4 . Provide a designated point of contact for the Engineer. <br /> SCHEDULE <br /> The services described above are anticipated to be completed in accordance with the following <br /> schedule : <br /> 1 . Kick off meeting within two (2) weeks of notice to proceed. <br /> 2 . Progress report meeting within two (2) weeks of the Kick Off Meeting <br /> 3 . The draft technical memorandum to the County within two (2) weeks of progress report <br /> meeting. <br /> 4 . Final technical memorandum within one ( 1 ) week of receipt of County comments on draft <br /> technical memorandum . <br /> COMPENSATION <br /> Compensation to the Engineer for services performed under this fee proposal will be in <br /> accordance with the lump sum method . The total lump sum amount to the Engineer shall be <br /> $ 19 , 100 . Billing shall be on a percentage complete basis . <br /> For the eer : <br /> Mel 9: (4 t�ZJ <br /> Stanley J . Ke ly PE <br /> Vice President <br /> Accepted by the CQU*yd �� M <br /> � ' . o <br /> ry <br /> Attest : J . K "` on, �Cle , : . INDIAN RIVER COUNTY, FLORIDA <br /> ti g BOARD OF COUNTY COMMISSIONERS <br /> a <br /> By: . By: <br /> Deputy Cl e k a . t ; Caroline D . Ginn, C airman <br /> BCC approval date : 08 - 24 - 2004 <br /> Appro o and legal <br /> Suffi i <br /> B <br /> a ' F 1 sis A rney <br /> ® Sepha A . alyd <br /> County Adminlstri for <br /> Page 3 of 3 <br /> C. \Documents and Settings\APFEFFER\Local Settings\Temporary Internet Files\OLKI F\WCG 001 a - Proposal for North Elevated Tank2.doc <br />