My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-193
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2016 9:22:48 AM
Creation date
9/30/2015 8:49:20 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
06/07/2005
Control Number
2005-193
Agenda Item Number
11.C.1
Entity Name
Turner Construction Co.
Subject
Amendment No.1 between owner and construction manager
Area
New County Administration Building
Supplemental fields
SmeadsoftID
4971
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County <br /> Administration Complex Turner <br /> Initial GMP Summary <br /> Qualifications and Assumptions <br /> Report Date : May 31 , 2005 <br /> The Initial GMP for the Indian River County Administration Complex is based on the Documents as listed <br /> herein and as modified / clarified through the following Qualifications and Assumptions . In the event of <br /> any conflicts between these Qualifications and Assumptions and any other Contract Documents , these <br /> Qualifications and Assumptions shall govern . <br /> GENERAL <br /> 1 We have assumed that the Cost of the following items are to be paid by the Owner and are not included <br /> in our GMP . <br /> Impact fees , special assessment fees <br /> Threshold Inspector <br /> Cost of Building Permits , Plan Review Fees , and related expenses <br /> Material Testing and Inspection <br /> Unforeseen Subsurface Conditions <br /> Utility Company charges and/or fees except for standard monthly power or water bills . <br /> Design or consulting costs <br /> Survey of existing project site <br /> 2 The GMP is based on standard manufacturer' s warranties as available in the industry at the time of <br /> purchase . <br /> 3 The GMP is based on having 30 days from receipt of a Notice to Proceed to mobilization . The GMP is <br /> based on a sixteen ( 16 . 0 ) month construction schedule from the day of mobilization to Substantial <br /> Completion , plus 2 months of close- out. <br /> 4 Turner assumes that the Owner will secure any air rights from adjacent property owners and permits with <br /> regard to the concrete pumps , cranes , and crane booms . <br /> 5 The GMP is based on drawings provided by Donadio and Associates which we assume have been <br /> designed in accordance with the current Florida Building Code . Any cost resulting from changes in <br /> Building Codes will result in an increase to the GMP . <br /> 6 The GMP includes Subcontractor Default Insurance at 1 . 3% of the direct cost of the work , in lieu of <br /> bonds furnished from subcontractors . Typical subcontractor bonding rates are between 1 . 5% to 2% , The <br /> use of Subcontractor Default Insurance results in savings to the Project . . <br /> 7 The following initial GMP costs will be billed in full in our first application for payment. The value of these <br /> items is based on the initial GMP amount . <br /> General Liability & Worker' s Compensation Insurance <br /> Subcontractor Default Insurance <br /> Performance and Payment Bonds <br /> 8 The Builder' s Risk Insurance will be billed in full in our first application for payment . The Builder' s Risk <br /> Insurance is based on the anticipated amount of the total project , not the initial GMP value . <br /> 9 Taxes , Insurance , Fringes and Benefits on Turner personnel are a fixed rate of 56 . 00% of raw payroll , <br /> exclusive of Worker' s Compensation Insurance . <br /> 10 All costs for Owner furnished and/or Owner installed items are not included in our GMP and will be by <br /> Owner . Owner shall provide delivery, distribution , uncrating and disposal costs . These items shall be <br /> furnished and installed in accordance with the construction schedule and as coordinated by Turner and <br /> so as not to adversely affect the Contractor' s approved construction schedule . These items may require <br /> out of sequence installation . <br /> 11 No retainage will be held on Owner Purchase Orders . <br /> C2 print date : 5/31 /2005 8 :59 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.