Laserfiche WebLink
Indian River County Administration Complex <br /> Bldg. 1 - 2"d Floor - West - Punch List <br /> Tuesday - 07/17/07 & Thursday -07/ 19/07 <br /> July 26, 2007 <br /> Page 25 <br /> Clerk To The Board - Reception 801 (continued) <br /> 16. Top right of the drywall header just to the left of Door 801D ceiling grid is pulled off the drywall , needs to be <br /> cleaned of paint. <br /> Vault 802 <br /> 1 . Hollow metal Door 802 left side above the strike door is damaged needs to be repainted . <br /> 2. Outside face of Door 802 at the strike side needs to be cleaned of paint <br /> 3. Hollow metal frame to the right of the strike on the inside needs to be sanded and repainted above and below <br /> the strike. <br /> 4. Drywall to the right of the hollow metal frame needs to be sanded and repainted along with the frame the right <br /> and left sides of hollow metal frame the vinyl base and to the top edge. <br /> 5 . Drywall where it abuts the hollow metal frame Door 802 needs to be sanded, caulked and repainted. <br /> 6. Electrical outlets need to be cleaned of paint and cover plates need to be cleaned of drywall mud. <br /> 7. North wall westernmost electrical outlet drywall around this outlet needs to be sanded and repainted, rough <br /> and irregular. <br /> 8. Ceiling grid along the west wall to the right of Door 802 damaged. <br /> 9. Ceiling tile in front of Door 802 not in place. Also, ceiling tile, the 2nd ceiling tile in front of Door 802 tile is <br /> damaged. <br /> 10. Lenses for light fixtures need to be cleaned of dirt and debris at the prismatic lens . <br /> 1 t . Angled wall inside comers, holes in the drywall needs to be patched and repaired and ceiling grid around the <br /> perimeter needs to be cleaned of drywall mud. <br /> 12. Vinyl base around free standing column is not secured at the corners. <br /> Production Area 803 <br /> 1 . Right of Door 112 drywall above vinyl base needs to be sanded and repainted. <br /> 2. Door 805 needs a wall stop or floor stop. <br /> 3 . Counter top in Production area, white caulking was used between the back splash and the counter top, <br /> unacceptable, needs to be redone with caulking to match the finish of the top. <br /> 4. Underside of counter top on the upper cabinets, need to be cleaned of drywall mud. <br /> 5 . Left outside corner to the left of the base cabinets needs to be repainted, rough and irregular. <br /> 6. Vinyl base at the kick for the cabinetry not secured tight to the cabinetry kick. <br /> 7 . Two ceiling tiles to the left of Door 803 and two ceiling tiles off this same wall for Room 803, tile is <br /> damaged. <br /> Open Office Area 804 <br /> 1 . Drywall to the left of open shelving for Reception counter just below the counter top needs to be repainted. <br /> Also, above the vinyl base. <br /> 2. Right side where the open shelving abuts the drywall needs to be caulked and repainted. <br /> 3 . System furniture in place in this complete area. <br /> 4. Bottom edge of cabinetry needs to be cleaned of carpet glue. <br /> 5 . Ceiling grid at the dropped header over the Reception counter needs to be cleaned of drywall mud. <br /> 6. Ceiling tile just in front of the center recessed can light edges are chipped. <br /> 7 . Ceiling grid coming off the right recessed can light at the Reception counter header, three grids in are <br /> damaged at the sprinkler head. Also, debris in the grid . <br /> 8. Back left corner ceiling tile not in place at two locations. <br /> 9. Ceiling tile at the sprinkler head coming off the left recessed can light at the Reception counter, damaged. <br /> 10. Ceiling tile damaged, the 3rd ceiling tile coming off the cabinets in the Production area near the A/C diffuser. <br /> D O N A D I O <br /> & Associates, Architects, P.A. <br />