2005-193
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2016 9:22:48 AM
Creation date
9/30/2015 8:49:20 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
06/07/2005
Control Number
2005-193
Agenda Item Number
11.C.1
Entity Name
Turner Construction Co.
Subject
Amendment No.1 between owner and construction manager
Area
New County Administration Building
Supplemental fields
SmeadsoftID
4971
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County <br /> Turner <br /> Administration Complex <br /> Initial GMP Summary <br /> Qualifications and Assumptions <br /> Report Date: May 31 , 2005 <br /> 12 All changes to the plans and specifications must have "detailed , specific clouding " . Turner will not be <br /> responsible for changes appearing on plans without this annotation . Structural plans will have <br /> precedence over all other plans in case of conflicts . <br /> 13 The As- built drawings will consist of marked up construction drawings submitted to the Architect at the <br /> end of the project for final incorporation into the project record documents by the Architect and paid for by <br /> the Owner . <br /> 14 Revisions to contract scope will not be annotated on shop drawings or submittals . <br /> 15 We have not included any requirements for propriety specification requirements , unless indicated in this <br /> document. <br /> 16 The Architect is to provide electronic construction documents to Turner for preparation of coordination <br /> documents . <br /> 17 We have not included a separate jobsite trailer for the Architects use . We have included a trailer for the <br /> Owner's use . <br /> 18 The potential sales tax savings is included in the GMP as an allowance amount. <br /> 19 The Builder's Risk insurance is included with a deductible of $ 10 , 000 . This deductible is assumed to be <br /> paid by the owner and is not included in the GMP . <br /> 20 The start of the warranty is from the date of substantial completion for a period of one year. <br /> 21 The following positions are to be reimbursable <br /> On Site Personal ; Project Manager, Project Engineers , Field Secretary, Project Superintendent , <br /> Assistant Superintendent , Field Engineers , Site Safety Engineer. <br /> Off Site Personal in support of the Project : Principal - in -charge , Operations Manager, Project <br /> Executive , Purchasing Personnel , Community Relations Manager , Project Accountant , Administrative <br /> 22 Living and travel for the following positions are assumed to be reimbursable <br /> Project Manager , Project Engineers , Project Superintendent , Site Safety Engineer, <br /> 23 If applicable , liquidated damages will only begin to be imposed atter the substantial completion date for <br /> the project, as may be modified . <br /> 24 The GMP amount does not include the preconstruction cost. <br /> 25 The Construction Manager will engage Turner Logistics LLC for technical supply chain management <br /> services to competitively bid , purchase , expedite , and manage the delivery of major equipment and <br /> material . By doing so , multiple mark- ups from subcontractors and distributors ( historically averaging 20 <br /> to 25%) will be avoided . Turner Logistics Cost of Services ( COS ) shall be reimbursed at the rate of 10% <br /> for all such equipment and material purchased through this additional service . Historically this results in <br /> net savings to the Owner of 10 % to 15% . Turner Logistics compensation [including all equipment , <br /> material , applicable taxes and Logistics ' COS] shall be based on the approved GMP value submitted . <br /> The cost of services along with applicable taxes shall be included in the GMP proposal . This equipment <br /> will also be part of the Owner Direct Purchase Program , providing further savings to the Owner . <br /> Bid Package : 2 SITE WORK <br /> 1 The scope of the sitework excludes sidewalks , pavers , concrete paving and the site retaining wall . This <br /> work will be included in the next phase . <br /> 2 Vertical header curbs are included around landscape islands and not include at ends of parking spaces <br /> with wheel stops . <br /> Bid Package : 2a DEMOLITION <br /> C3 �Jprint date: 5/31 /2005 8:59 AM <br />