advise the COUNTY, if the balance of the work can be accomplished with the balance of the fee. <br />If the work cannot be completed, the ENGINEER will notify the COUNTY, in writing, and make a <br />request for a supplemental agreement. <br />Cl. Geotechnical Investigations <br />AS DIRECTED BY INDIAN RIVER COUNTY, THE COUNTY WILL PROVIDE THE ENGINEER <br />WITH THE BELOW DESCRIBED SERVICES AS STIPULATED TO COMPLETE THIS PORTION <br />OF WORK FOR THE HEREIN DESCRIBED PROJECT. <br />The ENGINEER has received the Soils Conditions Survey for the project. In and along the <br />corridor, the Geotechnical Consultant identified muck/organic deposits. Due to these existing <br />conditions, additional borings will be required for, and to delineate: muck/organic deposits; plastic <br />soils, and other deleterious subsurface, particularly in fill -conditions in existing ditches/canals. In <br />addition, additional geotechnical investigations are required to determine potential slope <br />instabilities in step cut areas, particularly adjacent to the Red Stick property. <br />D. Roadway Design/Plans <br />13. The ENGINEER shall modify the plans, as requested by the COUNTY, to provide a 4 -lane <br />roadway to 2 -lane roadway transition, at the project termini. This supplemental agreement <br />(Number 4) addresses the need to add back to the Hourly Rate Component, the $7,500.00 <br />estimate, as approved in Supplemental Agreement No. 2. This was due to the funds being <br />utilized, as decided by the COUNTY, for evaluation of impacts on a realignment of SR -510, <br />east of US -1, to avoid further and specific property impacts. <br />14. The ENGINEER shall modify the plans, as requested by the COUNTY, to address <br />supplemental storm water design. The project storm water design and plans preparation was <br />advanced following the receipt of review comments from the COUNTY on the Pre -60% <br />Plans. The ENGINEER and the COUNTY agreed upon specific aspects of the work, such as <br />follows: <br />• The western project limits up to and including the Red Stick property. It was <br />approved that the location of Retention Pond 1, on the Gordon Property would be <br />developed, and stormwater run-off would also be collected east of 58`s Avenue and <br />would connect to the Red Stick existing pond system. Several alternatives were <br />presented and coordinated with the Red Stick owner. It is assumed that the Red <br />Stick property existing drainage system, and any permit modifications required for <br />the CR -510 project will be included with this supplemental agreement (Number 4). <br />The ENGINEER has evaluated the existing Red Stick permit, and several scenarios <br />to route and convey the project drainage. There are currently six (6) drainage <br />0 <br />