Act Activity Orig Months <br /> ID Description Dur .1 1 2 3 4 5 6 7 S 1 9 1 10 1 11 12 1 13 1 14 1 15 <br /> 16 17 18 <br /> SWA36 Site Lighting 15 ®Site Lighting <br /> SWA40 Irrigation & Landscaping _ 30 Irrigation & Lands ftaping <br /> SWA44 Demo Fiber Optic, CAN & OH Lines (by others) 15 ®Demo Fiber Optic, CAN & OH Lines (by others) <br /> SWA48 Pavers & Site Amenities 30 Pavers & Site Amenities <br /> SWA52 Bldg 1 Building Pad Ready 0 ® Bldg 1 Building Pad Ready <br /> Building 1 -- <br /> Foundations - Piles thru Lvl 1 Verticals <br /> B1000 Deep UG MEP Utilities (Below Footings) 10 ®Deep UG MEP Utilities (Below Footings) <br /> B1004 Excavate, Form, Rebar, Pour, Strip Footings 30 Excavate, Form, Rebar, Pour, Strip Footings <br /> Structure, Exterior, Roof <br /> 81008 CMU Walls & Tie-Beams to 2nd Lvl 35 CMU Walls & Tie-Beams to 2nd Lvl <br /> B1012 Rebar, Form, Pour, Strip Conc Columns to 2nd 15 Rebar, Form , Pour, Strip Conc Columns to 2nd Lvincl any conc beams <br /> B1016 Backfill & Compact SOG area 20 ®Backfill & Compact SOG area intermittent <br /> 81020 Scaffold, Set PSI Soffit Bms, Layout for Joists 15 ®Scaffold, Set PSI Soffit Bms, Layout for Joistsincl set spacers <br /> B1024 Set PSI Joists, Deck, Rebar & Pour 2nd Fir Slab 20 ®Set PSI Joists, Deck, Rebar & Pour 2nd Fir Slab <br /> 81028 Rebar, Form, Pour, Strip Conc Cols to Roof Lvl 15 I Rebar, Form, Pour, Strip Conc Cols to Roof Lvlincl any conc <br /> beam <br /> 81032 Set PreCast Columns, Beams & Arches 15 MONEW PreCast Columns, Beams & Arches <br /> B1036 CMU Walls & Tie Beams to Roof Lvl 20 ®CMU Walls & Tie Beams to Roof Lvl <br /> B1040 Metal Pan Stairs, Conc Fill , Railings 20 ®Metal Pan Stairs, Conc Fill, Railings <br /> 81044 Remove Forms & Shores, UG Utilities thru SOG 25 ®Remove Forms & Shores, UG Utilities thru SOG <br /> 81048 Erect Structural Steel, Bar Joists & Mtl Deck 25 ®Erect Structural Steel, Bar Joists & Mtl Deck <br /> 81052 Upper Rf - Lt Gage Frm'g thru Asph Sheets 10 =Upper Rf - Lt Gage Frm'g thru Asph Sheets <br /> B1056 Upper Rf - Facia, Block'g, Insul, Sheath'g , Ash 20 ffi®U M <br /> PP 9 9 P Upper Rf - Facia, Block'g, Insul , Sheath 'g , Asph A <br /> 81060 Upper Rf - Barrel Roof Tile & Gutters 25 ®Upper Rf - Barrel Roof Tile & Gutters <br /> B1064 Lower Rf - Mansard Trusses, Formdk, Sheathing 15 ®Lower Rf - Mansard Trusses, Formdk, Sheathing As h Sheet <br /> B1068 Lower Rf - Flat Rf Insulation & Lt Weight Conc 15 ®Lower Rf - Flat Rf Insulation & Lt Weight Conc <br /> B1072 Lower Rf - Flat Rf Modified Bitumin Roofing 10 =Lower Rf - Flat Rf Modified Bitumin Roofing <br /> B1076 Lower Rf - Mansard Barrel Tile & Gutters 15 ®Lower Rf - Mansard Barrel Tile & Gutters <br /> 81080 Lath & Stucco (incl molded crown & trim) 50 Lath & Stucco (incl molded crown & trim) <br /> B1084 Standing Seam Roof 15 ®Standing Seam Rood incl peel & stick wtr roof membrane <br /> B1088 Window / Storefront & Ext. Doors 30 ®Window / Storefront & Ext. Doors <br /> B1092 Exterior Paint 25 ®Exterior Paint <br /> Interior / Finishes <br /> 81096 MEP/FS Risers (Vents, Stacks, Fdrs, RWLs) 25 MEP/FS Risers (Vents, Stacks, Fdrs, RWLs) <br /> 81100 Plumbing Rough-in (incl water piping & insul) 35 ®Plumbing Rough-in (incl water piping & ins l)CW, HW, Dom, <br /> WV <br /> 61104 HVAC Rough-in (Ductwork, Insulation) 70 HVAC Rough-in (Ductwork, Insulat on) incis Set AHUs <br /> B1108 Elect Pwr/Ltg/FA/Systems Rough-in 70 Elect Pwr/Ltg/FA/Systems Rough in Walls/Ceilings <br /> 81112 Fire Sprinkler Rough-in & Pressure Test 50 ®Fire Sprinkler Rough-in & Pressure Test <br /> 81116 HMtl Dr Frames, Mtl Stud Walls, Soffits, Ceil'gs 50 HMtI Dr Frames, Mtl Stud Walls, Soffits, Ceil'gs <br /> B1120 Install Hydraulic Elevators, Finish, Inspections 55 Install Hydraulic Elevators, Finish, Inspections <br /> 81124 Drywall, Tape & Finish Walls, Soffits & Ceilings 50 ®Drywall , Tape & Finish Walls, Soffits & Celling <br /> B1128 Main Stair & Balconys - Stru, Railings, Finish 50 Main Stair & Balconys - Stru, Railings, Fini <br /> B1132 Controls - Wiring , Devices, Test & Check-out 35 ®Controls - Wiring, Devices, Test & Check-ot <br /> 81136 1st Coat & Prime Paint 40 1st Coat & Prime Paint <br /> Run Date 26MAY0507:38 IROATurner Construction Company Sheet of R01 Project Schedule <br /> Finish Date 08DEC06 <br /> Data Date 11APR05 Indian River County Administration Facility <br /> © Primavera Systems , Inc. GMP Summary Schedule <br />