My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-263B
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-263B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2016 10:52:07 AM
Creation date
9/30/2015 11:02:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Migration
Approved Date
08/20/2007
Control Number
2007-263B
Agenda Item Number
county administer signature
Entity Name
Donadio & Associates
Subject
Punch List Building 1 - 2nd Floor - West Half
Area
New County Administration Building
Supplemental fields
SmeadsoftID
6490
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Administration Complex <br /> Bldg. 1 - 2nd Floor - West - Punch List <br /> Tuesday - 07/ 17/07 & Thursday -07/19/07 <br /> July 26, 2007 <br /> Page 3 <br /> Lobby 2-107 (continued) <br /> 15 . South wall to the right of Door 2-501 right face east face of the boxed out pilaster needs to be cleaned of paint <br /> on the laminate finish and also the black trim pieces . Also, black trim pieces need to be repainted, very rough <br /> and irregular on the face of the trim. <br /> 16. Right side of pilaster to the right of Door 2-501 bottom black trim piece is not secured properly to the pilaster. <br /> Also, on this west side of the same pilaster glue on the face needs to be cleaned and removed. <br /> 17. Base to the left of Door 2-501 needs to be cleaned of glue. <br /> 18. Bottom left of hollow metal frame wood door 2-501 needs to be sanded, caulked and repainted. That is also <br /> true of the top edge of that complete hollow metal door frame system, needs to be sanded, caulked and <br /> repainted at the drywall. <br /> 19. Wood base around the laminate boxed out pilaster numerous areas the base is not set tight to the plastic <br /> laminate finish. <br /> 20. Cove ceiling above Door 2-501 , finished nail heads need to be patched and refinished, visible. <br /> 21 . Cove molding above Door 2-501 needs to be caulked where it abuts the plaster from the bottom edge and the <br /> top edge. <br /> 22. Drywall around the A/C diffuser needs to be caulked in place above Door 2-501 . <br /> 23 . North wall westernmost wood pilaster bottom of base is scratched, needs to be repaired . Also, the <br /> westernmost pilaster the right and left, north and south, carpet is cut short, this needs to be corrected. <br /> 24. Carpet at Door 2-501 on the corridor side not cut in properly to the hollow metal frame, carpet is set over <br /> concrete, irregularity, not acceptable. Needs to be redone. <br /> 25 . Bottom left of Door 2-501 , base or the side of the wood base at the carpet is chipped, cracked, needs to be <br /> repaired. <br /> 26. Right side of Door 2- 109 wood base is not caulked to the hollow metal frame. <br /> 27 . Left side of Door 2-209 top left corner needs to be repainted in the plaster. <br /> 28. Carpet area between Door 2- 109 and 2-503 carpet glue and paint on the carpet; this needs to be cleaned off. <br /> 29. Right side of Door 2- 109 and left side of Door 2-503 wood base does not set tight to the carpet. There is <br /> actually a tapered void underneath this, needs to be corrected. <br /> 30. Cove ceiling trim between Doors 2- 109 & 2-503 need to have holes for finished nails touched-up and stained <br /> to match the wood. Also, cove molding needs to be caulked where it abuts the drywall at the upper and lower <br /> locations . <br /> 31 . Motion detector in front of Door 2-109 opening cut too large in the drywall, needs to be patched and repaired. <br /> Corridor 2-108 <br /> 1 . East end of Corridor 2- 108 right plastic laminate pilasters, the west face needs to be cleaned of glue on the <br /> bottom edge above the wood base and also top left corner of the arched area has scratches in the finish . That <br /> is also true of the south pilaster in the west face, needs to be cleaned of paint and glue and scratches, needs to <br /> be corrected. <br /> 2. Right pilaster north side opposite Door 2- 109 the side adjacent to the drywall, chips in the edges , finish of the <br /> laminate return has paint on the finish and caulking needs to be redone. That is also true on the left column or <br /> the south column. <br /> 3 . South pilaster outside comer plastic laminate finish is chipped between the base and the I " black trim piece. <br /> 4. Drywall above borrowed light BLl 2- 105 outside face needs to be sanded, caulked and refinished. <br /> 5 . Plastic laminate pilasters to the left of Door 2- 105 , between the wood base and the la` black trim piece, plastic <br /> laminate warped, there is actually waviness in the plastic laminate. Also, outside corners edges of the plastic <br /> laminate need to be cleaned of glue. That is also true of the plastic laminate pilaster on the opposite side of <br /> the corridor needs to be cleaned of paint, glue at the outside edges. <br /> D O N A D I O <br /> & Associates, Architects, P.A . <br />
The URL can be used to link to this page
Your browser does not support the video tag.