Laserfiche WebLink
Indian River County Administration Complex <br /> Bldg. 1 - 2nd Floor - West - Punch List <br /> Tuesday - 07/ 17/07 & Thursday -07/ 19/07 <br /> July 26, 2007 <br /> Page 26 <br /> Office 805 <br /> 1 . Carpet at Office 805 needs to be worked . <br /> 2. Bottom left and right sides of door frame needs to be painted where it has been scratched. <br /> 3 . Drywall along light switch to the left of Door 805 needs to be patched and repaired. That is also true of the <br /> electrical outlet in this same area. <br /> 4. Top left comer of Door 805 needs to be sanded and repainted. <br /> 5 . Exterior wall right inside corner of boxed out column , joint cut too large at the vinyl base, paint on the vinyl <br /> base. <br /> 6. Furniture installed in this office. <br /> 7. Exterior window needs to be cleaned of paint over spray . <br /> 8. Ceiling grid on the radius wall joint has large gap at the joint, grid is unacceptable. <br /> 9. Ceiling tile just to the right of the sprinkler head in front of the top left of Door 805, fingerprints on the tile. <br /> 10. Ceiling grid on the west wall, two full tiles off the exterior wall, joint at the grid is unacceptable. <br /> 11 . Carpet at door frame 805 is cut too short. <br /> GENERAL NOTES : <br /> I . All plastic laminate pilasters and wood base need to be cleaned of dirt and drywall dust, especially on the <br /> inside comers and top edges , and finishes need to be cleaned of glue, paint, etc . <br /> 2 . All carpet where it is cut into the hollow metal doorjamb needs to be re-looked at. Concern that debris has <br /> not been cleaned up off the floor. Carpet that is laying flush to the floor is very rough and irregular, not cut <br /> neat to the hollow metal door frame. <br /> 3 . All black trim work, at the plastic laminate pilasters, need to make sure that the finish nail heads are filled and <br /> painted edges are finished, all faces are smooth, no irregular finish in the painted black, all dirt, debris and any <br /> chips or scratches need to be patched and repaired. <br /> 4. All cove moldings need to have the finish nail heads filled and stained to match the finish of the cove <br /> molding. <br /> 5 . All cove moldings in the recess ceilings need to be caulked where they abut the drywall, bottom and top edge. <br /> 6. All wood doors in numerous areas have paint in the grain, needs to be cleaned off. <br /> 7 . All windows sills on the underside should be cleaned of paint and caulked where the window sill abuts the <br /> drywall. <br /> 8 . In the Commissioners Offices all recessed can light switches need to be cleaned of drywall mud, dirt and <br /> debris and set flush to the drywall and caulked neatly in place . <br /> 9. All light switch covers, electrical outlet devices need to be cleaned of paint, drywall mud, etc. <br /> 10. All inside and outside comers of vinyl base, the profile base need to be cut tight and no open joints and <br /> secured to the wall. <br /> 11 . All cabinetry needs to be adjusted so the door and drawers set level and plumb and operate properly. <br /> 12. All vinyl base profiled and flat need to be cleaned of drywall dust, scratches, dirt, debris , etc. <br /> End of Punch List Building 1 — 2 d Floor - West <br /> D O N A D I O <br /> & Associates, Architects, P.A . <br />