My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-203
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-203
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2016 1:47:43 PM
Creation date
9/30/2015 7:56:37 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/24/2004
Control Number
2004-203
Agenda Item Number
11.J.1
Entity Name
Neel-Schaffer Inc.
Subject
North County Elevated Water Storage Tank Evaluation
Work Order No.001
Area
North County Storage Tank
Archived Roll/Disk#
3223
Supplemental fields
SmeadsoftID
4250
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Engineer will note any potential deficiencies of the north water system hydraulics . No detailed <br /> hydraulic modeling is proposed at this time. <br /> B . Option Evaluation <br /> The Engineer will evaluate the following potential options for addressing any deficiencies found <br /> during Task 3 A: <br /> • Modifying altitude valve system . <br /> • Increasing Tank Height. <br /> • Providing booster pumps and/or additional storage . <br /> • Adding a second North County Storage Tank. <br /> • Provide a budget cost of any suggested alternative considered above. <br /> The evaluation will include estimated construction costs for such options. The Engineer will also <br /> provide preliminary structural modifications of increasing tank height. Pumps sizing will be <br /> based upon local hydraulic conditions as impacted by these options . No system water network <br /> modeling will be provided. <br /> 4 . Progress Report Meeting <br /> The Engineer will present his preliminary findings at a meeting with County staff. The findings <br /> will be the results of Task 3 A. At that meeting the Engineer will also finalize the options to be <br /> considered in Task 3 B . The Engineer will then proceed to Task 5 . <br /> 5. Preparation of Technical Memorandum <br /> The Engineer will prepare a technical memorandum outlining the alternative system <br /> configurations , the results of the analyses, and the recommended improvements . The Engineer <br /> will provide three copies of the draft memorandum to the County for their review. Following <br /> review of the report by the County, the Engineer will meet with County and discuss the review <br /> comments . After receiving the comments, the Engineer will address the comments and prepare <br /> five (5 ) copies of the final technical memorandum to be submitted to the County. <br /> The Engineer will also attend one ( 1 ) Board of County Commission meeting to provide support <br /> for County staff presentation of Technical memorandum . <br /> COUNTY RESPONSIBILITIES AND ACTIVITIES <br /> The County will provide the following information or will perform the following activities : <br /> 1 . Provide the latest computer modeling file for the North transmission system and submit <br /> provided model results for options if directed. <br /> 2 . Provide a hard copy of appropriate sections of the County' s master plan (including <br /> updates) and supporting documents . <br /> 3 . Review of draft technical memorandums and reports in a timely manner. <br /> Page 2 of 3 <br /> C. \Documents and Settings\APFEFFER1Local Settings\Temporary Internet Files\OLKI F�WCG 001a - Proposal for North Elevated Tank doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.