Act Activity Orig Months
<br /> ID Description Dur 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 17 18_
<br /> Construction Summary
<br /> Overall Construction Summary
<br /> MIAA164 Turner Receive Notice to Proceed (NTP) 0 OTurner Receive Notice to Proceed ( NTP)
<br /> MIAA168 Pre-Construction 14 Ill® re-Construction
<br /> MIAA169 Overall Project Duration - NTP to Sub Compl 468 Overall Project Dur
<br /> MIAA190 Substantial Completion 0 Substantial Completio
<br /> MIAA200 Close Out 42 Close O
<br /> MIAA210 Final Completion 0 Fir al Completior*
<br /> SUC0000 Bldg 1 Clean & Punch 30 Bldg 1 Clean & Pun
<br /> SUC0180 Final Inspections, Testing , Obtain CofO 40 Final Inspections, Testing, Obtain Co
<br /> Sitework Summary
<br /> SUSW000 Paving/ Site Amenities/ Landscaping 75' Paving/ Site Amenities/ Landscaping
<br /> SUSWO04 I Early Site - Mob thru Site Utilities 100` Early Site - Mob thru Site Utilities
<br /> Building 1 Construction Summary_
<br /> B1500 Building 1 Overall Summary 265' 3ullding 1 Overall S
<br /> 81504 UG MEP, Foundations thru Roof Dry-in 120' UG MEP, Foundations thru Roof Dry-in
<br /> B1508 MEP/FS Rough-in , Mtl Studs thru Wall 55' MEPIFS Rough-in , Mtl Studs thru Wall h ispections;
<br /> B1512 Barrel Tile Roof System thru Stucco & Ext Paint 75' Barrel Tile Roof System thrt Stucco &
<br />Ext Paint
<br /> 81516 Drywall thru Prime Paint 55' Drywall thru Prime Paint
<br /> B1520 Ceiling Grid , MEP/FS in Grid , Acou Ceiling Tile 55` Ceiling Grid, MEP/FS in Grid , Acou Ceiling T
<br /> B1524 AC, Finish Paint, Tile, Millwk, Carpet, & Clean 55` AC, Finish Paint, Tile, Millwk, Carpet, & Cie N
<br /> 81528 Clean & Prep, Owner/AE Punch List/Work 20 Clean & Prep, Owner/AE Punch List/Wo Q
<br /> Building 2 Construction Summary
<br /> 82500 Building 2 Overall Summary 218' Building 2 Overall Su maty
<br /> 82504 UG MEP, Foundations thru Roof Dry-in 91 ' UG MEP, Foundations thru Roof Dry-in
<br /> B2508 MEP/FS Rough-in, Mtl Studs thru Wall 50` MEPIFS Rough-in, Mtl Studs thru Wall Inspections
<br /> 82512 Barrel Tile Roof System thru Stucco & Ext Paint 60' Barrel Tile Roof System thru Stucco & Ext Paint
<br /> 62516 Drywall thru Prime Paint 40` ®Drywall thru Prime Paint
<br /> B2520 Ceiling Grid , MEP/FS in Grid , Acou Ceiling Tile 40` Ceiling Grid, MEP/FS in Grid, Acou eiling Tile
<br /> 82524 AC, Finish Paint, Tile, Millwk, Carpet, & Clean 46` AC , Finish Paint, Tile, Millwk, Carpet, & Cle
<br /> 82528 Clean & Prep, Owner/AE Punch List/Work20 Clean & Prep, Owner/AE Punch List/Wo
<br /> Sitework
<br /> SWA00 Mobilize, Instl Site Fence& Erosion Control 15 Mobilize, Instl Site Fence& Erosion Control
<br /> SWA04 Install Temp Water & Electrical 10 =install Temp Water & Electrical
<br /> SWA08 Demo Structures, Site Utilities, and Pvmt 15 ®Demo Structures, Site Utilities, and Pvmt
<br /> SWA12 Remove Trees, Clear & Grub Site, Site Grading 25 ®Remove Trees, Clear & Grub Site, Site Grading
<br /> SWA16 Prep Building Pads / Stake & Layout Buildings 5 â– Prep Building Pads / Stake & Layout Buildings
<br /> SWA20 Bldg 2 Building Pad Ready 0 * Bldg 2 Building Pad Ready
<br /> SWA24 Site Utilities - incl Storm 80 Site Utilities - incl Storm
<br /> SWA28 Construct Roadway Subgrade and Base 20 ®Construct Roadway Subgrade and Base
<br /> SWA32 Pavement & Sidewalks 30 Pavement & Sidewalks
<br /> Run Date 26MAY0507:38 IROA Turner Construction Company Sheet 1 of I1:01 Project Schedule
<br /> Finish Date 08DEC06
<br /> Data Date 11APR05 Indian River County Administration Facility
<br /> © Primavera Systems , Inc. GMP Summary Schedule
<br />
|