on same sketch as RNV take or DE) <br /> Complicated TCE = inconsistant offset to RM/ Take or DE , requiring description <br /> Stand Alone TCE = where TCE required with no R/W take or DE , which will require its own sketch <br /> There is currently available $ 38 ,250 . 00 for parcel sketches and legal descriptions that were based <br /> upon a supported right-of-way model, and an additional3$ , 300 . 00 for parcel sketches and legal <br /> description for properties unsupported by the right-of-way model . The total of the effort computed <br /> above is8$ 2 , 800 , less the available ($41 , 550 . 00), leaves a remaining value of4$ 1 ,250 . This is the <br /> effort required for this work. When the fee utilized equals 75 %, the ENGINEER will assess and <br /> 3 <br />