My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-239
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-239
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 12:53:34 PM
Creation date
10/1/2015 12:27:15 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
08/12/2008
Control Number
2008-239
Agenda Item Number
8.T.
Entity Name
McMahon Associates,Inc.
Subject
Amendment No.4 Intersection Improvements
Area
CR 510 and U.S. Highway 1
Supplemental fields
SmeadsoftID
7506
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
drainage design and anticipated retention pond locations and corresponding outfall impacts. In the <br />interest of time, and to assist the COUNTY with discussions with individual property owners along <br />the corridor, it may be necessary or required to prepare a parcel sketch with multiple revisions. <br />For those purposes, an estimate of 10% of the individual type of taking or easement will be <br />quantified as a "re -do." Below is a table of the total estimated project parcel sketches, and those <br />that have been established to require the different types of easements and the associated unit cost <br />that will be provided under Hourly Rate Components, in "Section V — Compensation." <br />R-510 SR=510 58th US -11 10% <br />SUPPORTED BY R/W MAP (W) (E) Ave (SR 5) redo Total # x FEE $ Totals <br />R/W TAKE 41 7 5 53 $475.00 $259175.00 <br />Temporary Construction Easement (TCE) <br />21 1 2 24 $200.00 $4,800.00 <br />Simple <br />Complicated 10 7 2 19 $375.00 $7,125.00 <br />Stand Alone 1 3 0 4 $475.00 $1,900.00 <br />DRAINAGE EASEMENT (DE) 16 4 2 22 $475.00 $10,450.00 <br />NOT SUPPORTED BY RNV MAP <br />R/W TAKE 10 14 2 26 $700.00 $18,200.00 <br />Temporary Construction Easement (TCE) <br />7 8 2 17 $200.00 $3,400.00 <br />Simple <br />Complicated 4 5 1 10 $475.00 $4,750.00 <br />Stand Alone 2 0 0 2 $700.00 $1,400.00 <br />DRAINAGE EASEMENT (DE) 2 5 1 8 $700.00 $5,600.00 <br />TOTAL FEE REQUIRED 185 $82,800.00 <br />EXISTING CONTRACT FEES AVAILABLE <br />Parcel Sketches and Legal Descriptions (supported by R/W map) 102 $375.00 $38,250. <br />Parcel Sketches and Legal Descriptions (not supported by R/W map) 5.5 $600.00 $3,300. <br />TOTAL EXISTING CONTRACT FEES AVAILABLE $41,550, <br />ADDITIONAL FEES REQUIRED FOR SA 4 $41,250.00 <br />DEFINITIONS <br />Simple TCE = consistant offset to RMI Take or DE (shown by dimension on same sketch as R/W take or DE) <br />Complicated TCE = inconsistant offset to RM/ Take or DE, requiring description <br />Stand Alone TCE = where TCE required with no R/W take or DE, which will require its own sketch <br />There is currently available $38,250.00 for parcel sketches and legal descriptions that were based <br />upon a supported right-of-way model, and an additional3$ ,300.00 for parcel sketches and legal <br />description for properties unsupported by the right-of-way model. The total of the effort computed <br />above is8$ 2,800, less the available ($41,550.00), leaves a remaining value of4$ 1,250. This is the <br />effort required for this work. When the fee utilized equals 75%, the ENGINEER will assess and <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.