Laserfiche WebLink
"SECTION IV - TIME FOR COMPLETION" is being modified to incorporate the following : <br /> The time for completion of 90% design drawings and permit applications associated with the scope of <br /> services detailed in this amendment (Number 4) will be four (4) months from the formal execution of this <br /> amendment (Number 4) . The adherence to this schedule is directly associated with, and impacted by <br /> several individual property owners where drainage facilities are anticipated to be located. Should these <br /> herein current project conditions be altered, the assumed time frame to complete the 90% plans will be <br /> effected. <br /> 9 <br />