My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-193
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2016 9:22:48 AM
Creation date
9/30/2015 8:49:20 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
06/07/2005
Control Number
2005-193
Agenda Item Number
11.C.1
Entity Name
Turner Construction Co.
Subject
Amendment No.1 between owner and construction manager
Area
New County Administration Building
Supplemental fields
SmeadsoftID
4971
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County <br /> Administration Complex Turner <br /> Initial GMP Summary <br /> Qualifications and Assumptions <br /> Report Date: May 31 , 2005 <br /> 1 The existing fuel storage tank is assumed to be free of any contamination . Any required removal of <br /> material in the tank is assumed to be by the Owner. <br /> 2 The removal and remediation of any contaminated soil is excluded from the GMP . <br /> 3 Hazardous material survey and asbestos abatement is excluded from the GMP . <br /> 4 No cost is included for the removal of the power lines . It is assumed that this work will be performed by <br /> the utility company. <br /> 5 The cost for the removal or relocation of the underground fiber optic cables is not included in the GMP . <br /> 6 The GMP is based on the assumption that the retainage for the demolition subcontractor will be released <br /> after all their work is completed . <br /> Bid Package : 2b TREE RELOCATION <br /> 1 The GMP includes relocation of twenty trees to an on -site area. The trees to be relocated are numbered <br /> 979 1039 108 , 109 , 112 , 113 , 1349 135 , 138 , 139 , 144 , 145 , 146 , 150 1151 , 152 , 159 , 162 , 178 <br /> and 181 on <br /> the Tree Survey plan dated 10/ 11 /04 . <br /> 2 There is no warranty for the relocated trees . Trees are not guaranteed against tropical storm winds <br /> above 40 miles per hour, salt , cold temperatures , lethal yellowing , etc. <br /> 3 Any maintenance for the relocated trees is assumed to be by the owner. The GMP includes the initial <br /> fertilization and tree staking . <br /> 4 The GMP is based on the assumption that the retainage for the tree relocation subcontractor will be <br /> released after all their work is completed . <br /> Bid Package : 2c TEMPORARY FENCE <br /> 1 No screening is included with the temporary fence . <br /> 2 The temporary fence is included as 6' 0" chain link without a top rail . <br /> Bid Package : 3 FOUNDATION CONCRETE <br /> 1 Included in the Initial GMP are the column footings , elevator pits and continuous footings . The Initial <br /> GMP does not include the loading dock walls , slab on grade or masonry stem walls . <br /> C4 ) <br /> print date: 5/31 /2005 8 :59 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.